ILC Status in Japan LCWS2016, Morioka M.Yamauchi KEK December 5, 2016

Slides:



Advertisements
Similar presentations
LCC status Lyn Evans 1April 18, 2015PAC Orsay. ILC in Linear Collider Collaboration 2 ICFA Chair: J Mnich Program Adv. Committee PAC – Chair: N. Holtkamp.
Advertisements

Industry and the ILC B Barish 16-Aug May-05ILC Consultations - Washington DC2 Why e + e - Collisions? elementary particles well-defined –energy,
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
Question 27: Outline the key steps for industrialization of machine components and the likely remaining vulnerabilities in achieving them. Achieving industrialization.
Accelerator R&D on LC - Activities of ATF & STF - 1. Introduction 2. ATF 3. STF 4. Summary Seiya Yamaguchi, KEK The US/Japan Collaboration in High Energy.
MEXT Review Process in Japan 2014/7/16 Y. Sugimoto 1.
Summary of AWG4: Beam Dynamics A. Latina (CERN), N. Solyak (FNAL) LCWS13 – Nov 11-15, 2013 – The University of Tokyo, Japan.
What’s been Achieved and What’s to be Done K. Yokoya ILC Annual Meeting 2012/12/20 ILC Annual, Yokoya1.
The Future of High Energy Physics R. Aleksan CPPM/IN2P3 and DAPNIA/CEA EPS HEP2005 Lisbon, July 23,
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
ILC Accelerator Status Lyn Evans, CERN, Imperial College London 1A. Yamamoto, LCB ILC Acc. Status.
Atsuto Suzuki. 1. Toward ILC Construction : Japanese Activities 1. Toward ILC Construction : Japanese Activities.
M. Ross, N. Walker, A. Yamamoto ILC Cost Review, (updated for TB) and Cost Drivers  Future R & D ILC Cost Review (M. Ross,
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
ILC – Recent progress & Path to Technical Design Report Brian Foster (Hamburg/DESY/Oxford & GDE) Plenary ECFA CERN 25/11/11.
ILC in Japan A 10 minute introduction H.Weerts Argonne National Lab March 24, 2014 University of Chicago.
Summary of SRF WG, LCWS14 H. Hayano, A. Yamamoto.
D.Proch, DESY; GDE meeting Vancouver 06 Technical systems: Cavity Report Overview on costing activities for ILC –European costing method Overview industrial.
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
Brief Introduction of KEK Linear Collider Project Office Akira Yamamoto KEK Report provided for ILC-TB Meeting,
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
Meeting of the European Global Design Effort Report from INFN non EU-funded R&D Carlo Pagani University of Milano and INFN DESY, 10 May 2006.
A Satellite Meeting at IPAC-2010 SCRF Cavity Technology and Industrialization Date : May 23, 2010, a full-day meeting, prior to IPAC-2010 Place: Int. Conf.
Status and plans for role of Japan in HL-LHC Katsuo Tokushuku Institute of Particle Nuclear Studies (IPNS) High Energy Accelerator Research Organization.
ILC Cavity Gradient R&D Plan Proposal for Release 5 Rongli Geng for ILC Cavity Group 2jun2010 ILC SCRF WebEx Meeting 6/2/20101ILC SCRF WebEx Meeting.
International Linear Collider Technology: Status and Challenges Steve Holmes Fermilab Wine & Cheese Seminar September 24, 2004.
5 Nov. 07 CCAST, IHEP Global Design Effort 1 ILC accelerator related R&D in Japan K. Yokoya KEK CCAST ILC Accelerator Workshop, IHEP, Beijing, Nov
13 September 2006 Global Design Effort 1 ML (x.7) Goals and Scope of Work to end FY09 Nikolay Solyak Fermilab Peter Tenenbaum SLAC.
SCRF Cavity WebEx Meeting May 17, 2010 Reports from PM (10 min.) – Brief report from ILC-PAC – Industrialization workshop as IPAC satellite meeting, Kyoto,
22 th October 2010 IWLC Sources working group J. Clarke, T. Omori, L. Rinolfi, A. Variola Summary of Sources working group WG1 with contributions from.
General remarks: I am impressed with the quantity and quality of the work presented here and the functioning of the organization. I thank ILC and FNAL.
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
CLIC project 2012 The Conceptual Design Report for CLIC completed – presented in SPC, ECFA and numerous meetings and conferences, also providing basis.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
Nan Phinney SLAC ILC Worldwide Event, Fermilab, June 12, 2013 (Many slides courtesy of Marc Ross, Akira Yamamoto, Barry Barish) ILC Accelerator A 25-year.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
France Japan Particle Physics laboratory (FJPPL) first workshop at KEK, Tsukuba, Japan 10 th May 2007 A_R&D_3 R&D on High Power Couplers for the ILC Hassen.
FNAL SCRF Review R. Kephart. What is this Review? FNAL has argued that SCRF technology is an “enabling” accelerator technology (much like superconducting.
Recent Result for the STF-2 Cryomodule Operation
The Status of the ILC Project in Japan
The Status of the ILC Project in Japan
ATF status and plans for 2017
ILC Accelerator Activities in Japan
June 26, 2017 AWLC2017, SLAC M.Yamauchi KEK
Arun Saini, N. Solyak Fermi National Accelerator Laboratory
ILC10 Beijing Global Design Effort
Plans towards CC in the LHC a US – centric perspective
Introduction and Meeting Objectives
ILC + CLIC status Personal assessment
LCC L. Evans, Santander, 2nd June 2016
ILC project Status Yasuhiro Okada (KEK) ILC detector meeting
Crab Cavity R&D Plan Kirk 1 6/Dec/2016
Activities of Cavity Fabrication Facility at KEK
ILC Status in Japan ECFALC M.Yamauchi KEK June 02, 2016
ILC Decision Timeline in Japan (KEK/JAHEP) and Asian LC overview
Annual ILC detector meeting K. Kawagoe (Kyushu)
A. Yamamoto, S. Michizono, and B. List
Status Update for NRI Commissioned Survey
2. SCRF General Preparation for the AD&I Preparation for AAP Review
WG3: Main Linac SCRF(cavity,cryomodule)
Sun Yat-Sen University, Guangzhou, China
FALC report and KEK’s plan for the ILC
Nick Walker (DESY) EU GDE Meeting Oxford
Yasuhiro Okada, Executive Director, KEK
Barry Barish Paris ICHEP 24-July-10
CEPC Waveguide HOM 5-cell and 2-cell Cavity Study and EP Facility
Presentation transcript:

ILC Status in Japan LCWS2016, Morioka M.Yamauchi KEK December 5, 2016 KEK, High Energy Accelerator Research Organization ILC Status in Japan December 5, 2016 LCWS2016, Morioka M.Yamauchi KEK

ILC Advisory Panel in MEXT Under ILC TF chaired by State Minister of MEXT Research contract ILC Advisory Panel Survey of technological spin-offs, research trends and technical feasibility May 2014 ~ Particle and Nuclear Physics Working Group TDR Validation Working Group Human Resources Working Group June 2014 ~ June 2014 ~ Nov. 2015 ~

Interim Report from the ILC Panel “Summary of Discussions” released by the ILC Advisory Panel (August 2015) Recommendation 1: Share the cost internationally and Find a clear vision on the discovery potential of new particles. Recommendation 2: Closely monitor and analyze the development of the LHC experiments and Mitigate cost risk. Recommendation 3: Obtain general understanding by the public and science communities. It is extremely important to respond to these recommendations in an appropriate manner in 1.5 year time frame to get real progress from the Japanese Government. It is KEK’s priority to do these with the international partners.

KEK’s efforts to actualize ILC (1) WG1: Public relations Contributions to “LC NewsLine” “ILC physics brochure” in Japanese Collaboration with AAA; Science Kitty goods, and so on. WG2: Accounting ILC to scientists in the other discipline Panel discussion on “ILC and role of Japan” at Isotope and Radiation Research Meeting. ILC presentations and symposium at Academic Lectures of Japan Society of Applied Physics. Lectures at a meeting of Atomic Energy Society of Japan. …and presentations and seminars at O(20) universities. WG3: Spin-off effects of having ILC in Japan “Why having ILC in Japan is good” must be clearly described to journalists and everybody in Japan. “Spin-off effects of ILC 2016” has been publicized by this WG. Nobel prize, hub of human knowledge, human resource development, industries, innovations, etc.

KEK’s efforts to actualize ILC (2) WG4: Potential nuclear and hadron physics program at ILC Have communicated with the Japanese nuclear physics community, and WG5: International action plans A document describing roadmap between governmental green light and actual start of the construction. KEK’s action plan was publicized in January 2016, which has to be extended to the international action plan. A working group for the European action plan has started. WG6: Clarification of scientific impact of ILC One of the recommendations in the ILC advisory panel, “Find a clear vision on the discovery potential of new particles” was given, partly because the panel has not been convinced with the scientific raison d'etre of ILC. We need to provide far better and understandable justification to the panel. Close collaboration with the LCC physics working group “Presentable draft” will be discussed at this Morioka workshop.

