Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
Advertisements

Flavio Dal Corso - INFN Padova1 OPERA coll. meeting - Hamburg 3 July 2004 RPC & XPC Electronics Status Front End Boards (FEBs) Controllers HV system Crates.
Saverio MINUTOLITIG meeting, 10 February Report on T1 installation activities and achievements made during this shutdown.
Saverio MINUTOLITOTEM T1 Readiness Review, 30 November Readiness Report on T1 Electrical Systems and Electronics.
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
Saverio Minutoli INFN Genova 1 T1 Electronic status Electronic items involved: Anode Front End Card Cathode Front End Card Read-Out Control card Slow Control.
Global Trigger H. Bergauer, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J. Strauss,
Emulator System for OTMB Firmware Development for Post-LS1 and Beyond Aysen Tatarinov Texas A&M University US CMS Endcap Muon Collaboration Meeting October.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
M. Lo Vetere 1,2, S. Minutoli 1, E. Robutti 1 1 I.N.F.N Genova, via Dodecaneso, GENOVA (Italy); 2 University of GENOVA (Italy) The TOTEM T1.
25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
DVCS-2 Assembly & Installation Charles Hyde DVCS Collaboration Meeting 18 December 2009 Clermont-Ferrand.
Gueorgui ANTCHEVPrague 3-7 September The TOTEM Front End Driver, its Components and Applications in the TOTEM Experiment G. Antchev a, b, P. Aspell.
Global Trigger H. Bergauer, Ch. Deldicque, J. Erö, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H.
CSC Endcap Muon Port Card and Muon Sorter Status Mikhail Matveev Rice University.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
Status of NA62 straw electronics Webs Covers Services Readout.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
Walter Snoeys – CERN – PH – ESE – ME –TOTEM October 2009 TOTEM Electronics Status.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
Gueorgui ANTCHEV PH-TOT TOTEM Collaboration Meeting – March TOTEM System in H8 - Overview, Block Diagram and Main Characteristics Applications -
Saverio MINUTOLITOTEM Electronics W.G., 9 December T1 electronics status.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Walter Snoeys – CERN – PH – ESE – ME –TOTEM June 2008 Electronics WG Report TOTEM Electronics’ Status.
ELENA installation progress F. Butin / ELENA collaboration.
Wiener crates; An installation and power supply analysis. Magnus Bjork Be/Co/Fe
Novosibirsk, September, 2017
University of Wisconsin
TOTEM Electronics Status
LKr status R. Fantechi.
FTK infrastructure in USA15 Status and plans for 2015 A
Calorimeter Mu2e Development electronics Front-end Review
Production Firmware - status Components TOTFED - status
T1 status (a selection from EDR presentations)
Meeting at CERN March 2011.
Mini-drawers, FE-ASIC , Integrator
PMT cabling Gian Luca Raselli INFN Pavia
same for both sectors 45 and 56
Front-end digital Status
Front-end electronic system for large area photomultipliers readout
Pierluigi Paolucci - I.N.F.N. Naples
Pierluigi Paolucci - I.N.F.N. Naples
The digital read-out for the CSC system of the TOTEM experiment at LHC
TMB, RAT, and ALCT Status Report
RPC HV&LV status Introduction HV power supply tender
Overview of T1 detector T1 is composed by 2 arms
New Calorimeter Trigger Receiver Card (U. Wisconsin)
The electronics system of the TOTEM T1 telescope
The digital read-out for the CSC system of the experiment TOTEM at LHC
The digital read-out for the CSC system of the TOTEM experiment at LHC
RPC FEE The discriminator boards TDC boards Cost schedule.
Pierluigi Paolucci & Giovanni Polese
19-April-05 Peripheral Crate Testing, Installation, and Commissioning PC I&C Feb ’06 EMU Fred Borcherding 16-May-19 PC I&C Feb'06.
DAQ for SBS GEM SBS collaboration meeting August 6th 2019
Presentation transcript:

T1 Electronic status Conclusions Electronics Cards: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT hybrids T1 Trigger Mezzanine Other development: 16chs preamplifier. Cabling and Power Supplies: Platform to T1 cabling High Voltage Low Voltage Patch panels Conclusions CERN Collab. Meeting 3 - 6 Dec. 2007

Electronics Cards

AFEC VFAT hybrid input ground isolation new feature. 5 pieces of 1P and 5G already produced. Waiting for the components loading. Mass production launched. PCBs ready within Dec. 2007. Decision on passive components networks within ½ Jan. 08 Components mounting within ½ Feb.08 End tests, validation and CSCs soldering March 08

CFEC (1) Decision on passive components networks within end Jan. 08 Final layout routing in progress. Ten PCBs ready ½ Jan. 08 PCBs mounted within end Jan. 08 Decision on passive components networks within end Jan. 08 Mass production ready within ½ Feb.08 End tests and validation March 08.

