6th Spanish Workshop on Future Accelerators Granada May 2011

Slides:



Advertisements
Similar presentations
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE The DevDET/EUVIF Program: a FP7 project CHIPP Workshop on detector R&D Geneva, June 2008 Daniel.
Advertisements

Helsinki Sept 2007 S.Galés ERA-NET Supporting Cooperation for research infrastructures in all S&T fields 7 th FP Call Capacity Work Program: Infrastructures.
SiTRA brief status report to the EUDET S.C., August 31 st 2009 Members: Helsinki University and VTT(Helsinki), LPHNE-UPMC/CNRS-IN2P3 (Paris), Charles University.
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement AIDA status report.
Thermo-mechanical infrastructure: Environmental Monitoring with FOS AIDA WP9.3 meeting November 21 th DESY, Hamburg. David Moya Martin Instituto de Física.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Overview of EuCARD-2.
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement L. Serin LAL/IN2P3/CNRS.
Tobias Haas DESY 7 November 2006 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET Pixel Telescope Pixel Telescope.
L. Serin LAL/Orsay/IN2P3 EUDET Meeting01/10/101 Organization & status of the project EUDET  LC activities in AIDA Conclusion
1 EUDET Kick-off Meeting Summary and Outlook Where are we now and where do we go from here? Joachim Mnich DESY
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
ATTRACT is a proposal for an EU-funded R&D programme as part of H2020 for sensor, imaging and related computing (ICT) development Its purpose is to demonstrate.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
Anselmo Cervera Villanueva IFIC (Universidad de Valencia & CSIC) EURODET meeting 7 December 2007 Neutrino Networking activities.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
SiD LoI preparation workshop, SLAC 3th March 2009 Spanish Network LoI contribution Iv á n Vila Á lvarez Instituto de F í sica de Cantabria [CSIC-UC]
WP9.4 baseline deliverable summary 10 December 2014 Thomas Bergauer (HEPHY Vienna)
Status of QUACO project
CLICdp achievements in 2014 and goals for 2015 Lucie Linssen, CERN on behalf of the CLICdp collaboration CLIC workshop, January 30 th
L. Serin LAL/IN2P3/CNRS March 26th AIDA-2 proposal Reminder of targeted call in H2020 (shown at Feb 17 th meeting) Organization Status of Trans.
11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.
Lucie Linssen, PH senior staff meeting 23 Nov ’05 slide 1 EUDET Links: Public EUDET pages: Internal EUDET pages:
1 EUDET Summary and Outlook Joachim Mnich Annual Meeting 2007 Palaiseau, October 10th Outline:  Summary and Outlook EUDET  Introdution to FP7 discussion.
Structural and Environmental monitoring with FOS E. Currás, D. Moya,I. Vila, A.L. Virto, Instituto de Física de Cantabria (IFCA-Santander) J. G. Carrión,
CSIC WP9.4 Activities Status report AIDA 2 nd Annual meeting WP9.4 Iván Vila Álvarez Instituto de Física de Cantabria.
L. Serin CNRS/IN2P3 AIDA Second Annual Meeting 1 Deliverables M1 - M128 M13-M246 M25-M367 M37-M4833 Y1 : All achieved, a few ones with 6 months delay Y2.
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement L. Serin CNRS/IN2P3.
1 EUDET Report on Management & Summary Transnational Access Felix Sefkow DESY Annual Meeting 2009 October 20, 2009 Outline:  Management Summary  Annual.
Hadron Calorimeter Felix Sefkow EUDET Extended Steering Meeting September 11, 2006.
First discussions regarding new EU AIDA project EUROnu WP5 Meeting 8 September 2009 Paul Soler.
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement L. Serin CNRS/IN2P3.
7. Feb 2012 Thomas Bergauer (HEPHY Vienna) WP9.4 Status AIDA WP9.4 meeting.
5 th Spanish Workshop on Future Accelerators IFIC, Valencia Oct I. Vila IFCA (CSIC-UC) Advanced European Infrastructures for Detectors at Accelerators.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
RD42 Status Report W. Trischuk for the RD42 Collaboration LHCC Meeting – June 12, 2013 Development of CVD Diamond Tracking Detectors for Experiments at.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
GC meeting R. Aleksan February TIARA 1.Meeting objectives 2.General Information 3.Final Budget 4.Consortium Agreement 5.Next meetings 6.Conclusion.
4-5 January 2006Jan Timmermans - Introduction1 EUDET JRA2 Brainstorming meeting 4-5 January 2006 Jan Timmermans NIKHEF.
14.4. Readout systems for innovative calorimeters
Commissioning of the Fiber-Optical-Sensor (FOS) environmental and structural monitor AIDA 3nd Annual meeting WP9.4 Iván Vila Álvarez Instituto de Física.
ARIES WP2 Task 2.2 kick-off Coordination, support and enhancement of communication/outreach activities for accelerators in Europe Jennifer Toes (CERN),
ILD Silicon Tracking Status Report
AMICI WP1 – Management, coordination and dissemination
SiD R&D Plan and Opportunities for New Collaborators
European Network for Novel Accelerators (EuroNNAc2): WP7
Final CALICE OsC meeting: Status and summary of project
FCAL R&D towards a prototype of very compact calorimeter
From EuCARD-2 to ARIES TIARA Meeting, Warsaw, 19 June 2017
EMI Project Processes and Tools
Report on Transnational Access in AIDA2020 WP 10, 11, 12
New EU FP7 I3 call Identifier: FP7-INFRASTRUCTURES
CERN R&D plans and Infrastructures
Steven Newhouse Project Director, EGI.eu
Accelerator Research and Innovation for European Science and Society
WP microelectronics and interconnections
Extended Steering Committee Meeting
Status of Ecal(s) for ILD
EUDET Detector R&D towards the International Linear Collider
European Detector R&D: AIDA
Working for a detector project: A message from AIDA
AIDA WP12.2 : Detector Characterization Facilities EMC characterization Fernando Arteche.
ECAL project in the future 2-3 years
Granular calorimeters Infrastructure
EU Institution Board 1 representative of each participating institute
CMS Goal of the experiment
AMICI WP1 – Management, coordination and dissemination
HL-LHC upgrade at IPHC news
AIDA++ * Next Steps * Working Title for the AIDA-2020 Follow-up
Presentation transcript:

6th Spanish Workshop on Future Accelerators Granada May 2011 Advanced European Infrastructures for Detectors at Accelerators I. Vila IFCA (CSIC-UC) 6th Spanish Workshop on Future Accelerators Granada May 2011

_Outline AIDA 101 News Partial summary of network related activities: Outlook I. Vila, 6th Workshop on Future Accelerators, Granada May. 16th 2011

AIDA 101: Motivations and Goals(1) The AIDA project promoted by the RECFA Coordination Group for Detector R&D in FP7 to comply with European Strategy for EPP. Responds to the FP7-INFRASTRUCTURES-2010-1 call from the European Commission. AIDA addresses “existing” key infrastructures required for the development of detectors for future particle physics experiments. AIDA targets User communities SLHC, ILC, accelerator-driven neutrino facilities or Super-B. I. Vila, 6th Workshop on Future Accelerators, Granada May. 16th 2011

AIDA 101: Motivation and Goals (2) AIDA appears as a continuation of the EUDET I3 FP6 project with a much wider scope beyond the ILC. Infrastructure call inside de Capacities program of the FP7. Combination of collaborative project (RTD) and coordination and support actions (CSA) for integrating activities: JRA, TA, NA. As IA project must: provide wider and more efficiente access to the “existing” Research infrastructures (RI) Better integration in the operation of the RI. I. Vila, 6th Workshop on Future Accelerators, Granada May. 16th 2011

AIDA 101: Work Packages I. Vila, 6th Workshop on Future Accelerators, Granada May. 16th 2011