KEK’s action plan for ILC http://www.kek.jp/en/NewsRoom/Release/KEK-ILC_ActionPlan_160106-EN.pdf

Our reactions to the recommendations Advisory panel recommendations once more: Recommendation 1: Share the cost internationally and Find a clear vision on the discovery potential of new particles. Recommendation 2: Closely monitor and analyze the development of the LHC experiments and Mitigate cost risk. Recommendation 3: Obtain general understanding by the public and science communities. WG1, 2, 3 and 4 Surely will do. WG6 NRI’s survey pointed out some potential problems of the TDR design. Need to work on them. International physics communities are urged to work with your funding agencies and governments.

US-Japan Discussion Group US and Japan have a long history (37 years!) of successful collaboration based on the governmental framework. This will be one of the keys to develop government level consensus on the ILC project. Government officers from MEXT visited their counterparts in DOE at the end of May 2016, and it was agreed to start the US-Japan discussion group co-chaired by DOE and MEXT. Agenda of the discussion includes “Possibilities of collaborative research for cost reduction”.

1. Cost reduction in Nb material preparation Optimize the ingot purity with a lower residual resistivity ratio (RRR). Simplify the manufacturing method such as forging, rolling, slicing and tube forming. 2016 2017 2018 2019 KEK Masashi Yamanaka Feasibility study using 3-cell cavities (ongoing) Manufacture 8x9-cell cavities Evaluation (Vertical&Horizontal tests) Preparing materials Medium or High RRR sheet for cells Low RRR tube for beam pipe Quality of Nb for the end part will be optimized at this stage. Low RRR sheet for stiffener

2. High-Q high-gradient SRC with nitrogen infusion (Anna Grassellino surface treatment) Confirm reproducibility of the nitrogen infusion method to improve Q and field gradient of SC RF cavity. High statistics test of the yield by fabricating 8 9-cell cavities. example of Cornell 2016 2017 2018 2019 KEK Hitoshi HAYANO FNAL process 1 cell processing Performance test Preparation for cryomodule Preparation of vacuum furnace 3-9cell performance 8 - 9cell cavities fabrication Performance test

Impact on the ILC cost Possible cost reduction ILC cost reduction 1. Nb material 2-3% 2. High-Q high-G 8-9% sum 10-12%

A-3. Power input coupler fabrication The principal researchers are E. Kako, Y. Yamamoto (KEK) and N. Solyak and S. Kazakov (Fermilab). Cost reduction: 1~1.5%(of the ILC total value cost in the TDR) Schedule 2016 2017 2018 2019 KEK E. Kako Y. Yamamoto Evauation of ceramic (on going) Design Manufacturing #2 Manufacturing Manufacturing For cyromodule High power test High power test Collaboration with FNAL Const down R&D 2016/09/13

A-4. Cavity chemical treatment Principal researcher: H.Hayano The change of the SC-cavity chemical treatment, from horizontal EP and sulfuric acid + HF (TDR) to vertical EP (VEP) + non-HF solution + bipolar EP. VEP with wing-cathode Bipolar EP using non-HF solution 1~1.5 % (of the ILC total cost in TDR). Const down R&D 2016/09/13

NRI’s report on readiness of ILC technology NRI visited 12 research institutions and 15 industrial enterprises worldwide to study the followings, and reported them to MEXT. Technical feasibility of the proposed ILC Analyses of the remaining agenda in the accelerator construction Analyses of the possible efforts aimed at cost reduction NRI pointed out that the following seven items need breakthrough by further R&D accompanied with prototyping. Marx power supply Positron source, helical undulator, positron target and electron-driven positron source for back-up Rapid beam feed-back system for damping ring Beam dump Crab cavity

ILC R&D at KEK

STF-2 Accelerator Cryomodule Test 8 Cavities were tuned on resonance by piezo, and vector-sum operation was done at 31MV/m. CM2a Waveguide system Cold box CM1 View from upstream Capture CM Cold box To be constructed 07/Dec/2016 RF Gun LCWS2016 @Morioka

Progress in FF Beam Size and Stability at ATF2 Goal 1: Establish the ILC final focus method with same optics and comparable beamline tolerances ATF2 Goal : 37 nm  ILC 6 nm Achieved 41 nm (2016) Goal 2: Develop a few nm position stabilization for the ILC collision FB latency 133 nsec achieved (target: < 300 nsec) positon jitter at IP: 410  67 nm (2015) (limited by the BPM resolution) Nano-meter stabilization at IP We continue efforts to achieve goal 1 and goal 2. History of ATF2 small beam

Message for the real progress of ILC to happen Next 1.5 years will be critical for ILC to get green light from the Japanese Government. We maximally consolidate our efforts to optimize chances to get real progress in this time scale. International physics communities are requested to talk with their funding agencies and/or governments to express their enthusiasm for ILC, and submit official proposals to the governments requesting for review processes, etc.