CFEC (2) Upgrade to high resolution. New layout Feb. 08 Few prototypes ready March 08. End tests and validation April 08. Mass production frozen.

ROC (1) Some delays due to CERN custom components procurement. Needed to avoid wrong components packages association. Several features implemented: DOHM and CCUM emulation. DOHM I2C lines handling (follow the CCUM-SCR redundancy scheme). Trigger VFAT Mezzanine GOHs mezzanines input pattern generator. Several Data GOH DAV sources available. Several Trigger GOHs DAV sources (BC0, Static, Timed by CCUM) Foreseen a SPY Mezzanine based on T1 Digital Mezzanine. The layout is done. 5 PCB ready Dec.07 3 Circuits mounted and (fully??) tested Jan.08 PCBs mass production Feb. 08 Full ROCs ready within March 08.

ROC (2)

ROC (3) TRIGGER DAV DATA DAV I/O CCUM Has been tested ??? BC0b TR_GOH_DAV TRIGGER DAV MUX IDLEb/ON I/O CCUM I/O CCUM A CSC1 MUX DATA DAV K DATA_GOH_DAV K MUX A CSC2 MUX K

VFAT hybrids The installation of 1 arm (30 CSCs) involve 200 VFAT hybrids. This number is equivalent to the full T1 anode VFATS hybrids production including spares. In this installation 60 will be dedicates for the anodes and 80 for the cathodes (CFEC VFAT only based). Hybrids production (PCBs and components mounting) at CERN. 200 VFAT hybrids production must end Feb. 08 (Ruy). Bonding may be made in Genoa. Needs agreement with the people in Genoa lab. Needs to know all the rules and material used by the CERN bonding lab. Needs some VFAT dummy chips in order to test all the procedures. Could be useful a training period at CERN of our bonding technician. Validation of the first hybrids in agreement with the CERN people (W.S.- P.A.). Hybrids bonding and test time schedule TTP dependent.

T1 Trigger Mezzanine T1 detector have 15 trigger fibers per each ¼ while each OptoRx mezzanine accept up to 12 fibers. In order to merge and manipulate with a dedicate algorithm all the trigger bits (30 fibers in total), we will need the custom TTM mezzanine to add to the Trigger TOT-FED. The trigger system is not completely fixed, need some more iterations within the trigger group. TTM not needed at the beginning (March 08). Expected to be available in June 08.

16 channels preamplifier (1) This small boards use the same FE preamplifier device integrated inside the VFAT chip (see Jan Kaplon). Needed for final studies on T1 CSC detector. PCBs ready. Components mounting 3rd w/Dec.07

16 channels preamplifier (2) TOP BOTTOM

Cabling and Power Supplies

OLD Section

Platform to 6th T1 Frame cable tray NEW Section Who is responsible for this cables ?? (Putting in work and purchase)

Platform Service Racks

Low Voltage and High Voltage components. Placed order at CERN for WIENER MARATON low voltages system. Two simple VME crates are also purchased for the MARATON remote control cards. Delivery expected within March 2008 T2 spares as back-up solution in case of longer delay Placed an order to CAEN for HV modules A1550P, and one mainframe SY1527. Delivery expected March/April 2008.

Patch panels Hosted on the platform racks: High Voltage  to be done, but ok for March 08. Connectors procurement done. Hosted on the 6th T1 Frame: Low voltage  prototype almost ready, ok March 08. High Voltage  all boxes made, one cabled prototype almost ready, ok March 08. Optic fiber  to be done, need a fiber cable fan-out and MPO connector for the dimensioning of the box (see W.S.).

Christmas wish list. Dear Santa: In order to debug the ROC optic sections and the slow control ring we need a dedicated DAQ (H8 style) system for us either in Genova or in Bld188 already now. We need a user friendly TTP based test-setup beginning Feb. 08 to do and test hybrid bonding. Need a DAQ system able to test all the ROC features towards end of Jan.08 .