AIDA 101: Final budget breakdown Activity EC funded budget WP1 : Management 350 k€ WP2 : Common software tools 906 k€ WP3 : µelectronics & interconnection 918k€ WP4 : Relation with industry 120k€ WP5 : DESY testbeam 100k€ WP6 : CERN testbeam 150k€ WP7 : European irradiation facilities 550k€ WP8: Improvement of irradiation & beam lines 2324k€ WP9 : Advanced infrastructure for detector R&D 2582k€ I. Vila, 6th Workshop on Future Accelerators, Granada May. 16th 2011

AIDA 101: Partners and Beneficiaries Associate partners  About 50 beneficiaries representing more than 70 Institutes I. Vila, 6th Workshop on Future Accelerators, Granada May. 16th 2011

Project coordination WP1 : S. Stavrev (CERN) + L. Serin (LAL/Orsay) WP2 : F. Gaede (DESY) + P. Mato (CERN) WP3 : H.G Moser (MPI) + V. Re (INFN-Pavia) WP4 : S. Stapnes (CERN & Oslo) WP5 : I. Gregor (DESY) WP6 : H. Breuker (CERN) WP7 : M. Mikuz (JSI Ljubjana) WP8 : M. Moll (CERN) WP9 : M. Vos (Valencia) + V. Boudry (LLR) Management team Scientific coordinator : L. Serin (LAL/ORSAY) Deputy coordinators : T. Benke (DESY) P. Soler (Glasgow) Administrative coordinator : S. Stavrev (CERN) Governing Board Chairman I.Vila (Santander) I. Vila, 6th Workshop on Future Accelerators, Granada May. 16th 2011

News None of the National Consortia were accepted (but CNRS joint institutes) so we have to split CSIC & UB full partners (CIEMAT, IFAE & USC associated partners to CERN). Very recently, Grant Agreement and Consortium agreement signed. First installment (pre-financement) from EC already at CERN. Expect it soon at your institute. Associated partners should get the total amount. The technical and scientific activity started officially with the kick-off meeting at CERN (February 16th) I. Vila, 6th Workshop on Future Accelerators, Granada May. 16th 2011

Our contribution WP3: µelectronics and interconnection (CNM, UB) WP8.5 General Infrastructure for TB and Irradiation facilities (IFIC) WP9.3 Precise Pixel Detectors (IFAE, IFCA, IFIC, USC) WP9.4 Silicon Tracking (CNM, IFCA, IFIC, UB) WP9.5 High Granularity Calorimetry (CIEMAT) HERE brief status report on network related WP9 task (my bias). I. Vila, 6th Workshop on Future Accelerators, Granada May. 16th 2011

WP9.4 Silicon Tracking: goals Providing multi-layer Si -strip coverage for the calorimeter stack of WP9.5, precise entry point as a reference for study of overlapping showers Task leader: Thomas Bergauer (HEPHY Vienna) Research team completed with Vienna and Prague, Spain is the main partner of this task. EC-FUNDED (K€) TOTAL (k€) IFIC 47 185 IFCA 184 UB 35 123 CNM 22 97 I. Vila, 6th Workshop on Future Accelerators, Granada May. 16th 2011

WP9.4 Deliverables and Milestones After 1st year: MS39: Design of Silicon micro-strip ladders (Milestone; Report) [month 13: March 2012] In 4th year: D9.5) Silicon micro-strip ladders: The Silicon micro-strip ladders are installed in front of the Calorimeter stack delivered by WP9.5. The pointing precision and timing performance are characterized. The devices remain available for the study of the calorimeter performance in case of overlapping showers. [month 39: May 2014] I. Vila, 6th Workshop on Future Accelerators, Granada May. 16th 2011

