LIU-PSB Status and Outlook

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Status of the PSB 2 GeV Upgrade and the RCS Study SGUI Meeting B. Mikulec, 07 July 2011.
Power converters implications for Booster Energy Upgrade Jean-Paul Burnet, Serge Pittet LIU day, TEEPC.
Review on PSB 160 MeV H- Injection Nov 9-10, 2011 Closeout by P. Cruikshank, M. Giovannozzi, D. Johnson, B. Jones, B. Pine, M. Plum, D. Tommasini.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
New injection region 1L1 Engineering Change Request PSB-L-EC-0001 EDMS Wim Weterings PLI Meeting Wednesday 14 th January 2015.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
PSB Injection Overview + Specification changes ABT LIU Project Review Wim Weterings.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
PSB-PS TRANSFER AT 2 GEV - CONCEPTS AND OPTICS W. Bartmann, J. Abelleira et al. ABT LIU Review, 20-Nov-15.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
PSB Reference Magnet (for the 2.0 GeV upgrade) A.Newborough 16 th October 2014.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Linac4 Project Meeting 1/2011 3/3/2011 M. Vretenar Update on schedule and structure 1.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
A new RF system for the PSB. LIU-PSB Working Group Meeting, 10th December 2015 M. Paoluzzi December 10 th Wide working group involved including.
LIU-Ions overall status and outlook: LEIR H. Bartosik for the LIU-IONS LEIR team* with lots of material from “Beam dynamics studies on LEIR”, H. Bartosik,
LIU-PSB Overview K. Hanke for the LIU-PSB Working Group K. Hanke, LIU-2011, 25 Nov 2011.
Reminder of upcoming milestones For all machines: Nov. 2012:Table of performance parameters Jan. 2013: Baseline activities defined Feb. 2013: Update APT/EVM.
PS-LIU status S. Gilardoni – BE/ABP H. Damerau – BE/RF LIU-PT 27 Aug
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Wim Weterings Remy Noulibos
26/11/2015 LIU-PSB meeting, Status of BE and BT kickers and septa 2 Extraction and Recombination Septa and Kickers status Jan Borburgh, M. Atanasov, W.
Status of the BI Work Package in the LIU-PSB frame
Linac4 status and perspectives
Linac4-PSB 160 MeV connection readiness review
LIU-PS Beam Dynamics Working Group Introduction and objectives
LIU – EVM status and next steps
J.-L. Sanchez Alvarez(PSB-EIC)
LINAC4 ADVISORY COMMITTEE
Brief Status SPS Prototype PSB Prototype Installed in LS1
EYETS David Hay EN-OSS.
ELENA installation and commissioning status
Online check lists Half Sector Test
LIU Wire Scanner Milestones June 2017
Installations up to Start of Commissioning
LIU / HL-LHC Cost and Schedule Review
Risk Assessment / Mitigation / Spares
LIU – EVM status and next steps
AD consolidation activities in LS2
LIU–PLI report LIU PSB meeting.
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
EC Activities Status for the LIU
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Emittance growth AT PS injection
TE-ABT Activities for LS2
Status of the BI Work Package in the LIU-PSB frame
TE/EPC activities for LINAC 2, PSB, PS & TT2 during EYETS
HALF SECTOR TEST: a test for the future PSB injection
Update on the HiLumi/LIU parameters and performance ramp up after LS2
WPs concerned by L4 connection:
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Update on the PSB Transfer Lines
PSB-PS instrumentation for LIU
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD
LINAC4 commissioning plans etc.
Status of the BI Work Package in the LIU-PSB frame
Presentation transcript:

LIU-PSB Status and Outlook G.P. Di Giovanni, G. Guidoboni, K. Hanke, B. Mikulec and the LIU-PSB Working Group TABLE of CONTENTS: LIU-PSB Scope Ongoing LIU-PSB Activities during EYETS 2016/2017 Linac4-to-PSB Readiness Connection Half Sector Test Other Activities and Plans Beyond 2017 Cost & Schedule Review Conclusions LHC Performance Workshop 23-26 January 2017 LIU-PSB status and outlook Gian Piero Di Giovanni

