Coordination meeting 12/05/15

Slides:



Advertisements
Similar presentations
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
Advertisements

CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP Status and Overview.
Creating a common understanding on Adverse events information requirements CCC-TI Isabelle Laugier Nov 2 nd 2012.
 Read out strips production : We will provide 200 strips (100 RE4/2 and 100 RE4/3) Contract with Beijing Gaonengkedi Co. signed on 10-Aug., 3 RE4/2 and.
NSDI Strategic Plan Update FGDC Coordination Group Meeting September 10, 2013.
PSB MPS Building 245 CV Status EN-CV-PJMichel OBRECHT – Frédéric TEIXEIRA
Bulding 245 schedule update LIU Booster Meeting Fulvio Boattini & Michel Obrecht TE-EPC / EN-CV TEEPC.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
NSDI Strategic Plan Update Federal Geographic Data Committee Meeting September 12, 2013.
Week Project approval and kickoff Aug 2 Production cost study Aug 19 Milestone and resource planning Sep 27 Beta test 1.2 rollout, documentation.
January 4, 2007 Project Overview RHIC II Project Internal Cost Review Roberto Than Cryogenics Systems January 4, 2007.
Market Systems Release Update Modifications Committee Meeting 55 June 19 th
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
NCIP Nanomaterial Data Curation Initiative Update & path forward Christine Ogilvie Hendren 5/29/2014.
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
The Building 180 Cryogenic infrastructure water cooling system Stefano Moccia, EN-CV Coordination meeting 26/09/14.
The Building 180 Cryogenic infrastructure water cooling system Status Update Stefano Moccia, EN-CV Coordination meeting 14/10/15.
NSDI Strategic Plan Update National Geospatial Advisory Committee Meeting December 11, 2013.
Mission H 2 O Presentation to State Water Commission July 9, 2009.
Anonymous | Secure | User friendly
The main function of a business is to produce goods and services which are desired by their customers.
NSDI Strategic Plan Update FGDC Coordination Group Meeting November 19, 2013.
Hummock Pond Road Bike Path Implementation Update January 25, 2012.
Support for Technical Infrastructure operations P. Sollander, AB/OP/TI.
O. Kester, NuSTAR annual meeting, 27/02/2013
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
CENF SB WG report CENF PTM meeting 25 th July 2013 M. Calviani for the CENF SB team.
A. Perin, TE/CRG, Page 2 CERN-GSI FAIR Project integration/coordination meeting 5 14 th October 2015 A. Perin, H. Derking, L. Stewart, M. Chesi,
Update on the PSB Cooling and Ventilation Systems
Cryoplant Controls Installation
Status, Schedule and EVM for the test facility project
Johann ZIRNGIBL CSTB / France
Common Projects Status
Francois and Lau EATM 17 July 2012
Capital Metro Downtown Station Improvements
Markus, Mathieu, Enrique, Rudiger, Serge
SPS cryogenic proximity equipment and SM18 validation
Hollow e- lens, Cryogenic aspects
Accelerator and Experiment Interface Session: LS2, LS3
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
EN-CV interventions during EYETS for PS and PSB
Status of the cryogenic system for B180
BUSINESS OWNER MEETING
Status of CO2 Cooling tests at CERN for Pixel phase 1
ctclink Steering Committee
Portfolio Management Process & Customer Request Management
Iowa College Aid Processing System (ICAPS)
CMX scope and functionalities
ILC Cryogenics -- Technical Design Report Planning
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Request by Councilmember Madison to reagendize the Desiderio Park Design for reconsideration September 17, 2018 Item 17.
RF Distribution for Warm Linac
Back-End Payor Sub-Group
General Plan Amendment & Zone Change Timeline
PARCA Timeline.
XRN Feb 19 Minor Release - Status Update
XRN Nov 19 Release - Status Update
LCLS-II Cryoplant Controls Workshop.
XRN Nov 19 Release - Status Update
Potential Minor Release Drop 4 Timeline & Scope
Injector/Linac Design Status C. E
XRN Nov 19 Release - Status Update
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
XRN 4954 – MiR Drop 5 - Status Update
XRN 4927 – MiR Drop 4 - Status Update
Aziz AMAMOU EACM – 21th May 2019
East Hall under construction
Athletic Field Improvements
Cryogenic upgrade of B163, B165 & B253 Status Meeting 19th December 2018
Presentation transcript:

Coordination meeting 12/05/15 The Building 180 Cryogenic infrastructure water cooling system Status Update Stefano Moccia, EN-CV Coordination meeting 12/05/15

System Layout Bat 180 Raw water production Demi water distribution

Status Summary The contract for the Raw water production/distribution and the demi water production has been awarded to Delta Ti (Italy). Final input from Cryo needed in order to finalize the Raw water distribution layout inside Building 279. It would be desirable to have it by end of July 2015. Integration effort to define the Demi water distribution inside Building 180 is ongoing. The Demi water distribution will be done within the framework of EN-CV small jobs contract or via an amendment of the main contract.

Planning Design final approval End of procurement (end July 2015) Raw water production Commissioning (end Sept. 2015) CE works (bike shed removal, slab, trench excavation) Demi water production Commissioning (end Oct. 2015) If Raw and Demi water distributions are defined, then overall Commissioning (end Nov. 2015) Overall heat load test to certify the cooling towers July- Aug. 2016