WP 9.4 Task implementation Baseline Deliverable Two orthogonal layers of u-strips HPK SiLC sensors ? AVP25 based hybrid Conventional mechanics Integration with CaloDAQ Offline software Provide precise entry point to calorimeter Deliverable 2nd QT 2014 Advanced Deliverable (ILD focused) Ultra-light strip layer of thin sensors (230 um) Integrated PA or 2D-Poly silicon or short strip sensors. APV25 based hybrid Light mechanics with embedded Fiber Optic Sensors Integration with caloDAQ Offline Software Demonstrator of ILD silicon tracker No deadline I. Vila, 6th Workshop on Future Accelerators, Granada May. 16th 2011

WP9.3 Thermo-mechanical infraestructure & AID for pixels Implementation to be done, no well defined task yet. Unclear scope and goals. Should combine Thermal and mechanical characterization box + alignment Investigation Device. I. Vila, 6th Workshop on Future Accelerators, Granada May. 16th 2011

R/O Chip for ILD Univ. Barcelona will continue SiLC effort to develop a readout chip suitable for ILD different approach than Paris chip (top-down) Do design and simulation in AIDA, then find budget for (multi channel) strip target technology IBM 90 nm 1 channel design for prototype in 1.5 year Just a starting point for ILC chip design but not usable for AIDA I. Vila, 6th Workshop on Future Accelerators, Granada May. 16th 2011

Outlook In brief, AIDA: 2250 PM (47 FTE) effort with a 27 M€ budget, (8M€ EC contribution) aiming to improve the R&D key infrastructures. Spanish contribution 178 PM (4 FTE), total budget 1.6 M€ ( 0.4M€ EC contribution). It is about infrastructure BUT in the implementation to achieve the deliverables relies the “actual” R&D interest. (strongly related with ILD, Belle-II) First installment to partners and associated expected to arrive very soon. The project has started, more proactive approach needed. I. Vila, 6th Workshop on Future Accelerators, Granada May. 16th 2011

AIDA++ towards a SiLC All AIDA members are part of SiLC, proposal to link AIDA meetings to AIDA meetings (pre-meeting) and one IDL Workshop meeting. I have, informally, contacted all the active international European parts (Vienna, Prague, Karlsruhe) with good reception. After this meeting, call for a SiLC meeting to discuss this porposal I. Vila, 6th Workshop on Future Accelerators, Granada May. 16th 2011

AIDA++ towards a SiLC (2) A.1 Coordination and Management Networking: Collaboration Web collaboration workshops Contact with other non-ILC R&D groups Contact for ILC collaborations Project and test beam priorization IPR and disclosure issues. A.2 Sensor R&D Innovative Tecnologies Sensor qualification Technological vigilance A.3 Module development Front-end electronics Powering EMC Module design off detector readout cooling A.4 Test beam characterization Logistic Data analysis A.5 System Integration and mechanics Detector system design for ILD trackers FEA simulations: Deformation, stability and thermal studies. Thermomechanical mock-up Structural and enviromental monitoring Survey, metrology, alignment. A.6 Software Development GEANT4 implementation of integration CAD design. Benchmarking studies. Support to Test beam data analysis s I. Vila, 6th Workshop on Future Accelerators, Granada May. 16th 2011

AIDA++ towards a SiLC (3) Collaboration Board (CB) One voting representative of each institution SiLC Coordinator Ex-officio non-voting member Technical Board (TB) SILC Coordinators Activity Coordinator A1. MANAGEMENT Activity Coordinator A2. SENSORS Activity Coordinator A3. MODULES Activity Coordinator A4. TEST BEAM Activity Coordinator A5. MECHANICS Activity Coordinator A6. SOFTWARE I. Vila, 6th Workshop on Future Accelerators, Granada May. 16th 2011

BACK-UP I. Vila, 6th Workshop on Future Accelerators, Granada May. 16th 2011

Highlights (for the impatient) In our last workshop (December 2009) the proposal was just submitted to the EC. AIDA proposal obtained (March 2010) a excellent rank 14.5/15 by the EU referees (we did it!) BUT requested budget reduced from 10 M€ to 8M€. Annex 1 DoW submitted, May 2010 negotiation starts. July 2010 Partner amends UH out, KIT in, GPF sent. Today, still waiting (Since September) for a reply from our EU officer with all the modifications we have to do before the signature of the GA. I. Vila, 6th Workshop on Future Accelerators, Granada May. 16th 2011

