Final Rulemaking Nonattainment Source Review 25 Pa. Code, Chapter 121

Slides:



Advertisements
Similar presentations
New Source Review NSR Reforms Oklahoma Department of Environmental Quality Air Quality Council Presented by Matt Paque, Attorney, ODEQ - AQD April 20,
Advertisements

1 Proposed Rulemaking to Implement Provisions of the Federal Clean Air Interstate Rule Environmental Quality Board Meeting Harrisburg, PA February 20,
Richard (Rick) Goertz, P. E
Florida Department of Environmental Protection Nonattainment Area New Source Review Updates Rule Development Workshop Chapters and October.
Overview of the Tribal New Source Review (NSR) Rule U.S. Environmental Protection Agency Office of Air Quality Planning and Standards (OAQPS) Research.
1 Indiana NSR Reform Training Presented by the Office of Air Quality NSR Reform Team.
New Source Review Reform Vera S. Kornylak, Associate Regional Counsel EPA Region 4 Office of Regional Counsel and Gregg Worley, Chief, Air Permits Section,
How Ozone is Regulated under the Clean Air Act Darcy J. Anderson AZ Dept. of Environmental Quality.
Air Pollution Control Board October 1, 2008 Thomas W. Easterly, P.E., DEE, QEP Commissioner, Indiana Department of Environmental Management We Protect.
Thomas K. Fidler Deputy Secretary for Waste, Air and Radiation Management Department of Environmental Protection Commonwealth of Pennsylvania Proposed.
1 PSD - Case #1 Case #1: –A simple cycle natural gas power plant with PTE NOx of 300 tpy and GHGs of 150,000 tpy CO2e receives a PSD permit addressing.
Transitional PSD Applicability Scenarios July 20, 2010 Jay Hofmann President trinityconsultants.com Troutman Sanders/Trinity Consultants PSD and Title.
IOWA Department of Natural Resources Air Quality Program Development Jim McGraw Environmental Program Supervisor  8 hr Ozone and PM2.5 NAAQS Implementation.
NEW SOURCE REVIEW REFORM/SIMPLIFICATION JOHN A. PAUL STAPPA/ALAPCO MAY, 2002.
Indiana New Source Review Reform Plantwide Applicability Limitations (PALs) IDEM/Office of Air Quality September 7, 2004.
© Jeffer, Mangels, Butler & Marmaro LLP 1 Programmatic New Source Review November 2, 2005 Malcolm C. Weiss Jeffer, Mangels, Butler & Marmaro LLP 1900 Avenue.
Proposed Rulemaking 25 Pa. Code Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review John Slade, Chief Division of Permits Bureau.
PA Department of Environmental Protection Continuous Source Monitoring Manual (Manual, Revision 8)
Welcome Revisions of Chapter WAC Sections -035 and -036 Rule advisory committee workshop #5 Lacey, WA October 28, 2009.
Sound solutions delivered uncommonly well Understanding the Permitting Impacts of the Proposed Ozone NAAQS Pine Mountain, GA ♦ August 20, 2015 Courtney.
Best Available Retrofit Technology Rule - Colorado David R. Ouimette Colorado Air Pollution Control Division.
1 SJVAPCD DRAFT SCHEDULES May 2, Hr OZONE ATTAINMENT DEMONSTRATION PLAN PM10 ATTAINMENT DEMONSTRATION PLAN.
Greenhouse Gas (GHG) Permit Training Other Aspects of PSD Title V Permitting.
Environmental Quality Board Harrisburg, PA October 16, 2007 Thomas K. Fidler, Deputy Secretary Office of Waste, Air and Radiation Management Feasibility.
Jessica Montanez Environmental Protection Agency NEW SOURCE REVIEW (NSR) PROGRAM.
1 Non-Attainment NSR Program Donald Law EPA Region 8.
PSD/Nonattainment Review You can do this! Marc Sturdivant Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2015.
1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section.
1 Consideration of Final Rulemaking Clean Air Interstate Rule Environmental Quality Board Meeting Harrisburg, PA December 18, 2007 Joyce E. Epps Director,
Florida Department of Environmental Protection Air Quality Standards and Nonattainment Updates Rule Development Workshop Chapter , F.A.C. October.
NSR and Title V Activities WESTAR Business Meeting May 2005.
2005 NSR Regulation Changes Dwight Wylie. Old Units vs. New Units  There is a broad disparity between air pollution control requirements and emissions.
Air Quality Technical Advisory Committee Meeting September 27, 2006 Virendra Trivedi Chief, New Source Review/Title V Section Division of Permits Bureau.
1 Final Regulation Order for Truck and Bus Regulation California Environmental Protection Agency Air Resources Board November 20, 2014.
Nonattainment New Source Review (NA NSR) Program Raj Rao US Environmental Protection Agency Office of Air Quality Planning and Standards ,
Final Omitted Rulemakings Repeals: Employer Trip Reduction; Portable Fuel Container Requirements; and St. Joe Resources Company Emission Limits Environmental.
1 Update on New Source Review (NSR) Activities and Priorities for Information Transfer and Program Integration Division April 7, 2004.
Proposed Rulemaking: Additional RACT Requirements for Major Sources of NO x and VOCs (25 Pa. Code Chapters 121 and 129) Environmental Quality Board November.
Proposed Regulation to Restrict Idling of Diesel-Powered Vehicles Environmental Quality Board Harrisburg, Pennsylvania October 16, 2007 Thomas K. Fidler,
Amendments to 25 Pa. Code Chapters 121 and 123: Final-form Rulemaking: Commercial Fuel Oil Sulfur Limits for Combustion Units Environmental Quality Board.
1 New Sources in Nonattainment Areas: Citizens Against Refinery’s Effects Action to review EPA approval of Virginia SIP SIP included: Permit for refinery.
Final Rulemaking: 25 Pa. Code Chapters 121 and 139 Measurement and Reporting of Condensable Particulate Matter Emissions Environmental Quality Board Meeting.
Petition to Adopt Regulations to Restrict Idling of Diesel-Powered Vehicles Environmental Quality Board Harrisburg, Pennsylvania January 17, 2006.
Environmental Quality Board May 16, 2007
Department of Environmental Quality
Environmental Quality Board
Ozone Redesignation Substitutes for the HGB and DFW Areas
Air Quality Technical Advisory Committee August 4, 2016 Harrisburg, PA
National Ambient Air Quality Standards (NAAQS)
New Source Review (NSR) Program Basics
Clean Air Act Glossary.
Consideration of Final Rulemaking
July 13, 2016 Department of Environmental Quality Proposed Amendments to UST Rules 15A NCAC 02N and 02O Ruth Strauss.
Triennial Review of Water Quality Standards Proposed Rulemaking
September 8, 2016 Department of Environmental Quality Proposed Amendments to UST Rules 15A NCAC 02N and 02O Ruth Strauss.
Clean Air Act (CAA) Purpose
Bill Harnett USEPA NACAA Membership Meeting October 21, 2008
Overview of New Source Review (NSR)
Julie Woosley, Division of Waste Management
Department of Environmental Quality
Department of Environmental Quality
Department of Environmental Quality
Julie Woosley, Division of Waste Management
New Source Review Update
Exceptional and Natural Events Rulemaking
Status of RMRR or learning the definition of “routine”…
Julie Woosley, Division of Waste Management
Navajo Nation Minor Source Regulations
Uinta Basin General Conformity
Appeal Code Changes Delynn Coldiron, City Clerk; Brad Yatabe, Legal
Presentation transcript:

Final Rulemaking Nonattainment Source Review 25 Pa. Code, Chapter 121 Final Rulemaking Nonattainment Source Review 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review Environmental Quality Board Meeting Harrisburg, Pennsylvania February 20, 2007

Nonattainment NSR Final Rulemaking The final-form Nonattainment NSR rulemaking adds new definitions and amends certain definitions in Title 25, Chapters 121 and the existing NSR requirements in Chapter 127, Subchapter E of the Pennsylvania Code In addition, Section 127.13 pertaining to the extension of plan approvals was amended during the development of the final rulemaking to extend the 18-month period for commencing construction of new or modified sources following the issuance of a plan approval

Section 127.13--Plan Approval Extensions The Section 127.13 amendment authorized the Department to extend the 18-month period to commence the construction, modification, or installation of an air contamination source upon a satisfactory showing that an extension is justified Prior to extending the 18-month timeframe for commencing construction, control technologies for the project must be re-evaluated by the Department This amendment provides flexibility and ensures consistency between Pennsylvania’s pre-construction permitting program and the federal prevention of significant deterioration. requirements in 40 CFR Part 52

What is New Source Review (NSR)? Is a federally-mandated preconstruction permitting program Requires state-of-the-art air pollution controls on new major facilities or major modifications to existing major facilities Applies in an attainment or unclassifiable area if the emissions impact a nonattainment area in excess of significance levels

Why the Revisions to the NSR Regulation? On December 31, 2002, EPA published the NSR reform rules in the Federal Register (67 Fed. Reg. 80186) The NSR Reform addressed five major areas: Baseline actual emissions Actual-to projected-actual applicability test Actual plantwide applicability limits (PALs) Clean Unit Exemption Pollution Control Project Exclusion In June 2005, the U.S. Court of Appeals vacated requirements including the Clean Unit and Pollution Control Project exclusions