LIU-PSB Upgrade Scope Upgrade of PSB rings and Upgrade of PSB injection from 50 MeV protons to 160 MeV H- with increased Intensity Upgrade of PSB rings and extraction/transfer from 1.4 GeV to 2.0 GeV Ekin =50 MeV  160 MeV from Linac4 to PS Ekin =1.4 GeV  2 GeV Increasing injection energy from Linac4 and new injection scheme: Higher injection energy (160 MeV) leads to increased brightness. H- injection, essentially loss free and allows to tailor emittances. Increasing PSB extraction energy (2 GeV): Reduces space charge effects at PS injection. LHC Performance Workshop 23-26 January 2017 LIU-PSB status and outlook Gian Piero Di Giovanni

LIU-PSB Activities: EYETS 2016/2017 Destination PS New prototype wire scanner BWS in R3 (4L1) New beam loss monitors Fast Ionization Chambers 4 New current monitors (BR.TMD) with renovated windings and electronics (8L1) New wideband electrostatic pick-up BPM (BTP.BPMW15) Renovate electronics for 4 current transformers BR.BCTDC (section 9) New ring trajectory measurement system PSB-TMS Enlargement of the shaft Replace Screen Monitor BTV (BTP.BTV10) Exchange Septum SMH (15L1) New kicker KSW (16L1) LHC Performance Workshop 23-26 January 2017 LIU-PSB status and outlook Gian Piero Di Giovanni

(De-)Cabling LIU DEC 50.4% 49.6% About 2900 new cables to be installed for LIU. No more space for cable trays: de-cabling must be ensured first! Cable clean-up in stages: 2014/15: identification of obsolete cables - Done YETS 2015/16: disconnection of obsolete cables - Done EYETS 2016/17: 10 weeks of cables removal - Ongoing activity with BE-OP’s support. Following the 2015 Cost&Schedule review recommendations. About 2.5 weeks allocated for installation of new cables: Follow a priority list based on the relevance of the equipment to perform beam measurements. All remaining requests needed for Linac4 connection will be ready for execution! New replace remove LHC Performance Workshop 23-26 January 2017 LIU-PSB status and outlook Gian Piero Di Giovanni

Early Linac4-to-PSB Connection Mandate: All equipment for injection of 160 MeV H- ions from Linac4 must be ready by end 2016 to allow for Linac4 connection in the event of a undesired long LHC shutdown. Initiation of the plan: Serious incident in the LHC, requiring of order 6 months (or more) to repair and re-hardware commission. NOT a Linac2 failure scenario, which could be replaced by Linac4 for 50 MeV operations. Steps required for the early Linac4-to-PSB Connection: Full 160 MeV connection, including H- charge-exchange injection. Protons extracted at PSB still at 1.4 GeV → Produce beams as in operation today! Crucial impact on planning, resource allocation. LHC Performance Workshop 23-26 January 2017 LIU-PSB status and outlook Gian Piero Di Giovanni

Early Linac4-to-PSB Connection Readiness review in August 2016 (https://indico.cern.ch/event/548092/) Items to closely follow up, as identified at the time of the review: Chicane magnets transformers alcove → In progress: Ready in the course of 2017. Turn-by-turn matching monitor → Desirable, not mandatory. Ready in YETS 2017/2018. Tune Pickup → Ready by Q3 2017. Handling tool for the injection region → Tool complicated. By the end of 2016 TE-ABT provided a mock-up area assembly to test the equipment installation in IR. Ready for L4 connection. Integrate the vacuum acceptance tests in the planning of components → Part of coordination activities. Items to closely follow up, as identified after the review: TE-ABT equipment (distributor, vertical septum, chicane magnets) which will be ready for installation by June 2017. LHC Performance Workshop 23-26 January 2017 LIU-PSB status and outlook Gian Piero Di Giovanni

