ATF2 Magnet Power Supplies

Slides:



Advertisements
Similar presentations
Hardware Integration of the Prototype Wes Grammer NRAO September 24-26, 2012EOVSA Prototype Review1.
Advertisements

Water & Wastewater Pump Station Control Basic parts: Metering & current limiters Main switch chassis Telemetry & Control Pump controls Questions: -IP.
L-Band Test Stands in ESB Carsten Hast Test Facilities Department Helps to develop and test near-term solutions for accelerator systems including RF structures.
E951 POWER SUPPLY 5/13/02 IOANNIS MARNERIS Brookhaven National Labs.
December 6, 2007AIP /02 P Bellomo - QE Magnet Power System Upgrade1 AIP /02 Review LINAC SECTORS 22 AND 23 QE MAGNET POWER SYSTEM UPGRADE.
E951 POWER SUPPLY SAFETY REVIEW 9/06/02 IOANNIS MARNERIS Brookhaven National Labs.
HA Power Supplies - Demonstration Criteria and Status February 23, ATF2 Project HA Power Supplies Demonstration System Evaluation Criteria And Status.
19-21 Dec 20075th ATF2 Project Meeting1 ATF2 High Availability DC Magnet Power Supplies By: Paul Bellomo, Antonio de Lira, David MacNair and Briant Lam*
Electrical Installation CM39 Andy Gallagher & Ian Mullacrane.
15 December ATF2 High Availability DC Magnet Power Supplies – Commissioning Status By: Paul Bellomo, Antonio de Lira, Briant Lam* and David MacNair.
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Magnet Controls Group LCLS Magnet Controls August 16, Status of the LCLS Magnet PS Controls Needed for First Injection.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Controls for High-Availability Magnet PS’s for ATF2 Glen White SLAC September
19-21 Dec 20075th ATF2 Project Meeting1 Power Supply Progress and Magnetic Field Stability Summary By: Masayuki Kumada (NIRS) and Briant Lam* (SLAC)
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
21 March 2007ATF2 Power Supplies ATF2 High Availability DC Magnet Power Supplies By Paul Bellomo, Antonio de Lira, David MacNair and Briant Lam*
2nd ATF2 meetingRole Sharing between KEK and SLAC M.Kumada Role Sharing between KEK and SLAC 1.Performance of Demonstration power supply of KEK 2.Role.
18-20 December rd ATF2 Meeting, KEK ATF2 Power Supplies1 ATF2 High Availability DC Magnet Power Supplies By Paul Bellomo, Antonio de Lira, David.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
Stephen Schuh Vacuum Controls SCR and 16 November 2005 Vacuum Controls System Concept Review and Preliminary Design Review.
Electrical & Control Power Supplies Trevor Hartnett.
ATF Control System and Interface to sub-systems Nobuhiro Terunuma, KEK 21/Nov/2007.
F Booster Long Straight Corrector Upgrade Technical Status and Schedule for Installation Craig Drennan DOE Tevatron Operations Review March 27, 2007.
Magnet Controls GroupOctober 4, Scope, Cost Estimate and Schedule To Complete The LCLS Magnet PS Controls P Bellomo and Kristi Luchini.
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
ILC BDS Kickoff Meeting Magnet Power Supplies RDR Concepts and Completeness Paul Bellomo SLAC Power Conversion Department October, 2007.
ATF2 Accelerator Status and Plans for JFY 2014 runs N. Terunuma, KEK.
1 ATF Instrumentation Status and Planning Justin May, Juan Cruz, Doug McCormick, Janice Nelson, Tonee Smith, John Wray 1.
The Building 180 Cryogenic infrastructure water cooling system Status Update Stefano Moccia, EN-CV Coordination meeting 14/10/15.
Hamid Shoaee Control LCLS ARR Oct 31, LCLS Accelerator Readiness Review Control System for Injector Commissioning.
FEE Electronics progress Mezzanine layout progress FEE64 progress FEE64 initial testing Test mezzanine. A few of the remaining tasks 2nd October 2009.
Connecting the cRIO to the 12 V power source and your computer
1 S-FRS Magnet Test Bench SuperFRS Magnet Test Bench Power Converter Status H. Thiesen 13 May 2015.
1 Mice Collaboration Meeting CM27 STFC Rutherford Appleton Laboratory, UK 7 th -10 th July 2010 Daresbury Laboratory Electrical Infrastructure Report Authors.
MICE Project Progress Update Power Converters Rack housing MQ1 to MQ3 magnet power converters –Marshalling for all other quadrupole & dipole units –Houses.
MICE RF – Installation at RAL Tim Stanley RAL 7 November 2013.
High Voltage modulators ESS developments Carlos A. Martins ESS Accelerator Division, RF electrical power systems.
KEK ATF2 High Availability DC Magnet Power Supplies Phase 2 Progress and Specifications 31 May 2006 Paul Bellomo, Antonio de Lira, Briant Lam and Dave.
January 12, 2006 ATF2 DC Magnet Power Supplies1 Paul Bellomo and Briant Lam.
Laser Control Status A. Masi, T. Feniet, K. Szczurek Awake Technical Board November 12 th 2015 Thanks for inputs from: M. Donze`, V. Fedosseev, C. Hessler.
ELENA installation progress F. Butin / ELENA collaboration.
Current Status of QBPM Electronics and Magnet Movers D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
S A Griffiths CM42 June 2015 Electrical & Control.
IBBelle: Status & Plans
MICE RF System Power Supplies, Control and Monitoring Status report
COOLING LHC RACKS PROCUREMENT
ATF/TTF Instrumentation Nov. 27, 2006 Last report: Oct. 2
Magnet Power Supplies for SuperKEKB Main Ring
352MHz Klystron Control for the 3MeV Linac test stand
AIP /02 P Bellomo - QE Magnet Power System Upgrade
LLRF Controls Outline Requirements External Interfaces Schedule Design
HAPS Controls Glen White ATF2 Software Review Workshop, LAL, June 2008
SC1R Cold Box PDR Controls
LLRF and Beam-based Longitudinal Feedback Readiness
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
Magnet PS Controls Hardware Status
Scope, Requirements Deliverables & Schedule
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Magnet Controls K. Luchini
Prototype cryomodule development
LTU/Undulator Installation Status
Teleconference ACS – FREIA 19th June 2017
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
LCLS Control System Personnel Linac & BC2 Controls progress
Rack installation and local tests for the MEBT Chopper Rack
Presentation transcript:

ATF2 Magnet Power Supplies Briant Lam, SLAC 22 May 2007

Responsibilities Power supply system Responsibility Controllers SLAC Bulk Power Supplies Power Supplies (Power Modules) Cooling Fans Racks Intrarack cables Controller Software System Software KEK Performance Test Cables   Input AC cables DC cables to magnets DC cable raceway system Ethernet Cables to Controllers Magnet Interlock Cables to Controllers Installation Wiring and Layout Diagrams Training Cable Termination Testing System

System Software EPICS drivers: Glen White Similar to LCLS and SPEAR ATF2 has additional commands and readbacks: Disable Individual Modules Reaback Individual Module Current Display Individual Module Fault GUI is still to be determined

First Commissioning Phase Items needed from KEK AC Power Cables 400 Vac 100 A (6 total) 100 Vac 20A (9 total) DC Power Cables 2 AWG or 40 mm2 for 50 A Power Supplies 4/0 or 140 mm2 for other Power Supplies Control Cables Ethernet Cables and Switch Interlock Cable Water Flow and Thermal Switch

First Commissioning Phase Planned Delivery Deliver the Power System Feb-Mar 2008 Commissioning Team Briant Lam + 1 SLAC Technician/Engineer Initial Tests at KEK Turn On Power Supplies with Local Laptop or Local Control Board. Tune each Power Supply to Magnet Load

Power Supply Progress Racks: 28 May 2007 PLC: Received, fabricating chassis Bulk Power Supplies: Received, test this week EPSC: Mid-June 2007 HA Power Supplies: Prototype: Mid-August 2007 1st Batch: Mid-October 2007 2nd Batch: Mid-November 2007