Why the Revisions to the NSR Regulation? EPA requires states to adopt the December 2002 elements of the Federal NSR regulations or submit an “equivalency demonstration” Revisions to the SIP were due to EPA by January 2, 2006 Failure to submit the mandatory SIP revision will trigger an 18-month sanctions clock upon issuance of a “failure to submit” finding by EPA

NNSR Public Participation Process The EQB approved the proposed amendments for publication on December 20, 2005 The proposed rulemaking was published in the Pennsylvania Bulletin on April 29, 2006 Three public hearings were held: Harrisburg, June 6, 2006 Pittsburgh, June 13, 2006 Norristown, June 19, 2006 The public comment period closed on July 31, 2006 Comments were submitted by 33 commentators

Advisory Committee Consultations The Department made NSR presentations during the AQTAC and Citizens Advisory Council meetings on September 27 and October 17, 2006 The Department discussed the final-form regulation with AQTAC on December 14, 2006, and January 4 On January 4, AQTAC recommended several changes to the NSR amendments and concurred with the submittal of the final-form regulation to the EQB for consideration

AQTAC Recommendations AQTAC recommended that the ERC Registry application filing deadline be extended from one year after the emissions reduction is generated to: Three years after the source ceased emitting; or Five-years if a maintenance plan for the reactivation of a source has been submitted to the Department The Department has revised the final rulemaking to extend the deadline to two years if the owner or operator of the source or facility either submits to the Department within one year: A maintenance plan in accordance with § 127.11a, or A written request to preserve the emissions in the inventory

AQTAC Recommendations AQTAC recommended that the Department revise the requirements related to de minimis aggregation of emission increases and decreases. In response to AQTAC’s recommendation, the Department reduced the duration of the de minimis emissions aggregation period from 15 years to 10 years.

Section 127.202--Effective date Revised to specify that the requirements in the final rulemaking apply to a new or modified facility if a plan approval will be issued after the date the final rulemaking is published in the Pennsylvania Bulletin The proposed PM2.5 requirements were removed from the final-form regulation pending EPA’s promulgation of the Federal PM-2.5 NSR rule

Section 127.203a – Applicability Determinations Clarifications were made to provisions related to net emission increases, baseline actual emissions, and projected actual emissions The final-form regulation revised the look-back period to allow the use of a different consecutive 24-month period within the last five years, or 10 years upon a written determination that the 10-year period is more representative of normal source operations.

Section 127.206 – ERC general requirements A one-year amnesty period for the submission of ERC Registry applications for emission reductions occurring after January 1, 2002, is provided in the final-form regulation The ERC Registry applications must be submitted to the Department within one year after the effective date of the final-form NSR amendments Applies to emission reductions for any criteria pollutant

Section 127.207 -- Creditable emissions decrease or ERC generation or creation Revised the final rulemaking to add the phrase “creditable emissions decrease” to the section heading and certain subsections The final-form regulation state the following: “Section 127.207. Creditable Emissions Decrease or ERC Generation and Creation”

Section 127.207 -- Creditable emissions decrease or ERC generation or creation Section 127.207 (2) has also been revised to clarify that the time period for filing an ERC Registry Application has been extended from one year to two years. This revised regulatory language has been given to you this morning.

Section 127.214a. -- Special Provisions for Clean Coal Technology At EPA’s request, Section 127.214a (relating to special provisions for advanced clean coal generation technology) pertaining to presumptive LAER requirements has been deleted from the final rulemaking EPA indicated that the provision is not approvable as an element of the SIP; LAER must be determined on a case-by-case basis

Section 127.218 -- PALs Section 127.218 was revised to address concerns raised by EPA Owners or operators of new sources or emission units added under an existing PAL must reduce or control emissions from new sources by using the best available technology (BAT) for new sources, as authorized under section 6.6(c) of the APCA BAT will not be required for sources modified after the PAL is established unless the cost of the modification “… exceeds 50% of the fixed capital costs that would be required to construct a comparable entirely new source.…”

Rationale for the Proposed NSR Revisions The amendments to Subchapter E: Revise the existing NSR regulation to incorporate required elements of EPA’s December 2002 NSR rule Are reasonably necessary to achieve and maintain the national ambient air quality standards including the eight-hour ozone and fine particulate standards Are necessary to avoid the imposition of mandatory sanctions under Section 179 of the CAA

Recommendation The Department recommends that the nonattainment NSR final rulemaking, as revised, be approved for submission to EPA as an equivalency demonstration and SIP revision.