1 Connect pumping equipment (group) with leak detector to insulation vacuum 1 or 2 pumping groups? connected to SB or CM or both? Which pumping group?

Slides:



Advertisements
Similar presentations
Hydrogen Pre-Operation Safety Review 4 th October 2011 Hydrogen R&D System Operational Procedures and Test Plan M Courthold.
Advertisements

PRESSURE TEST Hook tester up to tank inlet line. Pump tester up to 10psi (.7 bar) The line and carb should hold pressure for 1-min. Checks for leaks at.
Sputter Stand Safety Specifics Electrical Hazards High Voltage : Electrical power is required for the high voltage supply, gauging, system controller and.
31/03/11FV 1 CEDAR from flammable gas safety point of view.
Water supply and drafting. Objectives Understand and be able to demonstrate the different hydrant lays and hook ups Explain/demonstrate how to operate.
"AIR COOLER" Heat Exchanger
Suction Pumps.
Progress and Plan for Superconducting RF Cavity RF Group.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
Vacuum, Surfaces & Coatings Group Technology Department Vacuum tests for CLIC module prototypes 6 November 2013 C. Garion2 Outline: Reminder: specification.
The MICE vacuum system Presented by Mark Tucker at CM-39, 26 June 2014.
“Fix Tube Sheet” Heat Exchanger
PIMS IN INSTITUTE FOR NUCLEAR STUDIES Brazing Andrzej Soltan Institute for Nuclear Studies.
CM1 Thermal Cycle CM1 Warmup –1/4/12 (Wed.) to 1/6/12 (Fri.) (~50 hours) –Verified turbo interlock system works CM1 Cooldown –Began 1/9/12 (Monday) –At.
05 Novembre 2003Chamonix XIV Workshop, January How to deal with leaks in the QRL and magnet insulation vacuum Paul Cruikshank for AT/VAC Germana.
Exhaust to atmosphere G1 V1 V2 V3 LN2 Storage Vessel 150 l Dewar Cryostat Exhaust to atmosphere Nitrogen or helium gas bottle LN2 Circuit for MIT Test,
The Operation of the Tevatron Vacuum system Authors David Augustine Alex Chen Scott McCormick 1.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
National Ignition Facility Vacuum Systems Presentation to OLAV Workshop, ORNL July 11-14, 2011 NIF Vacuum Subsystems Managers Igor Maslennikov* John Hitchcock.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Hydrogen Control System MJD Courthold TW Bradshaw Y Ivanyushenkov D Baynham.
Installation of the T600 at Fermilab CSN2, September 22,
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
CMS Double Chooz HESS Edelweiss Herschel ALICE Detecting radiations from the Universe. EXPERIENCE WITH VACUUM SYSTEM FROM DESY AND CEA SOLUTIONS TTC topical.
Page 1 CRYOMODULE 650 (TESLA Style) Stand Alone Tom Peterson and Yuriy Orlov Collaboration Meeting 25 Jan 2011.
Hao Guo LINAC Department Institute of Modern Physics.
Cryomodule Assembly Facility Fermilab Cleanroom: Assembly/Disassembly Tools Tug Arkan 1.
1 MICE Hydrogen system Working group mtg – 01/09/14.
Warm Girder UHV Components John Heckman Anthony DiPette Vacuum Group 2/29/2016.
Overview of the ESS Linac Cryogenic Distribution System
Overview of elliptical cryomodules vacuum system Vacuum Equipment Standardization meeting February 2014 P. Bosland – C. Darve – N. Elias.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
Vacuum Related Procedures and Tools of IHEP ILC Test Cryomodule Assembly Jiyuan Zhai (IHEP) TTC Topical Workshop on SRF Cryomodule Clean Room Assembly.
1 IPN Orsay / Division Accélérateurs The Spoke cryomodule Vacuum aspects P. DUTHIL on behalf of the IPNO team ESS Lund February 19 th 2013.
Installation of the T600 at Fermilab Fermilab, February 15,
Paolo Michelato, July 19-22, 2006 Global Design Effort 1 Vacuum system segmentation Cold vacuum system segmentation reflects the cryogenic structure of.
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe 3/7/
Installation of the T600 at Fermilab
Cryomdoule Test Stand.
Cryomodule test stand at ESS site
14 Refrigerant Recovery, Recycling, and Recharging.
IT-4189 Supply and installation of a cryogenic distribution system
NL12 Girder Removal and Reinstallation
protoDUNE – single-phase Instrumentation - Gas Analyzers
DESY Experiences on Use of Gas overlay during Assemblies
Proximity Cryogenics P&IDs meeting
Leak Detection Tutorial Work
SPS cryogenic proximity equipment and SM18 validation
LARP Vertical Test Facility
Mathieu, Gabriel, Max, Spyros, Guillaume
EVAPORATIVE EMISSION CONTROL SYSTEMS
Definition of work flow for string DESY Example on critical operation
Martin Dommach TDR ART Review, Hamburg, September 14, 2012
LN2 Circuit for MIT Test, September 2005
Freeze-Pump Thaw for degassing
IMP Cryomodule Assembly and Alignment
INSTITUTE OF HIGH ENERGY PHYSICS
ESS elliptical cryomodule
Overarching Commissioning Plan
SAFETY, TOOLS & EQUIPMENT, SHOP PRACTICES
SNS PPU Cryomodule Instrumentation
Cryomodule Assembly Plan
LEBT water cooling system
Cryogenics – The Basics
SNS PPU Cryomodule Instrumentation
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