Early Linac4-to-PSB Connection Summary of the Readiness Review: PSB ready for an early 160 MeV H- injection by mid 2017: Readiness delay in few equipment. Still compatible with the earliest available date for readiness set for Spring 2017. The connection will require a lot of work in radioactive areas. Large amount of co-activity and interdependencies. Reduced commissioning time of the equipment in lab. Half Sector Test (HST) is a crucial milestone to reduce technical and planning risks for installation and commissioning of the future PSB injection chicane. Need for a reliability run of Linac4 from CCC by BE/OP. Current schedule allocates 9 months from “go-ahead” to delivery of first beam. 6 months for installation + 3 months for commissioning. LHC Performance Workshop 23-26 January 2017 LIU-PSB status and outlook Gian Piero Di Giovanni

Half-Sector Test (HST) and Stripping Foil Test Stand Installed in Linac4 during summer 2016 Stripping foil system Chicane magnets + H0/H- dump Temporary dump Stripping Foil Test Stand + diagnostics, vacuum eq. … Linac4 LHC Performance Workshop 23-26 January 2017 LIU-PSB status and outlook Gian Piero Di Giovanni

HST: Installation Aim Reduce technical and planning risks for installation and commissioning of the future PSB injection chicane during LS2. Outcome without beam: Discovered few design/fabrication issues → mitigation measures implemented. Experience in assembling chicane magnets and attaching fragile foils on frames. Vacuum acceptance issues of the foil loader → need for dedicated ‘under vacuum’ storage units and transport boxes of spare/exchange loaders Permanent installation of stripping foil test stand in Linac4 line to Linac4 dump: Study of different foil types/materials/thicknesses & handling. Evaluation of foil holder, beam instrumentation, interlocks, controls, applications. Stepping motor Magnetic coupling Mirrors and Optical Filters Beam Observation System (BTV) Foil Changer Vacuum Chamber Beam Radiation Hard Camera LHC Performance Workshop 23-26 January 2017 LIU-PSB status and outlook Gian Piero Di Giovanni

HST and Stripping Foil Test Stand: First Beam Stripping foil test stand: First beam on 13th of October 2016 HST: First 160 MeV H- beam on 26th of October 2016 view screen stripping foil ~60 MeV, 100 μs long, 6 mA H- beam from Linac4 FIRST BEAM! BCT downstream stripping foil after steering protons H- BCT upstream stripping foil LHC Performance Workshop 23-26 January 2017 LIU-PSB status and outlook Gian Piero Di Giovanni

HST: First Outcome with Beam Improved handling and procedures  should reduce installation and repair times for PSB. A lot of effort went into preparing/improving controls and applications for Linac4 and HST  should reduce commissioning time for connection: Run from CCC. Advancement to work with different cycles to reduce dependency on Linac4 commissioning (ongoing). Debugging/improvement of beam instrumentation (ongoing): First signals on H0/H- and stripping foil current monitor. Implementation of new interlock after 2 foil breakages. Improvement of chicane power supply precision (ongoing). Most interlocks implemented and functional, pre-chopper controls changes. LHC Performance Workshop 23-26 January 2017 LIU-PSB status and outlook Gian Piero Di Giovanni

HST: Open Points Linac4 pulse stability issues need to be solved to allow HST precision measurements: Phase/current/position instabilities along the pulse. Energy instabilities from pulse-to-pulse. Chopping not 100% effective  LEBT and MEBT re-alignment during EYETS. Beam instrumentation issues: Beam Current Transformers: >100% transmission upstream of Linac4 dump/HST. New version of H0/H- monitor electronics (interlocks and noise reduction). Monitoring of the stripping foil current. Check cabling of diamond beam loss monitor. Linac4 100 μs pulse at BPM after PIMS (L4T.BPM.227) Phase [deg] Current [A] Horizontal Position [mm] Vertical Time: 1 sample = 45.42 ns LHC Performance Workshop 23-26 January 2017 LIU-PSB status and outlook Gian Piero Di Giovanni

