Lead bricks painting General procedure and its practical application

Slides:



Advertisements
Similar presentations
HSE instruction REC B.V. Harlingen Safety starts with the man in the mirror Welcome Information: All employees VCA or SCC Emergency exit Telephones off.
Advertisements

Hazardous Chemical Spill Response and Containment Program
Control Of Substances Hazardous to Health:
OH Title.
1 Laws, Regulations, Standards Chapter 3 Lead Abatement for Workers Course.
HOT WORK PROCEDURES Welding and Hot Work, such as brazing or grinding present a significant opportunity for fire and injury. CCR Title 8 Sub Chapter 7,
General Industry Standards Personal Protective Equipment.
Safety & Safety Documentation 2 3 Safety in three Questions Why ? Providing a safe workplace is a legal and moral obligation on every undertaking, and.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Personal Protective Equipment
Eliminating and Controlling Dust & Noise Hazards July 2002.
F.Y.I. The most common way for crime-scene personnel to become exposed to infectious blood borne pathogens, is through injuries involving sharps (needles,
WEEKLY SAFETY MEETING April 22nd, IRI 750 OGEC rig NGIRI2.
BLOODBORNE PATHOGEN CONTROL PROGRAM. References MCO F, Chapter 21.
Why Do We Need Safety Rules?  Safety is our first concern when doing science experiments in this class. Our experiments may require the use of certain.
Access zones and Training Steve Hutchins BE-ASR IEFC workshop 7/3/2012.
The organization and on-site follow up of the electrical installation work for the LHC The organization and on-site follow up of the electrical installation.
What prompts a new system? The current system may no longer be suitable for its purpose Technological developments may have made the current system redundant.
LS2 Safety Thomas Otto, LS2 Safety Coordinator.
PSR at Training Reactor VR-1 Marek Sedlbauer Czech Technical University in Prague IAEA Workshop on Application of the Code.
Roles and Responsibilities Explain the roles and responsibilities for health and safety of key personnel in selected workplace.
Respiratory Protection Is a respirator needed? How can you get one? 1.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
Essential Standard 2.00 Understand the nature of business. 1.
Last but not least : LS2 General Safety 1 Thomas Otto, LS2 Safety Coordinator for LHC Ana-Paula Bernardes, LS2 Safety Coordinator for Injectors.
1.Definition 2.Examples 3.Hazards 4.Signage 5.Rule and permit 6.The role of the TSO HSE Unit - Olivier Prouteau CONFINED SPACES Updated in January.
Asbestos Asbestos Awareness. Asbestos is a naturally occurring mineral that once was lauded for its versatility, recognized for its heat resistance, tensile.
Exhaust Ventilation Level 4: Special considerations with very hazardous substances Part 2 of 2.
INFORMATION ABOUT ASBESTOS EDMS No General, 2.Materials, 3.Risks, 4.Effects on health, 5.Prevention at CERN, 6.Work management, 7.Your role as.
GIF in EHN1 - Vision 112/02/2014A. Fabich, EN-MEF-LE.
How to Remove Exterior Lead Paint Lead paints are very dangerous because it causes harmful health effects for children who consume them. Also It will distinguish.
Abrasive Blasting.
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
Cessco Fabrication & Engineering Ltd.
PPE Maintenance & Care.
East Area Renovation Project Team meeting # 2 – EDMS News
Safety in the Neutrino Platform Hall
NP Hall Visits Guides’ training
Health and safety P.P.E What is P.P.E? Copy and identify these signs
CONTRACTORS’ ACTIVITIES
ODH Risk Assessment underground gallery B887-EHN1
Safety Documentation EHN1
Safety in Construction and Upgrade Phases
CE Status: Activities executed until 03/08 and ongoing
Monitoring, Review and Audit of OHS&E
Competence Pack Guide to Assessment.
Q Design & Technology Product Design U Health & safety I Z.
CV maintenance works during YETS
EHN1 Neutrino Installation Plans
EP Experiments safety validation process Safety Permits
EP TSO Meeting Electrical Work in EP Buildings Gilles MAIRE EP/DI-SO
People Responsible For Health and Safety
EYE SAFETY BY THE NUMBERS
Juanita Miller, PE, CFEI NMSU COE Safety ECI Room coesafety.nmsu.edu
Drug/Toxin (Animal Room)
2 Animal Biosafety Level MINIMUM PPE to Enter this Area
INFORMATION ABOUT ASBESTOS
دانشگاه شهیدرجایی تهران
PERSONAL PROTECTIVE EQUIPMENT
تعهدات مشتری در کنوانسیون بیع بین المللی
Part 2 – Control and Protection
Managing health and safety risks
Chemical Health Hazard (Animal Room)
Ballast Dust - a reminder!
Competence Pack Guide to Assessment.
Health & Safety An Introduction Resources – Risk Assessment Templates.
Always keep your hands and fingers away from the Line of Fire
Implementation of RP training ranks in SPS and NA_target
TYPE IN CENTRE NAME LEVEL 2 GDPR AWARENESS TYPE IN NAME
EA Renovation Project – Project Team 29 – 28 June 2019 NEWS
Presentation transcript:

Lead bricks painting General procedure and its practical application 04 October 2017 Letizia Di Giulio - EP Safety Office

Letizia Di Giulio - EP Safety Office The problem At CERN almost all lead bricks need to be painted (dangerous oxidation dust) External companies very expensive No internal service organised by CERN SMB contractor: 46 euros/brick Need for an immediate and not too expensive solution! 04 October 2017 Letizia Di Giulio - EP Safety Office

Letizia Di Giulio - EP Safety Office The proposed solution Procedure to allow experiments to safely paint the lead bricks (EDMS 1697818) Implementation safety measures Proposed conform location Proposed and tested specific paint (SDS checked) Everything validated by HSE! 04 October 2017 Letizia Di Giulio - EP Safety Office

The EP procedure Each experiment: time and cost of the paint! Activity is scheduled and approved using IMPACT 04 October 2017 Letizia Di Giulio - EP Safety Office

Letizia Di Giulio - EP Safety Office The proposed location Paint booth in 167/R-015 (coactivity to manage) Added curtains around and RP floor covering 04 October 2017 Letizia Di Giulio - EP Safety Office

PPE & monitoring Safety mask with filter (fit test done) Protective gloves Tyvek coveralls Safety shoes and shoe covering More PPE depending on SDS! Air monitoring for lead dust (3 monitors, no issues) 04 October 2017 Letizia Di Giulio - EP Safety Office

Letizia Di Giulio - EP Safety Office Conclusions GIF++ experiment painted 200 lead bricks in two weeks CMS painted over 500 bricks in three weeks Good result and no issues Paint your bricks! 04 October 2017 Letizia Di Giulio - EP Safety Office

Thanks for your attention! 04 October 2017 Letizia Di Giulio - EP Safety Office