Teleconference ACS – FREIA 17th October 2017

Slides:



Advertisements
Similar presentations
January 6. January 7 January 8 January 9 January 10.
Advertisements

Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
Harold G. Kirk Brookhaven National Laboratory The CERN Target Experiment Schedule and Budget MERIT Review BNL December 12, 2005.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
Hydrogen Delivery System – R&D Activities T W Bradshaw M Courthold M Hills J Rochford Daresbury Controls Group etc…
Mucool cryo-design Christine Darve Fermilab/Beams Division/ Cryogenic Department 8/12/02.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62)
EuCARD WP 7 – High Field Magnets Task – Radiation certification Status report EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Shrikant_Pattalwar TTC 2015 Dec 1, 2015 SLAC 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Installation of the T600 at Fermilab CSN2, September 22,
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
RESEARCH AND DEVELOPMENT FOR FUTURE LHC SUPERCONDUCTING MAGNETS POINT SUR LA STATION D’ESSAIS préparé par Jean-Marc Gheller Steering committee –September.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
1 BNL LHC Hi-Lumi QXF Vertical Test Facility Status Update M. Anerella, H. Hocker, P. Joshi, P. Kovach, A. Marone March 28, 2016.
Overview of On-going Cryogenic Work At the MTA Barry Norris AD/Cryo February 14, 2005.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
S A Griffiths CM42 June 2015 Electrical & Control.
October 7, 2010 HINS Test Cryostat 2 K Conversion Status October 7, 2010.
Final Design Cryogenic and mechanical configurations
Teleconf ACS – FREIA 28th March 2017
Teleconference ACS – FREIA 31th May 2017
Teleconf ACS – FREIA 13th March 2017
Mechanical and cryogenic configurations
Installation of the T600 at Fermilab
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
Uppsala University Contract UH2015/09 - UA2016/05 Job nr. 5973
IT-4189 Supply and installation of a cryogenic distribution system
CSP 25th November 2010 Technical agreement number 3: overview
Uppsala University Contract UH2015/09 - UA2016/05 Job nr. 5973/7200
Teleconference ACS – FREIA 18th April 2017
SPS cryogenic proximity equipment and SM18 validation
Teleconference ACS – FREIA 10th May 2017
Cryostat design Mechanical design: Thermal screens: Specifications:
LARP Vertical Test Facility
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
Teleconference ACS – FREIA 31st October 2017
(vertical cryostat, Gersemi)
Status of the cryogenic system for B180
Cryostat design Mechanical design: Thermal screens: Specifications:
MICE Coupling Coil Update
FRESCA Cryostats Outer cryostat during pressure test at the manufacturer Top plate and lambda plate for the outer cryostat Inner cryostat during reception.
Teleconference ACS – FREIA 20th February 2018
Uppsala University Contract UH2015/09 - UA2016/05 Job nr. 5973/7200
SNS PPU Cryomodule Instrumentation
Prototype cryomodule development
Double-Spoke Cavities
as a prototype for Super c-tau factory
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
Budker Institute of Nuclear Physics,
Teleconference ACS – FREIA 19th June 2017
UPPSALA UNIVERSITY_GERSEMI PROJECT
SNS PPU Cryomodule Instrumentation
Cryogenic upgrade of B165 CRG Status Meeting 16th may 2019
CRYOMODULE FINAL ASSEMBLY
2015 January February March April May June July August September
Cryogenic upgrade of B163, B165 & B253 Status Meeting 19th December 2018
Presentation transcript:

Teleconference ACS – FREIA 17th October 2017 Agenda: Manufacturing follow-up Planning Issues Future tasks

Manufacturing follow-up Cryostat Dewar piping ongoing (LHe circuit done) Thermal shield : cooling pipes validated (He leak test and thermal shock) Instrumentation and wiring starts this week Magnet insert Manufacturing drawings under final review Top lid is under cutting, required parts are in stock or already ordered Manufacturing starts W43 (end of October) Liquid insert Waiting for final cabling (W42) 17/10/2017 Teleconf ACS - FREIA 17th October 2017

Manufacturing follow-up Valve box Assembly of piping done Heaters and thermometers set on the thermal shield, 4k pot and heat exchanger Waiting for final cabling (W42) Transfer lines Manufacturing of the single line and multiline under way Simulator box Manufacturing drawings under final review Manufacturing started this week (W42) 17/10/2017 Teleconf ACS - FREIA 17th October 2017

Control and Command follow-up Control system design Programming done, waiting for test with GERSEMI systems Control system procurement Junction boxes done Electrical cabinet still at Technergie, not necessary yet 17/10/2017 Teleconf ACS - FREIA 17th October 2017

Teleconf ACS - FREIA 17th October 2017 Planning: GERSEMI   2017 2018 October November December January February March April 40 41 42 43 44 45 46 47 48 49 50 51 52 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 junction box manufacturing electrical wiring of VB electrical wiring of liquid insert electrical wiring of VC simulator manufacturing Simulator mechanical testing Simulator electrical wiring magnet insert manufacturing magnet insert mechanical testing magnet insert wiring final electrical wiring of control cabinet & test control cabinet & automaton test factory acceptance test with simulator control cabinet & automaton test with magnet insert packing of the project installation of project onsite cryogenic tests with simulator final installation of project without simulator acceptance tests with liquid insert acceptance tests with magnet insert 17/10/2017 Teleconf ACS - FREIA 17th October 2017

Teleconf ACS - FREIA 17th October 2017 Issues Cernox IPN: cernox in stock but not the right shape; checking possibility to manufacture “adaptor” parts and do the wiring Manufacturing this week (W42), delivery next week (W43) Wiring Delay for VB and liquid insert 17/10/2017 Teleconf ACS - FREIA 17th October 2017

Teleconf ACS - FREIA 17th October 2017 Future tasks Commissioning tests Final mechanical tests Helium leak test after assembly All circuits of VB with valves Electrical tests Electrical insulation Resistance Cryogenic test VB+simulator 17/10/2017 Teleconf ACS - FREIA 17th October 2017