HST: Plans for 2017 Planning: HST and Test Stand run from February to end of March. Dismantling of HST beginning of April to install debuncher. Measurement Program in 2017: Aperture scans with different optics. Chicane optimization. Improved stripping efficiency measurements with BCTs and H0/H- monitor for different foils and optics. Sensitivity measurements of beam instrumentation. High-intensity measurements: Interlock thresholds. Stripping foil temperature measurement. Destructive measurements with foils. LHC Performance Workshop 23-26 January 2017 LIU-PSB status and outlook Gian Piero Di Giovanni

Building ready for POPS-B installation POPS-B Building 245 POPS-B Building 245 Completed New building 245 to host the new main power supply system (POPS-B) and new reference magnet completed in mid 2016. New building 245 to host the new main power supply system (POPS-B) and new reference magnet. Converter hall False floor Loading platform Building ready for POPS-B installation January 2016 as presented in Chamonix LHC Performance Workshop 23-26 January 2017 LIU-PSB status and outlook Gian Piero Di Giovanni

Lessons from POPS Incidents Faults affected POPS operation during 2016 resulting in either stops or operations in degraded mode. POPS-B will be a very similar system with the same technological choices. Problems understood and mitigation being implemented. Structural changes in B245 for the capacitor room to enhance the safety of the operations. Additional 4 months for the design of the power converters. Despite the re-arrangement of the schedule for POPS-B, the overall project is still on time as margin was accounted in the original schedule. LHC Performance Workshop 23-26 January 2017 LIU-PSB status and outlook Gian Piero Di Giovanni

RF System Large longitudinal emittance LHC25ns type beam, longitudinally blown up from 1.3 eVs to 2.8 eVs. Voltage functions and beam intensity for NORMHRS, with Finemet® cavity. In 2016 reliability run with the Finemet® cavity replacing the second harmonic system for high intensity ISOLDE beams. During EYETS 2016/2017 work to improve the operational settings of the current prototype system. Optimizations of the longitudinal blow up of the beam to reduce space-charge at PS injection are being studied with encouraging results. Test for control h=1+2+3 at capture in the PSB to flatten the bunch and mitigate space-charge for high intensity beams. LHC Performance Workshop 23-26 January 2017 LIU-PSB status and outlook Gian Piero Di Giovanni

Other Activities Item/Activity Status BI Beam Stoppers Beam stoppers will be removed at the time of the L4 connection, not replaced. The access procedure will be adapted to comply with safety rules. Cooling and Ventilation Separation of the TT2 cooling from the PSB. Cost neutral for LIU. B-Train System FIRESTORM prototype being installed in EYETS 2016/2017. PSB RF Bypasses PS RF bypasses maybe enough for LIU-PSB: To be tested after EYETS 2016/2017. Recombination Kickers Work ongoing to evaluate the rise time to meet LIU specifications. One KFA10 tank with 4 upgraded magnets to be built. Present KFA20 to be reconfigured to minimise risks of flashover. Remaining activities on track and in procurement phase. LHC Performance Workshop 23-26 January 2017 LIU-PSB status and outlook Gian Piero Di Giovanni

LIU-PSB Activities: YETS 2017/2018 Destination PS New SEMGrid (4L1 ring 3) New Tune pick-up BPM (3L1) LHC Performance Workshop 23-26 January 2017 LIU-PSB status and outlook Gian Piero Di Giovanni

