FFAG Magnets and Girders Meeting

Slides:



Advertisements
Similar presentations
Fischer Manufacturing is an electrical fabrication company based in New Brighton, MN. We specialize in building to engineering specified requirements.
Advertisements

LINACs Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
1 ATF2 - IP Chamber Design and manufacturing of Chamber with high precision piezo actuators for high resolution BPMs Status / progress report – 26 June.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Vacuum Systems H.C. Hseuh, Vacuum Group Leader 8 th ASAC Meeting for NSLS-II Project May 10-11, 2011.
LINAC 4 Project L4T/L4Z Design Status J.Humbert / B.Riffaud on behalf of EN-MME design team 1 st September 2011 LINAC4 – BEAM COORDINATION COMMITTEE B.Riffaud.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
Injector/Re-injection Chicane Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
ERHIC: an Efficient Multi-Pass ERL based on FFAG Return Arcs June 9, 2015Stephen Brooks, ERL On behalf of the eRHIC design team.
WA104 Aluminum Cold Vessels A possible scenario. CAVEAT Definition of the experimental layout still under discussion within the ICARUS Collaboration (dimensions.
 YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. for checking dimension of 680 mm (0/-0.5)  Fasteners.
ECOOL Meeting 03/26/10 1 Low-E cooler baseline decisions: 1.FNAL’s cooling section “as is” – with weak solenoids, correctors, etc. (to prevent over focusing.
October, 2009 Magnet Electrical Systems Bob Lambiase October, 2009 Internal Review.
Extraction Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
F Booster Long Straight Corrector Package Installation Craig Drennan 2007 Shutdown Planning Meeting April 6, 2007.
February 17-18, 2010 R&D ERL Gary McIntyre R&D ERL ERL Status & Schedule Gary McIntyre February 17-18, 2010 ERL Status & Schedule.
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Systems Installation F. Willeke, ASD Director 6 th ASAC October 22-23, 2009.
1 FPA Stage 2 Peer Review May 12, 2006 T. Brown. 2 FPA Stage 2 Status Summary of Stage 2 activities Review current design status Review schedule details.
ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
ESS DTL: Prototyping M.Comunian - F. Grespan – P. Mereu Lund– 10/04/2013F.Grespan.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Jan , 2008 LCLS Undulator Week Dean R. Walters 1 Vacuum Components Undulator System SH Lee, J Morgan, and D Walters.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
A.Ryazantsev, IHEP-Protvino, RussiaPANDA Russia Workshop at Moscow, May 2015 Status on Barrel Mechanics Andrey Ryazantsev on behalf of the IHEP-Protvino.
LCLS-II Prototype Cryomodule Darryl Orris 21 January 2015 Final Design Review: Instrumentation.
CBETA Project ALD’s Cost and Schedule Review February 6, 2017
Beam Commissioning Adam Bartnik.
High energy beam transport.
CBETA Vacuum System and Beam Stop (Conceptual Design) Yulin Li, CLASSE.
George Mahler, Steven Trabocchi, J. Tuozzolo, Stephen Brooks
CBETA Technical Review
Installation Global System
Page Headline Beam Commissioning Adam Bartnik.
Page Headline CBETA Splitter.
Roadmap for triplet cryostats
CBETA Vacuum System and Beam Stop Yulin Li, CLASSE.
Complementary ISTC Projects #3888, 3889p
CLEX* Status and Plans CTF3 complex CLEX
Oversight Board Meeting October 3, 2017 Rob Michnoff
T1 status (a selection from EDR presentations)
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
Design Review FFAG Magnets & Girders
SIS100 quadrupole status S. Kostromin, H. Khodzhibagiyan, G. Trubnikov, FAIR 11th MAC, GSI, May,
Controls CBETA controls will extend existing EPICS control system
Engineering Status.
The 11T cryo-assembly: summary of design and integration aspects
MICE Coupling Coil Update
FFAG Magnet and Girders
Page Headline Splitters.
Status of the PANDA Solenoid Magnet Production in BINP
Potential Use of PEP-II Magnets by Project X
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
FRACTIONAL ARC TEST GIRDER DESIGN REVIEW
LCLS Injector: Introduction D. H
Experimental equipment Edgar L. Black February 17, 2019
Electron Beam Systems ETC and Methodology
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
LCLS Undulator System Status and Schedule
Extraction Michael Bevins May 17, 2007
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
LCLS Undulator System Status and Schedule
Injector/Linac Design Status C. E
Undulator and Magnet Production Status 25 October 2006
Polarized 3He target installation
Presentation transcript:

FFAG Magnets and Girders Meeting September 6, 2017

CBETA Machine Layout Injector cryomodule Electron source Dump Main linac cryomodule Merger IN Splitter B DI Diagnostic line Splitter A RX SX FFAG arc B FFAG arc A FB FA FFAG Transition B FFAG Transition A TB ZB FFAG straight ZA TA

Agenda Girder for fractional arc test Design review / status and procurement review, Wednesday September 20, 2017, 9am Magnet procurement and assembly plan Schedule

Fractional Arc Test Girder Construction of ½ magnet Design and construction of girder plate (Is this a special plate for fractional arc test only?) Plate drawing with all drill holes Water connections Power supply connections and terminal blocks Rebuilding of preproduction magnets Testing and acceptance of preproduction magnets for fractional arc test Magnet tuning Disassemble, re-assemble Halbach magnet test

Design Reviews FFAG magnets, girders, power supplies Halbach magnets Magnet design Definition of types, layout Corrector magnets Power supplies – specifications, manufacturer model number options, etc., controls interface Halbach and corrector magnet assembly details Procurement plan Girder assembly plan Magnet adjustability design Girder plate final dimensions, number of different configurations for beam pipe mounting Surveying plan – what will be done at BNL/CU? Will beam pipe need to be shipped to BNL for installation on girder, or can that be done at CU after girder preassembly? If beam pipe is shipped back and forth, at what stages will leak checks be performed? Plan for vertical split assembly/disassembly Extension plates (bolted on to standard plate?) for first and last arcs to accommodate beam pipe section between splitters and FFAG Shipment plan and staged schedule

Halbach Assembly Plan Bid is out for quote (9/15 or 9/18 bids due) As an alternative, we should consider building the Halbach magnets in house What would it take to design good tooling? How should we proceed to develop this plan with cost estimate? Is manpower available? What is the realistic cost of aluminum housings?

FFAG girder assembly and test plan Need to define a good written plan Permanent magnet material Halbach assembly, testing, survey and acceptance Corrector construction, testing and acceptance Girder table construction Girder plate construction Assembly of beam pipe, magnets, wiring, piping, etc. on girder plate Shipping to Cornell Water connections and manifold design Final installation and surveying at Cornell Cable tray design Interconnecting wiring layout

Schedule – Milestones 5-6 First article production magnet milestone: 12/2017

Schedule – Milestones 7-8 Complete girder production: 11/2018 (should try to complete by 9/2018) Note 7.1, 7.2, 7.3 Complete final assembly: In order to satisfy 2/2019 milestone, installation of FFAG beam-line with all girders should be complete by 12/2018 or sooner.