ELLIPTICAL SCRF CAVITIES

Slides:



Advertisements
Similar presentations
Indian Plan for Contribution in Superconducting Cavity & Cryomodule Technology Prashant Khare Avinash Puntambekar RRCAT,India.
Advertisements

MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
Status of the 201 MHz Cavity and Coupling Coil Module Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference March 10, 2004.
Piezo Studies and Temperature Measurements Ruben Carcagno May 11, 2005.
Fabrication Progress for LHC Superconducting Crab Cavities July 10, 2015.
US Cavities Status and Plan Mark Champion 01 October 2009.
Industrial Studies of ILC Cavities & Component Production in the Americas IPAC 11 – Kyoto, Japan May 23, 2010 Science Projects Homeland Security Medical.
Cavity package T.Saeki BCD meeting 20 Dec Cavity shape BCD: TESLA shape Pros: small wakefield, HOM thoroughly investigated single-cell: 43 MV/m.
ILC PM Meeting S0 Webex Global Design Effort 1 S0/S1 Next Steps Lutz Lilje GDE.
Shekhar Mishra, Fermilab Mark J. Oreglia, Univ. of Chicago
Overview of the ILC and SRF Program (With an emphasis on Px) Shekhar Mishra ILC & SRF Program Fermilab.
Elliptical SRF Cavities Mike Foley. Fermilab Feb 13-14, 2007DOE SCRF Review2 Elliptical SRF Cavities PREVIEW OF PRESENTATION –Brief review of established.
Americas S0 Plan in USA Shekhar Mishra Fermilab/GDE US Main Linac Cavity and Cryomodule WBS.
F Status and Plans for SRF Facility Sergei Nagaitsev May 18, 2007.
ILC R&D at Fermilab Robert Kephart. ILC Americas f Fermilab May 15-18, 2006FY06 DOE Annual Review2 Outline Fermilab ILC Goals Fermilab’s role in the GDE.
Mechanical Issues SPL cavities/cryomodules Workshop CERN 30 Sep. 2009
Work toward Stainless Steel SRF Helium Vessels at Fermilab Tom Peterson (presenter), Information from Jeff Brandt, Serena Barbanotti, Harry Carter, Sergei.
M. Ross, N. Walker, A. Yamamoto ILC Cost Review, (updated for TB) and Cost Drivers  Future R & D ILC Cost Review (M. Ross,
Advanced Energy Systems, Inc. Prototype Cavity Fabrication & Test Presented by Ilan Ben-Zvi, BNL for Michael Cole, AES.
Achievement of 41 MV/m Gradient by AES8 Rong-Li Geng Jefferson Lab ALCPG09, October 1, 2009.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
R.L. Geng, 5/27-31,2013 ECFA LC2013, DESY 1 Update on Raising Q0 at Ultra-High Gradient via Large-Grain Niobium Material Rongli Geng Jefferson Lab ECFA.
R&D Expected in Cooperation with Vendors ILC Baseline Assessment Workshop Mark Champion September 09, 2010.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
ALCPG/GDE Meeting FNAL Global Design Effort 1 Cavity Work Packages Lutz Lilje GDE.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
ILC Americas Cavity and Cryomodule R&D Shekhar Mishra ILC Program Fermilab Talk presented at DOE Annual Program Review Breakout Sessions – Wednesday, May.
F Fermilab ANL/FNAL SCPF EP/HPR Processing Status and Plan Allan Rowe TD/SRFDD.
