BE-BI Software for LINAC4

Slides:



Advertisements
Similar presentations
R Scrivens, CERN, ABI Workshop, 12/2008 The Feschenko Bunch Shape Monitor User experience at CERN Developed by INR, Troitsk. High resolution bunch shape.
Advertisements

BI Outlook for BI Day 2012 Based on latest (last Monday) feedback from EN/EL XXX As foreseen originally Partially ‘As foreseen originally‘ Postponed.
TUPD02 BEAM DIAGNOSTICS FOR THE ESS BLM BPM Trans Profile Bunch Shape BCM Preliminary System Count A. Jansson, L. Tchelidze, ESS AB, Lund, Sweden Hybrid.
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
Guy Crockford AB/OP OP Days, 7/2/2007 LHC Specific BI Systems This presentation reviews the status of the specific BI systems for the LHC. The work plan.
Beam Instrumentations: Requirements for Proton and Electron Beams C. Bracco, E. Gschwendtner, B. Goddard, M. Meddahi, A. Petrenko, F. Velotti Acknowledgements:
HIE-ISOLDE contribution packages M. Pasini BE/RF.
Beam diagnostics control for J-PARC LINAC Guobao SHEN J-PARC Center Japan Atomic Energy Agency Mar
Linac4 FBCT’s 18/ L4 BI BCT review Lars Søby On the behalf of: M. Andersen, D. Belohrad, L. Jensen, Franco Lenardon and J. C. Allica Santamaria.
Uli Raich CERN BE/BI Instrumentation for the new H - Source Test Bench Linac-4 Ion Source Review 2011 Uli Raich CERN BE/BI Linac 4 ion source review, CERN.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Linac-4 current situation and outlook U. Raich, F. Roncarolo, F. Zocca.
The Stripping Foil Test Stand in the Linac4 Transfer Line
K.Hanke – PS/SPS Days – 19/01/06 K.Hanke - PS/SPS Days 19/01/06 Recommissioning Linac2/PSB/ISOLDE from CCC  remote operation from CCC  upgrades & changes.
Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.
HIE-ISOLDE diagnostic boxes Esteban D. Cantero CERN BE-BI-PM HIE-ISOLDE meeting for BE/BI 28 March 2014 The research leading to these results has received.
Overview Consolidation projects for PS LIU-PS Main observable review Conclusion Acknowledgements S. Gilardoni R. Steerenberg G. Metral H. Damerau BI colleagues.
K.Hanke / TDR Meeting / 13 June 2006 Linac 4 Diagnostics L4: K. Hanke, M.Pasini (requirements, specifications, integration) AB/BI: U.Raich et al. (technical.
3 MeV test stand measurement plans A. Lombardi for the LINAC4 team 10/01/2013BCC MeV test stand measurements1.
3 MeV instrumentation commissioning U. Raich, Federico Roncarolo, F. Zocca Linac-4 Beam Coordination Committee CERN, 18.December 2013 Uli Raich.
Status of the AWAKE Control System Edda Gschwendtner, Janet Schmidt, Marine Gourber-Pace, Roman Gorbonosov, Peter Sherwood AWAKE Technical Board, 27 January.
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
CERN, 29.January 2009Uli Raich AB/BI 3 MeV instrumentation commissioning U. Raich Linac-4 Beam Coordination Committee
PSB MD C. Bracco, G.P. Di Giovanni. Outline Aim MD1: – Matching – Trajectories – Transmission MD2 – Matching – Trajectories – Transmission Next steps.
LINAC4 emittance measurements BI Day Divonne, 24 th November 11/24/2011 B.Cheymol, E. Bravin, D. Gerard, U. Raich, F. Roncarolo BE/BI 1.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
Linac4 BCC 14/10/2010 Linac4 Measurement and Dump Lines BCC on the Linac4 Transfer Line Status.
PXIE Beam Instrumentation Status Update Vic Scarpine Weekly PIP-II Meeting June 7, 2016.
G Bellodi - L4BCC meeting – 26/05/ /05/2011 G Bellodi - L4BCC - meeting BE/ABP Setting requirements & specifications Coordination (G Bellodi) OP.
23/06/2011 Linac4 BCC meeting. 23/06/2011 Linac4 BCC meeting Watchdog = Machine protection element whose function is to cut the beam if losses exceed.
PIP-II Beam Instrumentation Vic Scarpine PIP-II Machine Advisory Committee Meeting March 2016.
ESS Beam Diagnostics Overview Andreas Jansson / BI Group Beam Diagnostics Mini-workshop
V Review SPARC Diagnostic & Control Status G. Di Pirro On behalf control and diagnostic group.
ESS Front End diagnostic
3 MeV Measurements at Lianc4 1 Veliko Dimov (for the source and linac team) (J-B Lallement, J. Lettry, A. Lombardi, D. Fink)
High intensity electron beam and infrastructure Paolo Valente * INFN Roma * On behalf of the BTF and LINAC staff.
PS Complex Controls Renovation S Baird AB/ABP ATC/ABOC Days: Session Jan 2008.
High Intensity Neutrino Source HINS Linac Front-End R&D --- Systems Integration, Beam Diagnostics Needs, and Meson Lab Setup Bob Webber.
Beam Diagnostics for the FAIR Proton LINAC RFQ Workshop at GSI
RF acceleration and transverse damper systems
Update on BISW EYETS activities
Experience with beam instrumentation at Linac4
J.-L. Sanchez Alvarez(PSB-EIC)
Updated with comments 22 may 2017 Updated again 29 June 2017
402.5 MHz Debunching in the Ring
Accelerator layout > 1000 components (almost 300 magnets and power converters, 153 beam diagnostic devices, about 400m of vacuum pipes, a not neglectable.
LINAC4 50 MeV phase BIS STATUS
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
Instrumentation for SPS 2006 restart
AWAKE proposals for BE/BI
The ELENA BPM System. Status and Plans.
Status of the BI Work Package in the LIU-PSB frame
LINAC 4 source & LEBT measurement results
HALF SECTOR TEST: a test for the future PSB injection
Tango status at Elettra
WPs concerned by L4 connection:
LINAC4 LEBT beam size and emittance diagnostics
Linac 4 Devices Controls and Monitoring Status
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
Distributed BI Systems
LINAC4 commissioning plans etc.
Considerations on Beam Diagnostics Physics
HIE-ISOLDE contribution packages
commissioning and measurements
High Level applications development status
CLIC Feasibility Demonstration at CTF3
Linac Diagnostics Commissioning Experience
LCLS Control System Personnel Linac & BC2 Controls progress
ATS Consolidation Day 22nd May 2019 Beam Instrumentation
Status of the BI Work Package in the LIU-PSB frame
Presentation transcript:

BE-BI Software for LINAC4 Specifications List of BI Systems Not covered: PSB ring systems Conclusions Lars K. Jensen BI-SW

Functional specifications: “BEAM MEASUREMENTS FOR LINAC4 AND ITS TRANSFER LINES” EDMS Id: 1063849 (2010) LIST OF DIAGNOSTICS REQUIREMENTS (observables): POSITION, INTENSITY AND PHASE (from BPM) BEAM INTENSITY BEAM PROFILE & EMITTANCE BEAM LOSS BUNCH LENGTH BI software provide interfaces to these observables for client applications Important points: Re-use hardware/software as much as possible (software APIs from LINAC2/PSB systems) Use 3MeV test-stand for proto-typing Lars K. Jensen BI-SW

BI Systems Date of expected initial use (3MeV test-stand ++): Faraday-cup Emittance-meter SEM-grids BCT Beam Wire Scanner Beam Position Monitor Beam Loss Monitor BTV Bunch Shape Monitor Lars K. Jensen BI-SW

Faraday cup Scope: Present status: Plans: Test-stand + LINAC4 Acquired with local oscilloscope Plans: Implement time resolved (cross-calibrated) current readout for LINAC4 source installation (2013) Movement + High-voltage + ACQ to be specified Lars K. Jensen BI-SW

Emittance-meter Scope: Status: Plans: 3MeV test-stand Source re-commissioning Status: Time resolved beam profiles with HOR/VER slit control Acquisition and control implemented (FESA/Labview/C++) Plans: New slits (allowing for higher energies) by November 2011 RFQ tests early 2012 Minor low-level software changes with no/minimal changes for application Lars K. Jensen BI-SW

SEM-grids Scope: Status: Plans: 3MeV test-stand, LINAC4 (<30MeV) Acquisition and control for test-stand spectrometer SEM-Grids done (FESA/JAVA) Time resolved profiles (~6usec) Plans: Awaiting final layout decisions Acquisition/control hardware for final LINAC4 being designed (expected 2012) Test-stand beam tests during 2012 Lars K. Jensen BI-SW

BCTs Scope: Status: Plans: Test-stand, LINAC4, Transfer-lines (new, old) Status: Proof of principle for the acquisition electronics and software during 2011 Time resolved intensity measurements (@500 KHz) Total current & number of charges Plans: Debugging of acquisition electronics and software Final layout (number, type, position) Issue with very short beam pulses Intensity watch-dog (interlock) Functional specifications on-going (likely combination of hardware and software for added flexibility) Discussed June 2011 Lars K. Jensen BI-SW

Wire-scanners Scope: Status: Plans: Test-stand, LINAC4, new T.L. Hardware design being finalised Software to resemble slow ISOLDE scanners (fixed by end Q2 2011) Plans: Awaiting final layout decisions Beam tests foreseen early 2012 Lars K. Jensen BI-SW

BPMs Scope: Status: Plans: Test-stand, LINAC4, Transfer-lines Hardware design/production on-going HW issue with very short beam pulses Software will provide: Time resolved and averaged position values (HOR/VER) Phase with respect to the RF accelerating frequency Cross-calibrated beam intensity APIs by Q3 2011 Plans: Beam Tests 2012: 3 BPMs on test-stand Lars K. Jensen BI-SW

BLMs Scope: Status: Plans: Test-stand, LN4, Transfer-lines Hardware design (analogue/digital) on-going Interlocking spec’s to be finalized Plans: Lab tests during Q4 2011 Software design to start Q3 2011 Time resolved losses (2usec) Integral over 1msec APIs by early 2012 Lars K. Jensen BI-SW

BTVs Scope: Status: Plans: 3 devices in dump line 1 in new transfer-line (?) 3 new in LBE line 4 at PSB injection (stripper foil) Status: Reuse existing hardware and software Plans: Awaiting specification Lars K. Jensen BI-SW

Bunch Shape Scope: Status: Plans: Test-stand + LN4 Complete system built by JINR (Feshenko) Status: Will come with Labview software on PC for test-stand Plans: Integration into control system by 2013 Lars K. Jensen BI-SW

Conclusions Software design and delivery Operational systems follows test-stand schedule and hardware availability Operational systems deployed and tested when front-end computers become available Standing agreement with OP provide APIs ASAP for discussion 3MeV test-stand Very important for proto-typing Decisions Layout must be fixed soon (mainly hardware issue) Some specifications missing Lars K. Jensen BI-SW