Highlights (2) AIDA will start February 1st Kick-off meeting February 16th to 18th Many pre-kick-off meetings are happening right now focused on several tasks and subtasks. Most of the consortia used in TIARA (FP7 project in negotiation in June) have been rejected. We are expecting to face the same problems  Some consortia will have to be split in individual partners I. Vila, 6th Workshop on Future Accelerators, Granada May. 16th 2011

Organization > 70 institutes Chairman to be elected at kick-off meeting To be set up at kick-off meeting 01/10/10 EUDET Meeting I. Vila, 6th Workshop on Future Accelerators, Granada May. 16th 2011

Negotatiation main changes WP1 : Additional free manpower from IN2P3/CNRS WP2 : Small reduction of scope of a few tasks on reconstruction WP3 : Mainly unchanged but with small increase of contribution from partners. WP4 : Strong reduction but still keep the WP (42 months only). Might be the starting point of a new proposal to EU. Reduce the technologies to prospect and reduce workshop to AIDA annual meeting. WP5 and WP6 unchanged WP7 : small uniform reduction WP8 : Main reduction from CERN priority and removal of some tasks WP9 : Reduction keeping the scope of the WP with larger contributions of partners I. Vila, 6th Workshop on Future Accelerators, Granada May. 16th 2011

WP3: µelectronics and interconnection Strong involvement of LHC community on 3D technology for pixel detectors but expect synergy/collaborative work with LC-pixel/CMOS activity : via-last option as complementary approach to the 3D/Fermilab approach (via-first) EC-FUNDED TOTAL CNM 50K€ 194.6K€ UB 10K€ 46.4K€ I. Vila, 6th Workshop on Future Accelerators, Granada May. 16th 2011

WP8.5 General Infrastructure for TB and Irradiation facilities EC-FUNDED (K€) TOTAL (k€) IFIC 30 122 I. Vila, 6th Workshop on Future Accelerators, Granada May. 16th 2011

WP9.3 Precise Pixel Detectors Task leader: I. Gregor (also DESY contact) Second task leader + CERN contact to be defined The main deliverable is an extremely precise beam telescope for characterization of prototypes (based primarily at CERN NA) Catering to sLHC needs: CO2 cooling plant, fast read-out Deliverable : Integrated telescope arm (T0+37), Complemented by infrastructure for high precision thermo-mechanical characterization (at DESY) (deliverable T0+33) EC-FUNDED (K€) TOTAL (k€) IFIC 30.5 143 IFCA 147 USC 120 IFAE 26 85 Use state of the art devices to satisfy both LC/LHC requirements TimePix telescope 1 ns precision MIMOSA telescope 1 um precision ATLAS B-layer upgrade - LHC timing I. Vila, 6th Workshop on Future Accelerators, Granada May. 16th 2011

WP9.5 High Granularity Calorimetry Task leader: Felix Sefkow (DESY) Provide versatile calorimetric infrastructures to test detecting media T0+40 Reusing and extending the development made in EUDET to build an integrated precision set-up with pixel hodoscope, pre-calo silicon strip layers and • an extended EM calorimeter and a hadronic radiator (Fe, W) structure • a luminosity calorimeter structure with tungsten radiator and read-out electronics in which many types of sensors can be tested and their response compared to simulation. Inter-pad gap in ECAL Sensor for the LumiCal A 3D profile of a 10 GeV pion in a Fe-Scint calorimeter The EUDET ECAL one μ-Megas m² EC-FUNDED (K€) TOTAL (k€) CIEMAT 26 90 I. Vila, 6th Workshop on Future Accelerators, Granada May. 16th 2011 28