forward scheduling or backward scheduling

Slides:



Advertisements
Similar presentations
Precedence Diagramming
Advertisements

CP Chapter 4 Schedule Planning.
Project Management and scheduling Objectives of project scheduling Network analysis Scheduling techniques.
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
PROJECT MANAGEMENT CPM/PERT V P B Chakravarthi. K Abhijeet Kumar.
Scheduling the Project
Advanced Project Management - CPH
Gantt Chart Graph or bar chart with a bar for each project activity that shows passage of time Provides visual display of project schedule Slack amount.
Defining activities – Activity list containing activity name, identifier, attributes, and brief description Sequencing activities – determining the dependencies.
MGMT 483 Week 8 Scheduling.
BSBPMG503A Manage Project Time 6.5 Develop Schedule The process of analysing activity sequences, durations, resource requirements and schedule constraints.
Copyright 2012 John Wiley & Sons, Inc. Chapter 8 Scheduling.
Importance of Project Schedules
Project Management Techniques.
Chapter 16 – Project Management
Project Management. Introduction What – Project Management Where – Where the success or failure of a project will have major consequences for the company.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Chapter 6 Introduction to Microsoft Project
HIT241 - TIME MANAGEMENT Introduction
Time Management Week 7 - Learning Objectives You should be able to: n List and describe the processes, activities, inputs, and outputs in time management.
Operations Management Project Management
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Appendix A Project Management: Process, Techniques, and Tools.
~ pertemuan 6 ~ Oleh: Ir. Abdul Hayat, MTI 03-Apr-2009 [Abdul Hayat, Project Time Management, Semester Genap 2008/2009] 1 PROJECT TIME MANAGEMENT.
1 Project Management Chapter Lecture outline Project planning Project scheduling Project control CPM/PERT Project crashing and time-cost trade-off.
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
Reid & Sanders, Operations Management © Wiley 2002 Project Management 17 C H A P T E R.
Network Planning Techniques Program Evaluation & Review Technique (PERT): Developed to manage the Polaris missile project Many tasks pushed the boundaries.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
1 OMGT 3123 Project Management  Project Controlling  Project Management Techniques: PERT And CPM  The Framework Of PERT And CPM  Network Diagrams And.
PROJECT MANAGEMENT Approaches
Project Planning and Budgeting Recall the four stages Project Definition and Conceptualization Project Planning and Budgeting Project Execution and Control.
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
BSBPMG503A Manage Project Time Manage Project Time Project Time Processes Part 2 Diploma of Project Management Qualification Code BSB51507 Unit Code.
Tools to Help  Product flow Dependencies and relationships of deliverables  Work breakdown structure The parts  PERT charts Program Evaluation and.
Infinite loading A scheduling approach that ignores capacity constraints. Click here for Hint finite loading or infinite loading or priority rule?
Chapter 16 – Project Management
Project Management.
Project Management – PTM721S
Project Management Project Controlling
PROJECT MANAGEMENT.
Project Management: PERT/CPM
Chapter 17 Project Management McGraw-Hill/Irwin
Project Planning & Scheduling
Project Scheduling
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
deterministic Fixed and known in advance, representing a
Project Planning & Scheduling
Project Management and scheduling
assemble-to-order (ATO) A system that produces standard modules to be
Chapter 6: Project Time Management
Chapter 6: Project Time Management
CHAPTER 6 PROJECT TIME MANAGEMENT
Project Time Management
Project Planning and Budgeting
PERT - The Program Evaluation and Review Technique
Project Management: A Managerial Approach
Chapter 16 – Project Management
Project Management CPM/PERT Professor Ahmadi.
PROJECT MANAGEMENT CPM/PERT V P B Chakravarthi. K Abhijeet Kumar.
AOA A style of project network diagram in which arrows
Project Time Management
Importance of Project Schedules
Project Management Project management is the discipline of organizing and managing resources in such a way that these resources deliver all the work required.
CHAPTER 6 PROJECT TIME MANAGEMENT
Presentation transcript:

forward scheduling or backward scheduling or critical path? forward scheduling Starting an activity as soon as possible, regardless of its deadline. Page 204 2nd Ed, Page 234 Click here for Hint

deterministic Fixed and known in advance, representing a critical path or deterministic or expected value? deterministic Fixed and known in advance, representing a high level of certainty when planning. Page 192 2nd Ed, Page 217 Click here for Hint

Gantt chart or CPM or histogram? A bar chart illustrating the relative frequency of occurrences in different categories. 2nd Ed, Page 218 Click here for Hint

project A unique collection of activities creating a project or path or PERT? project A unique collection of activities creating a particular outcome. Page 190 2nd Ed, Page 216 Click here for Hint

CPM Critical Path Method, a project management PERT or CPM or WBS? CPM Critical Path Method, a project management methodology developed by DuPont Corporation. Page 191 2nd Ed, Page 220 Click here for Hint