ILC Cavity Gradient R&D Plan Proposal for Release 5 Rongli Geng for ILC Cavity Group 2jun2010 ILC SCRF WebEx Meeting 6/2/20101ILC SCRF WebEx Meeting.
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
LASA Medium-β Cavity Progress Update Paolo Michelato 2 nd ESS Collaboration Meeting - SRF Elliptical Cavities 15 th December 2015.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
Update on S0 Work in the Americas Region Mark Champion 17 June 2008.
U.S. Plan for Cavity Production Bob Kephart ALCPG09/GDE Sep 30, 2009.
IHEP GHz 9-cell Cavity R&D Status and Plan The Third IHEP-KEK 1.3GHz SC Technology Collaboration Meeting Dec. 7-8, 2010, IHEP, Beijing GAO Jie,
ALCPG2011, 3/19- 23, SRF Group Institute of Heavy Ion Physics, Peking University ALCPG /3/19-23, Eugene, Oregon, USA RF superconducting Cavity.
Centrifugal Barrel Polishing at Fermilab (Tuesday, December 6th at 10:20) Tesla Technology Collaboration IHEP, Beijing December 5 th -8 th, 2011.
Niobium tube specification and procurement for seamless forming Andy Hocker & Lance Cooley SRF Development Department and Superconducting Materials Department.
SRF COLLABORATION MEETING MAY.2016 ESS MEDIUM BETA CAVITY MANUFACTURING CEA Saclay/ESS ECCTD WU Cavités | Enrico Cenni.
650 MHz Beta = 0.61 Cavity Design, Fabrication and Testing R. Rimmer for F. Marhauser Jefferson Lab, Newport News, Virginia 23606, USA Project-X Collaboration.
Andrew BurrillFall 2011 Project X Collaboration Meeting 650 MHz Developments at JLAB Andrew Burrill for the JLab Team.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Jefferson.
650MHz Cavity, Helium Vessel, and Tuner Status at Fermilab Chuck Grimm IIFC POC 650MHz Cavities Fermilab (Avinash Puntambekar RRCAT)
LCLS-II 3 rd Harmonic Dressed Cavity Design Review Chuck Grimm November 20, 2015.
July 5th,2006John Mammosser, Jlab ILC – Electropolish Development (EP) Plans/Progress/Problems/Performance Jefferson Lab J. Mammosser, L. Phillips, C.
Rongli Geng ILC Cavity Group Meeting October 25, 2011
Status and plans for the 3.9 GHz section of XFEL
ILC R&D Board Meeting: SRF Cavities Status and Plans
Energy (ILC) and Intensity (Project X) SRF Cavity Needs
Rongli Geng Jefferson Lab & GDE
for the FNAL/ANL, JLab, and Cornell cavity teams
Progress and Issues with VTS Upgrade
FCC R&D WP5 Cavity Fabrication Status May 2017 M
Evolving an ILC focused SCRF Facility from the XFEL Infrastructure
Activities of Cavity Fabrication Facility at KEK
Fabrication of Nb and Cu SPL cavities and required tools CERN status
Superconducting Cavities: Development/Production
SPS – RFD Experience and Evolution to LHC
Cost reduction activities in cavity fabrication at MHI
2. SCRF General Preparation for the AD&I Preparation for AAP Review
Highlights from EU Global Design Effort
Status of CEPC SC RF Study
Nick Walker (DESY) EU GDE Meeting Oxford
The S0S1 Taskforce: an Example of the Complexity for the ILC R&D Environment Lutz Lilje DESY Beijing ILC Workshop Global Design Effort.
Presentation transcript:

ELLIPTICAL SCRF CAVITIES Established Fabrication Method Disks are cut from high purity niobium sheet and scanned for pits, scratches or inclusions of foreign material. Disks failing scan are rejected. Half-cells deep drawn from disks: extra material left at iris and equator to allow for weld shrinkage and tuning. Half-cells EB welded at iris to form dumbbells: stiffening rings EB welded to prevent Lorentz Force detuning -- dumbbells measured for frequency and equators trimmed accordingly. End tubes, FPCs and HOMs formed by vendor preferred method (rolled and seam welded, back extruded, etc) -- flanges and other components machined. End assemblies EB welded, measured for frequency and end half-cells trimmed accordingly. Dumbbells EB welded at equators to form cell structure: end assemblies EB welded to cell structure to complete cavity. NOTE: Each EB welding operation above requires parts to be degreased and BCP acid etched as weld preparation. There are ~ 70 EB welds per cavity.

ELLIPTICAL SCRF CAVITIES Why EB welding? EB welds produce localized heat effected zone resulting in minimum distortion (a necessity with the tight tolerances on cell profile). EB welds are fusion welds -- no secondary medium required. Depth of penetration is easily controllable. Excellent repeatability. EB are welds done in vacuum, thus reducing the opportunity for contamination.

ELLIPTICAL SCRF CAVITIES Cavity fabrication cost: mass production mode (DESY) ~ $60K per cavity Material 45% Machining 42% Welding 6% Other 7% Maximum gains in cost reduction achievable by reducing machining and/or material costs

ELLIPTICAL SCRF CAVITIES Alternative cavity fabrication methods Motivation based on potential cost savings -- no known alternative methods claim to improve performance. 1. Methods to reduce material costs (niobium film coating on substrate) 2. Methods to reduce machining costs (hydroforming, spinning) 3. Methods to further automate fabrication steps (innovative welding fixture design, EB welding machine configuration) 1. Hydroforming or spinning cell structure From seamless niobium tube or from niobium clad copper tube

ELLIPTICAL SCRF CAVITIES Potential advantages: Eliminate machining of dumbbell equators. Eliminate welds in high field regions of the cavity. If formed from niobium clad copper tubes may significantly reduce material (niobium) costs. Potential disadvantages: Seamless niobium tube production possessing uniform formability properties and sufficient length for 9-cell cavity requires further R & D. Niobium clad copper tubes may delaminate from stresses due to thermal cycling. Single pass EB welds required to join 9-cell structure to end assemblies -- difficult.

ELLIPTICAL SCRF CAVITIES 2. Form end assemblies from brazed copper components followed by niobium film coating. Potential advantages: Reduce material (niobium) costs. Eliminate some EB welding costs. Potential disadvantages: Complex internal end assembly geometry makes uniform niobium film deposition problematic. Possibility for copper migration into critical weld joint.

ELLIPTICAL SCRF CAVITIES SCRF cavity fabrication at FNAL -- completed, in progress and planned: 1. 3.9 GHz 3rd harmonic cavities Cryomodule with four cavities promised to DESY. Three cavities completed (FNAL/JLAB) -- apparent problem with HOM design -- fourth cavity with modified HOM in final assembly stage at Jlab. Six additional cavities with revised HOM design are in progress. Large grain one-cell cavity planned (FNAL). Single grain one-cell cavity planned (JLAB). Three one-cells complete (FNAL) and three one cells in progress at Roark. Single-cell cavities useful for R & D studies on cavity processing methods (EP, tumbling, etc).

ELLIPTICAL SCRF CAVITIES

ELLIPTICAL SCRF CAVITIES 2. 3.9 GHz deflecting mode cavities Various one-cell and 3-cell cavities. One 9-cell and one 13-cell. New design in progress at low level of priority. 3. 1.3 GHz ILC cavities Four ACCEL (asymmetric end tubes) received. Four AES (asymmetric end tubes) in final assembly stage. Eight ACCEL (symmetric end tubes) on order. Six AES (symmetric end tubes) on order. Two JLAB large grain (symmetric end tubes) due February. Two JLAB (asymmetric end tubes) in progress. FY2007 plan: order 24 cavities COST ~ $1.7M

ELLIPTICAL SCRF CAVITIES Industrialization: US vendor development Must involve industry more and utilize their expertise AES -- experienced, but need to prove capability with ILC cavities -- awaiting tests of first four cavities. ROARK -- appear capable, but need significant hand holding. Currently fabricating three 3.9 GHz 3rd harmonic one-cell cavities (funded at ~ $45K) as Phase 1 of a potential three phase effort. Phase 2 would entail building one single-cell 1.3 GHz ILC cavity (need ~ $120K to fund this phase). Phase 3 would be NIOWAVE/ROARK collaboration -- complementary capabilities. Fabricate two nine-cell1.3 GHz ILC cavities (need ~ $400K to fund this phase).

ELLIPTICAL SCRF CAVITIES Need for EB welding machine at Fermilab: Why? Remove dependence on Sciaky. Sciaky machines in use for contract welding are always for sale. In FY2005 the machine we were using for 3rd harmonic cavity fabrication was sold causing an eight month delay in our schedule. Also, transportation of parts to Sciaky and their machine shop environment increase the potential for damage and/or contamination. It will facilitate the investigation of alternative fabrication methods so as to reduce cavity cost. It can be used to investigate alternative cavity cell shapes with the goal of improving accelerating gradient. Utilize as a training facility to transfer cavity fabrication methodology to potential US vendors. COST ~ $1.5 - 2.0M M&S plus $200K SWF Locate in CPF where ultrasonic cleaning tanks, pre-weld BCP facilities, clean rooms, and RF measurement equipment will be available.

ELLIPTICAL SCRF CAVITIES