LIU-PSB Activities: LS2 Destination PS PSB Injection Systems: New Injection bending (BHZ INJ) New Distributor (BI.DIS10) New Septa (BI.SMV10) Relocate beam instrumentation (BI.BTV30) Consolidation (x16) and energy increase (x9) related new magnets. PSB Extraction and Transfer: New BHZ EXT New septum (BT.SMV10 and BT.SMV20) Relocate beam instrumentation (BT.BTV30) New kicker (BT.KFA10) Energy increase related new magnets x17 New Absorber/Scraper New PSB Injection Region Remove the current sector (1L1) New H- charge exchange injection systems New extraction kicker (BEr.KFA14L1) New Wire Scanner x4 (11L1) New RF bypasses Laminated side plate on bending (BHZ MAIN) Parallel shunt resistors on quadrupoles (QDE, QFO) and bending (BHZ MAIN) magnets Transverse Feedback New interlock system PSB extraction to PS Under studies: Change of the BTP beam stopper New vacuum window before the PSB Dump New finemet cavities BR2&4.C02 7L1 BRr.C04 13L1 BR.C16.5L1 New Wire Scanner x3 (4L1) Replace kicker KSW (16L4) Move kicker KSW (from 16L4 to 2L1) LHC Performance Workshop 23-26 January 2017 LIU-PSB status and outlook Gian Piero Di Giovanni

Cost & Schedule Review in 2016 The cost and schedule of LIU has been reviewed in October 2016, 18 months after the previous review in 2015, https://indico.cern.ch/event/542864/. The cost estimates are based on existing equipment and are well founded. The cost and schedule risks for the defined scope are low. Manpower to be added to allow the project to stay on schedule, in particular for RF and beam dynamics support. LHC Performance Workshop 23-26 January 2017 LIU-PSB status and outlook Gian Piero Di Giovanni

Conclusions The LIU-PSB project is now in full execution phase: Procurement, manufacturing, installation, ramping up the expenses. Project well on track, no changes to its baseline during 2016. PSB ready for an early Linac4-to-PSB connection by mid 2017. The Half Sector Test is a crucial milestone and it is proving to be beneficial. Other important milestones met or will be met during the EYETS 2016/2017 with many important LIU activities taking place in the machine. LHC Performance Workshop 23-26 January 2017 LIU-PSB status and outlook Gian Piero Di Giovanni

LHC Performance Workshop 23-26 January 2017

POPS Experience Feedback on POPS-B History of the problems in 2016: Couple of short circuits in the DC1 power converters at the beginning 2016 resulting POPS to operate in degraded mode. At the end of April 2016, while restarting the POPS from degraded mode to full operational mode, one capacitor was short circuited causing a short circuit of all capacitors in the storage bank, releasing a lot of energy. Explosion in one of the POPS containers The experience with POPS directly impacted the planning of POPS-B. POPS mitigation measures: Different capacitor design for POPS. Additional proposal to separate the capacitors such that they add fusing elements to reduce the released energy in case of a similar fault. LHC Performance Workshop 23-26 January 2017 LIU-PSB status and outlook Gian Piero Di Giovanni

Preliminary Harmonic=1+2+3 in PSB Courtesy of S. Albright Preliminary simulations (without space charge): Preliminary Not directly comparable (power is different), but it seems to go in the right direction Smaller bucket height More rectangular LHC Performance Workshop 23-26 January 2017 LIU-PSB status and outlook Gian Piero Di Giovanni

Magnets, LIU-PSB Activities Item/Activity Status BI.BVT (4 magnets) Ready for L4 connection Booster injection corrector magnets Main BHZ magnets (2 yokes & 4 coils set) On track for LS2 Main BHZ shimming and saturation Main BHZ cooling mods Damping resistors needed: To be installed in YETS 2017/2018 Quadrupole Magnets BT&BTP Booster extraction corrector magnets BT.BHZ10 & BTM.BHZ10 LHC Performance Workshop 23-26 January 2017 LIU-PSB status and outlook Gian Piero Di Giovanni