AON A style of project network diagram in which nodes AOA or AON or Gantt chart? AON A style of project network diagram in which nodes represent tasks and the connecting pathways represent precedence relationships. Page 192 2nd Ed, Page 221 Click here for Hint

path or precedence relationship or crashing? Expediting the completion of a task or group of tasks, to finish a project sooner. Page 206 2nd Ed, Page 235 Click here for Hint

deliverable or path or expected value? A desired product or outcome provided by the completion of a project. 2nd Ed, Page 220 Click here for Hint

precedence relationship? immediate predecessor or milestone or precedence relationship? immediate predecessor A task that must be completed before another task can start. Page 190 2nd Ed, Page 220 Click here for Hint

backward scheduling or CPM or forward scheduling? backward scheduling Scheduling backward from a project’s deadline to its start time. Page 205 2nd Ed, Page 234 Click here for Hint

expected value The mathematical expectation of a random expected value or probabilistic or Central Limit Theorem? expected value The mathematical expectation of a random variable, calculated as the weighted average of all possible values that may occur. Page 210 2nd Ed, Page 239 Click here for Hint

AOA A style of project network diagram in which arrows AOA or AON or Gantt chart? AOA A style of project network diagram in which arrows represent tasks and their connections with nodes represent precedence relationships. Page 192 2nd Ed, Page 222 Click here for Hint

Central Limit Theorem The observation that sample values approximate standard normal distribution or PERT or Central Limit Theorem? Central Limit Theorem The observation that sample values approximate a normal distribution, regardless of the underlying distribution of the population being sampled. Page 212 2nd Ed, Page 242 Click here for Hint

project program or CPM or adaptive project life cycle? project program A portfolio of projects supporting a common strategic objective. 2nd Ed, Page 248 Click here for Hint

harden To shield against unfavorable external influences. milestone or harden or slack? harden To shield against unfavorable external influences. 2nd Ed, Page 217 Click here for Hint

probabilistic Variable or not well standard normal distribution or incident or probabilistic? probabilistic Variable or not well known in advance; subject to randomness. This represents uncertainty in planning. Page 209 2nd Ed, Page 217 Click here for Hint

AON or AOA or WBS? WBS Work Breakdown Structure, a document specifying the tasks required to finish a project. Page 190 2nd Ed, Page 220 Click here for Hint

milestone or scope creep or project scope? scope creep The addition of new requirements to a project after work on the original requirements is underway, also known as mission creep. 2nd Ed, Page 248 Click here for Hint

precedence relationship PERT or precedence relationship or path? precedence relationship A dependency between two tasks, usually requiring that one task be completed before the other task is started. Page 193 2nd Ed, Page 220 Click here for Hint

crashing or incident or AON? A project with no previously planned timing and a high degree of dependence on its immediate environment for successful resolution. Page 191 2nd Ed, Page 219 Click here for Hint

critical path The longest path through a project network; critical path or milestone or expected value? critical path The longest path through a project network; determines the length of the entire project. Page 201 2nd Ed, Page 231 Click here for Hint

milestone A point of significance in the time line of a project. milestone or slack or incident? milestone A point of significance in the time line of a project. Page 190 2nd Ed, Page 219 Click here for Hint

slack or incident or crashing? The degree to which a task may be delayed from its early start without delaying the project. Page 202 2nd Ed, Page 231 Click here for Hint

PERT Program Evaluation and CPM or PERT or WBS? PERT Program Evaluation and Review Technique, a project management methodology developed by the US Navy. Page 191 2nd Ed, Page 220 Click here for Hint

predictive project life cycle or CPM or agile project management? predictive project life cycle A project life cycle marked by an early finish to planning, followed by an execution phase that adheres closely to those plans. 2nd Ed, Page 246 Click here for Hint

agile project management agile project management or WBS adaptive project life cycle agile project management Practices associated with the successful completion of projects under uncertain conditions. 2nd Ed, Page 217 Click here for Hint

harden or AOA or project scope? The boundaries of a project, determining its deliverables and the extent of its activity. 2nd Ed, Page 220 Click here for Hint

iterative planning Adjusting plans at short intervals, to reflect backward scheduling or PERT or iterative planning? iterative planning Adjusting plans at short intervals, to reflect emerging information. Page 191 2nd Ed, Page 219 Click here for Hint

path or precedence relationship or Gantt chart? Gantt chart A scheduling diagram that illustrates activities across a horizontal time line. Page 204 2nd Ed, Page 233 Click here for Hint

AON or project life cycle or project scope? A conceptual model of a project’s progress through distinct categories of activity, namely defining, planning, executing, and closing the project. 2nd Ed, Page 246 Click here for Hint

crashing or iterative planning or scrum? An agile project management methodology featuring daily project team meetings to address emergent issues. 2nd Ed, Page 247 Click here for Hint

adaptive project life cycle AOA or adaptive project life cycle or WBS? adaptive project life cycle A change-driven project life cycle, marked by concurrent planning and execution phases. 2nd Ed, Page 247 Click here for Hint

probabilistic or deterministic? standard normal distribution or probabilistic or deterministic? standard normal distribution A normal distribution with a mean of zero and a variance of 1. Page 214 2nd Ed, Page 243 Click here for Hint

path Any sequence of linked PERT or precedence relationship or path? path Any sequence of linked activities that connect the beginning with the end of a project network. Page 195 2nd Ed, Page 225 Click here for Hint