LARP Vertical Test Facility

Slides:



Advertisements
Similar presentations
Design of the T962 Cryostat L. Bartoszek BARTOSZEK ENGINEERING 5/10/07.
Advertisements

ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
AMS-02 Cryosystem Phase III Flight Safety Review January 12, 2010 Phil Mott.
LARP LQX and MQX Cold Mass Testing at Fermilab Overview and Required Test Stand Upgrades Cosmore D. Sylvester.
February 17-18, 2010 R&D ERL Roberto Than R&D ERL Cryogenics Roberto Than February 17-18, 2010 CRYOGENICS.
1 Preparation for MQXF Short Model Tests G. Chlachidze Fermilab.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
US ITER TBM Meeting Idaho Fall, Idaho, Aug M Dagher P Fogarty 1.TBM/ITER General Arrangement 2.Equatorial Test port Configuration 3.Test Port.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
HQ TEST CERN by Marta Bajko CERN TE-MSC TF For Hi Lumi and LARP the 16 th of November 2011 CERN.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
LARP LQX and MQX Magnets Cryogenic Testing at Fermilab’s Industrial Building 1 Roger Rabehl Technical Division/Test & Instrumentation Department.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach.
April, 2009 ERL SRF CRYO MODULES AND CRYOGENIC SYSTEM.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Shrikant_Pattalwar TTC 2015 Dec 1, 2015 SLAC 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Restoring Komag Yasuhiro Makida Consideration of restoring and modifying Komag for a stand alone operation without the refrigerator. Contents 1.Magnet.
ILC IR FINAL FOCUS & EXTRACTION MAGNETS Prepared by Andy Marone ILC Workshop, Sept
LARP Collaboration Meeting Racetrack Coil Fabrication
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Spectrometer Solenoid Design and Test Results Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Installation of the T600 at Fermilab CSN2, September 22,
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
ILC Cryogenic System Shallow versus Deep Tunnel Tom Peterson Dubna Meeting 5 June 2008.
1 BNL LHC Hi-Lumi QXF Vertical Test Facility Status Update M. Anerella, H. Hocker, P. Joshi, P. Kovach, A. Marone March 28, 2016.
17-18 December 2013 LARP VTF Workshop BNL Proposal 1 A.Marone
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
1 BNL LHC Hi-Lumi QXF Vertical Test Facility Status Update M. Anerella, H. Hocker, P. Joshi, P. Kovach, A. Marone September 25, 2015.
MICE Spectrometer Solenoid Recovery Review - December 3-4, Steve Virostek MICE Spectrometer Solenoid Design and Assembly.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Page 1 CRYOMODULE 650 (TESLA Style) Stand Alone Tom Peterson and Yuriy Orlov Collaboration Meeting 25 Jan 2011.
Cooling Circuit Design Steve Virostek Lawrence Berkeley National Lab February 29, 2012 MICE Coupling Coil Cryostat Design Review Lawrence Berkeley National.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Installation of the T600 at Fermilab Fermilab, February 15,
October 7, 2010 HINS Test Cryostat 2 K Conversion Status October 7, 2010.
Final Design Cryogenic and mechanical configurations
Teleconf ACS – FREIA 28th March 2017
12 GeV Project Status Glenn R. Young 12 GeV Project Status
Mechanical and cryogenic configurations
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
Update on PANDA solenoid design
Existing Prototype Test Facility (PTF) and planned Series Test Facility Schroeder, Claus Cryo-Review Darmstadt
Mike Anerella December 17, 2013
MICE Meeting at RAL, Oct-23, 2005
HFM Test Station Main Cryostat
Teleconference ACS – FREIA 18th April 2017
Teleconference ACS – FREIA 17th October 2017
(vertical cryostat, Gersemi)
The 11T cryo-assembly: summary of design and integration aspects
Test box for ProtoDUNE SP – Integration Test
SHMS Cryogenics and Q2(Q3Dipole) Cool Down
FRESCA Cryostats Outer cryostat during pressure test at the manufacturer Top plate and lambda plate for the outer cryostat Inner cryostat during reception.
Experimental equipment Edgar L. Black February 17, 2019
Cryomodule Assembly Plan
Schematic diagram of the cryogenic system
PANDA The conceptual design of the control Dewar
CRYOMODULE FINAL ASSEMBLY
as a prototype for Super c-tau factory
SC1R Cold Box PDR Assembly Sequence
CRYOMODULE FINAL ASSEMBLY
J. Fleiter, S. C. Hopkins, A. Ballarino
Presentation transcript:

LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach December 17, 2013

Outline Background information Design details Assembly sequence

Background Info Crane capacity: double hooks, 30T and 5T Hook heights: 303 IN., 30t; 324 IN. APPROX, 5T “dewar 3” = 6.1 m deep, sits 0.9 m above floor, is 710 mm inner diameter Plan assumes 4785 mm overall cold mass length

Design Details

Overall System Configuration “ILC Service Cryostat” = self-contained heat exchanger, connected to LHe supply, LN2 supply, Nash Pump, etc. Transfer Line connects the two Vertical Dewar = 24KA vapor cooled leads, 1.9K, 1 atm vessel, 4.5K LHe “thermal shield”, insulating vacuum, instrumentation, etc.

Vertical Dewar Details G-10 hanging support G-10 – SST Lambda plate Top of lambda plate to bottom of dewar top hat = 40 in. (min. LHe distance ~ 28 in.) Bolted – metal seal 1.9K-4K relief 1.9K supply 300K Inner / outer Insulating vacuum 4K liquid - gas 300K 1.9K vacuum 4.5K vacuum 4K heat shield (existing dewar) vacuum Bottom detail 4.5K vacuum

Service Cryostat Details 5 Weka cryo valves: 4.5K reservoir supply reservoir to low pressure 1.9K reservoir to 1 atm. 1.9K reservoir to 4.5K thermal shield 80K thermal shield supply ILC power leads (not used) 1.9K exhaust (Nash vacuum) 1 atm. 1.9K supply to dewar helium pre-cool heat exchanger (from 1.9K exhaust) 1.9K exhaust 1.9K heat exchanger vacuum 4.5K reservoir 4.5K

Extra slides

Assembly Sequence

Cold Mass Ready For Up-Righting Lifting Details Top Hat/ Lambda Plug Prep Fixture

Install In Wiring Stand Attaching Top Hat/ Lambda Plug Assembly Remove Lifting Ring Lower Up-Righted Cold Mass into Wiring Stand

Lower Magnet To Final Position In Wiring Stand Solder main leads Connect Hypertronics, etc. Lower Cold Mass Assembly Onto Wiring Stand

Install 1.9K vessel Into Vertical Dewar (1 time only) Existing Vertical Dewar New Vacuum Jacketed 1.9K Vessel Install 1.9K Vessel Into Vertical Dewar On Temporary Support Rings

Install cold mass into dewar Lower Magnet Into 1.9K Vessel Bolt Lambda Plug to 1.9K Vessel Connect vacuum line Connect He fill line Remove Temporary Support Ring And Lower cold mass, 1.9K Vessel Into Dewar

Service cryostat connections Install Transfer Line Vacuum Jacketed Elbow Connect 1.9K Line Install Vacuum Jacket Closure Install Heat Shield