TE-ABT Injection Line Item/Activity Status BI.DIS10 (Distributor) Magnets tested New coil for heat dissipation reduction Control ready by June 2017 BI.SMV10 (Vertical Septum) Issue with bake-out. Aim is to have 1st tank completed by June 2017 BI.KSW (Painting Bump) Hardware ready for L4 connection Control ready for June 2017 BI.BSW (Chicane Magnet) Ready by June 2017 Stripping Foil System Ready for L4 connection LHC Performance Workshop 23-26 January 2017 LIU-PSB status and outlook Gian Piero Di Giovanni

Extraction Line Item/Activity Status Extraction kicker KFA14L1 Spare being built; on track for LS2. Extraction septum SMH15L1 Completed. Installation in EYETS 2016/2017. Recombination septa Procurement phase; on track for LS2. Recombination kickers Work ongoing to evaluate the rise time to meet LIU specifications. One KFA10 tank with 4 upgraded magnets to be built. Present KFA20 to be reconfigured to minimise risks of flashover. Magnets On track for LS2. Power Converters Beam Instrumentation BLM, screens, wideband PU to installed in EYETS 2016/2017. Other activities on track. Design of the Transfer Line Optics regularly reviewed and integration updated whenever needed; on track for LS2. LHC Performance Workshop 23-26 January 2017 LIU-PSB status and outlook Gian Piero Di Giovanni

Recombination Kicker Rise Time Clear specifications for (2-98%) rise time in LIU at 105 ns and 2% ripple. Measurement with search coil in YETS 2015/2016 reported: BT1,4.KFA10 measured rise time to be ~125 ns (outside LIU specs). BT2.KFA20 measured rise time to be ~95 ns (within LIU), but to be run at a very close breakdown voltage for 2 GeV operation. In 2016 several beam-based measurements performed: BT1,4.KFA10 measured to be ~105 ± 10 ns at Intensity of 200E10 ppp. BT2.KFA20 measured to be ~110 ± 10 ns at Intensity of 200E10 ppp. Measurements suggest that the current kickers would operate at the edge of the specification and would results in a 2% emittance blowup at PS inj. Possible solution identified in producing main switches: To be tested in lab. If successful, it will result in an additional cost for LIU-PSB. Proposal to re-cable BT2.KFA20 as BT1,4.KFA10 to reduce the risk of magnet breakdown. LHC Performance Workshop 23-26 January 2017 LIU-PSB status and outlook Gian Piero Di Giovanni

B-Train System Functional specifications being documented. Several topics still under discussion: Synthetic/simulated facilities, FEC architecture, decoupled White Rabbit interface, high-level CCC interface, long-term data logging, … Close interaction with TE-EPC to agree on the routing of the cables to the reference magnet. Agreed to install a FIRESTORM B-train prototype during EYETS 2016/2017: Provide magnetic diagnostics and allow testing the feedback to new LLRF system. Prove that both the old and new systems yield the same results with the very same sensors. New coils and cabling installation on the current reference magnet during EYETS 2016/2017: Feed independent signals to the new FIRESTORM prototype B-train chain. Get missing information: full integral field, fringe field, remnant field, internal rings. Additionally, ongoing discussion to sort out the best solution for the field control of the switching dipole BT.BHZ10. LHC Performance Workshop 23-26 January 2017 LIU-PSB status and outlook Gian Piero Di Giovanni

CONSolidation Item/Activity Status PSB Cooling Plant Full renovation; on track for LS2. Cooling & Ventilation Separation of the TT2 cooling from the PSB (more logical architecture, more operational flexibility). Cost neutral for LIU. Rack Supports To address issues with safety and non-conformities; mostly done during the EYETS 2016/2017 Cable Clean Up Mandatory step for LIU; done during the EYETS 2016/2017 BTP.STP10 Requested budget from CONS; strongly endorsed by LIU (reliability issue). A number of high-cost CONS items (RF, Power) have been integrated in the LIU baseline at the beginning of the project. LHC Performance Workshop 23-26 January 2017 LIU-PSB status and outlook Gian Piero Di Giovanni