status of the second field cage

Slides:



Advertisements
Similar presentations
TPC meeting, Sardinia, May 2004Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, Sardinia, May 2004 Børge Svane Nielsen Niels Bohr.
Advertisements

TPC meeting, CERN, January 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, January 2003 Børge Svane Nielsen Niels Bohr.
Flange-lok Installation Instructions Quick Installation Guide rev. DB.
TPC meeting, NBI, 2-3 September 2002Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, Copenhagen, 2-3 September 2002 Børge Svane Nielsen, Jørn.
TPC meeting, CERN, 7-8 October 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 7-8 October 2003 Børge Svane Nielsen, Niels Lindegaard,
19.Dez Volker Prahl Space frame endplate. 1 1 WPM 186, Volker Prahl Guide ring necessary HV-Connector.
Ties Behnke, LP, EUDET, Germany etc: Status Report. 1 The LP-TPC Fieldcage Project Goal: design, develop and build a field cage for a “Large Prototype”
 Introduction  Designing of Die Block  Process of making Press Form Points to be Covered PRESS FORM AND RUBBER TECHNOLOGY.
Old Main Group. Design Issues There are no changes to the overall Design It will remain the way it is The Attachment Issue is resolved Going to screw.
Status of the LARP Phase II Secondary Collimator Prototype 30 September 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US.
PERSISTENT SURVEILLANCE FOR PIPELINE PROTECTION AND THREAT INTERDICTION Micromachining of Inertial Confinement Fusion Fast Ignition Targets Michael Mauldin.
Status of the LARP Phase II Secondary Collimator Prototype 14 October 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
IBL Mock Up IBL Mock Up MANUFACTURING 2011/04/29 François-Xavier NUIRY Maxence CURDY Andrea CATINACCIO CERN PH/DT/PO 1.
ZQNA Electrostatic Quadrupoles for ELENA Transfer Lines 1.Conceptual design 2.Performance 3.Engineering details 4.Interfaces 5.Production planning D. Barna,
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
Single PET-module Design Update 1 TRIMAGE Meeting Munich, Dec. 12,2014 WP 3 Design and optimization of PET-system Andreas Seebacher, raytest.
Mickael Frotin– 07/06/2009 Demonstrator - Assembly ECAL meeting - London.
Steady Rests, Follower Rests, and Mandrels
FEBRUARY 2003 Pixel Support Tube A. Smith LBNL 1 ATLAS Pixel Support Tube PRR: Parts Pixel Support Tube Production Readiness Review Parts Overview Alexis.
ILC / ILD TPC Requirements of the support mechanics Volker Prahl ILD Workshop 2013 Cracow
PETS EuCARD. Present status and precision assembly L. Sánchez, F. Aragón, J. Calero, J.L. Gutiérrez, E. Rodríguez, F. Toral, CIEMAT 26/10/2011.
Flex Cam – Training This shows one version of a complete FlexCam system including Power Unit HCP and Compact Cam CC for piercing operation.
SQXF Winding Test Proposal Concept at LBNL Dan Cheng Sept 17, 2013.
BARREL ALIGNMENT PLATFORM POSITIONING Goal: Positioning of the platforms at their nominal position on the MDT chambers (No position measurement in a database).
DOE Rev of Run IIb Sep 24-26, Detector Production WBS James Fast Fermilab.
Alice overview New detector and chamber ALICE TC.
EPS-HEP 2015, Vienna. 1 Test of MPGD modules with a large prototype Time Projection Chamber Deb Sankar Bhattacharya On behalf of.
Dmitry Gudkov BE-RF-PM CLIC Module Working Group Engineering design of the adjustable supporting system for DBQ.
11/05/2000Wire Chamber Working Group Visit to Fermilab Participants: –Giulio Auriemma, Thomas Schneider, Burkhard Schmidt General Remarks: –Visit was organized.
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
1.3GHz Input Coupler for ILC
Thermo-mechanical petal status Sergio Díez Cornell 23Jan 2015.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
ATLAS Pixel Detector July 2003 SC Pixel Meeting N. Hartman LBNL 1 Pixel Support Tube WBS Santa Cruz Cost Workshop July 9, 2003.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
D. Peterson, for discussion of LC-TPC LP, interface of Endplate and Field cage, Discussion of the LP endplate and field cage geometry A version.
Meeting at Chooz PMTs Mechanical support on the Buffer. Updates. Enrique Calvo Alamillo
Ladder Mount R&D T. Tsuboyama (KEK) 2 Oct T. Tsuboyama (KEK) 2 Oct
ENM208 INTRODUCTION to MACHINING ANADOLU UNİVERSITY Industrial Engineering Department.
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
Clive Field, Venkat Srinivasan Undulator Week: BFW Card Status Update 04/30/ BFW Card Status on behalf of: Keith Caban.
1 1Dr. V.P.Ovsiannikov Cryogenics and vacuum in Dreebit EBITs The vacuum problem in EBIST is the problem of ensuring high vacuum into a long drift tube.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
ROLLING Rolling is a process of reduction of the cross-sectional area or shaping a metal piece through the deformation caused by a pair of metal rolls.
A.Ryazantsev, IHEP-Protvino, RussiaPANDA Russia Workshop at Moscow, May 2015 Status on Barrel Mechanics Andrey Ryazantsev on behalf of the IHEP-Protvino.
Florian Buchsteiner (HEPHY Vienna)
Sns college of engineering Department of mechanical
UNIT-II TURNING MACHINES
Update on Pavia MM mechanical prototype
Different Types of Lathe Operations And Alignment Test
BSS Prep work at CERN and Acceptance of Parts
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Collimator RC1
New field cage LP2 Ole Bach, Bernd Beyer, Volker Prahl
SNS COLLEGE OF ENGINEERING
On behalf of the GEMs for CMS Collaboration
Requirements of the support mechanics
LCLS Undulator Fiducialization
WG4 – Progress report R. Santoro and A. Tauro.
Facing & Center Drilling
Gas Monitoring Chamber Production Status
New MWPC for CB Status Report Oct 2004
PERMANENT MAGNET QUADRUPOLE FOR THE LINAC 4 CCDTL
LARP Phase II Secondary Collimator RC-1
LARP Phase II Secondary Collimator RC-1
OLYMPUS Collaboration Meeting Luminosity Monitor Calorimeter
Presentation transcript:

status of the second field cage Fieldcage II status of the second field cage Volker Prahl ECFA Workshop DESY 2013 31.05.2013 Bernd Beyer, Ole Bach, Vitalij Peer

Mechanical status of the field cage II Overview Mechanical status of the field cage II Field cage I, short review Mandrel Next tasks Dummy cage Field cage II Mounting tool Outlook

Mechanical status of the field cage II Field cage I, short review Specific reasons to build a new field cage Misalignment of the rotational axis of the field cage Fig.2 To gain experience in composite materials and fabrication Design improvements

Mechanical status of the field cage II Field cage I, short review r = 0.87±0.07mrad Fig.1 Fig.2 Design parameter of the field cage Measured parameter of the field cage See also: (http://iopscience.iop.org/1748-0221/5/10/P10011) A lightweight field cage for a large TPC prototype for the ILC P.Schade

Mechanical status of the field cage II Mandrel Fig.4 Flat and surface for Support pin on both sides Fig.3 Mandrel with field strip layer Screw to adjust the diameter Fig.4, 5 Mandrel after machining Fig.5

Actual tools Mandrel actual status After decreasing you cant adjust the mandrel to the right diameter again OD after machining on the lathe 1.6mm less than design value this is the min dia. accepted of the length of the field strip foil Preparation for the support pins in progress Preparation for gluing tests in progress

Mandrel Geometrical values after machining OD is 1.6mm less than design value of 720.0±0.3mm

Mandrel Machining now in progress Very precise arrangment necessary Next tasks Mandrel Machining now in progress Very precise arrangment necessary Design of the support structure in progress Fig.5 Adjustment of the Mandrel Fig.6 Support structure by Ole

Dummy cage To gain experience in: Fabrication of composite materials Next tasks Dummy cage To gain experience in: Fabrication of composite materials How to glue the end flange (solid ring or single parts) To get experience how precise we can build the field cage Improve the technologie Is it possible to slide the cage over the mandrel without degreasing Discover unknown issues

Field cage II Design improvements Other tasks Next tasks HV contact of first and seventh field strip Threaded inserts in end flange plastic with low Xo? Optimized wall design GFK, Nomex New field strip foil? Only one in usable condition Other tasks Mounting tool Cathode Field cage position measuring

Mounting tool Next tasks First test are done Short modification to reduce the play in progress Final tests provided in June Fig.7 Mounting tool / alignment plate

Thank you! Outlook Mandrel Material has to be orderd Dummy field cage Field cage II Support structure of the cathode Mounting tool Stage maintenance Thank you!