1 Connect pumping equipment (group) with leak detector to insulation vacuum 1 or 2 pumping groups? connected to SB or CM or both? Which pumping group? Size of the primary (for slow pumpdown a small primary can suffice). Who (which system, CRG or VSC?) measures the readout of the CM Pennings? 2 Connect (mobile, or fixed turbo) pumping equipment with leak detector to beam vacuum valve Slow pumpdown (or small primary), clean pumping group for clean room standard. What turbo pump for the tunnel? what gate valve, all metal or Viton sealed? What primary model and pumping speed? 3 Pumpdown/ purge insulation vacuum (this part is out of the responsability of VSC, for establishing procedure and carrying out. Can VSC do it with our definition and equipment (nitrogen bottle filter)? Dry nitrogen bottle – equipped with water filter; pump down slowly not to stress MLI – it is sufficient to use the primary pump alone for this, if it is a small one. Leave under nitrogen for 30min before pumping again. 4 Leak detection air to insulation vacuum Connect leak detector to exhaust of turbopump. Check background and note. Spray helium from top to bottom of cryomodule. Apply procedure EDMS  1318157 and tutorial We can check here all ports, to ensure no damage was introduced by transport. VSC? who else? 5 Force beam vacuum plug-in valves open, while string is under atmospheric pressure of dry nitrogen Check pressure on the string with the 2 Pennings on the FPC? With nitrogen from a bottle with filtered outlet (Millipore filter, clean room standard), rinse the connecting pipework (and BPM pumping module) repeatedly. Check final pressure and leave at slightly sub-atmospheric pressure? Or check pressure difference using the FPC Pennings? Open plug-in valves. 6 Pumpdown beam vacuum Slow pumpdown; for this, a slow pumpdown pumping group is required; a small primary is sufficient to ensure slow pumpdown. Do not leave on limit pressure with the group pumping on beam vacuum. How do we ensure this? Which gauge is used in SM18, which one in the tunnel (Penning on VMCCP)? 7 Leak detection air to beam vacuum Connect leak detector to the exhaust of the turbo-pump. Spray helium to the external connections to vacuum equipment.

8 Purge cryogenic lines (CRG) Purge repeatedly (how many times are needed?) the cryogenic lines with dry nitrogen gas. Always leave 30min under nitrogen atmosphere between one purge and the next 9 Introduce helium gas in the cryogenic circuits, up to 1.8 barg (to be defined by L.Dassa tomorrow) (CRG) Introduce dry helium from a bottle (filled at the refrigerator if possible) in the cryogenic circuits (from which port?), up to the pressure specified with safety for the pressure test. 10 Leak detection insulation vacuum to helium Check helium signal on leak detector on insulation vacuum 11 Leak detection beam vacuum to helium Check helium signal on leak detector on beam vacuum 12 Helium gas or Argon gas in insulation vacuum? Normally not, if string was tested before closure of the cryomodule, but this should be verified with the help of VSC and CRG experts. If this leak test is required, do we need to do it with argon – and the RGA?