HCAL M&O-B Budget CMS Finance Board

Slides:



Advertisements
Similar presentations
Prototype sPHENIX Calorimeters
Advertisements

Preparing for the CD-2 Review Elton Smith Hall D Collaboration Meeting October 12-14, 2006.
12-Jan-2009 / S.KunoriCMS HCAL / JTerm31 CMS HCAL - Hadron Calorimeter - Shuichi Kunori U. of Maryland 12-Jan-2009.
ATLAS Tile Calorimeter Performance Henric Wilkens (CERN), on behalf of the ATLAS collaboration.
CMS Hadronic Forward Calorimeter Restoration of Functionality Iowa, BU, FNAL severe descoping of HF in 2002 $$ for HB, tracker tail catcher for late developing.
CMS Outer Hadron Calorimeter (HO) Project Naba K Mondal Tata Institute, Mumbai, India.
Upgrading the CMS simulation and reconstruction David J Lange LLNL April CHEP 2015D. Lange.
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
We observe two classes of anomalous signals in HCAL 2) Cherenkov light produced by interactions in the window of the Forward Calorimeter PMTs ¼ photoelectrons.
US CMS Phase 2 R&D Discussion 30-July-2013 “Phase 2 muon R&D” J. Hauser, UCLA  Add redundancy (power) to trigger where most needed  First and innermost.
1 Tianchi Zhao University of Washington Concept of an Active Absorber Calorimeter A Summary of LCRD 2006 Proposal A Calorimeter Based on Scintillator and.
The CMS Upgrade Program ECFA High Luminosity LHC Experiments Workshop Aix-les-Bains, October 1, 2013 J. Spalding, on behalf of the CMS Collaboration 1.
Status of EIC Calorimeter R&D at BNL EIC Detector R&D Committee Meeting January 13, 2014 S.Boose, J.Haggerty, E.Kistenev, E,Mannel, S.Stoll, C.Woody PHENIX.
Hadron Calorimeter Readout Electronics Calibration, Hadron Calorimeter Scintillator Upgrade, and Missing Transverse Momentum Resolution due to Pileup Zishuo.
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
Proposal for participation in Si-PM testing and Upgrade work HEP Group Department of Physics Panjab University Chandigarh M. India-CMS meeting,
R&D on W-SciFi Calorimeters for EIC at Brookhaven E.Kistenev, S.Stoll, A.Sukhanov, C.Woody PHENIX Group E.Aschenauer and S.Fazio Spin and EIC Group Physics.
Scintillation hodoscope with SiPM readout for the CLAS detector S. Stepanyan (JLAB) IEEE conference, Dresden, October 21, 2008.
The Tungsten-Scintillating Fiber Accordion Electromagnetic Calorimeter for the sPHENIX Detector Craig Woody, for the PHENIX Collaboration Physics Department,
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
Upgrade of the CMS hadron outer calorimeter with SiPM’s
A. Gibson, Toronto; Villa Olmo 2009; ATLAS LAr Commissioning October 5, 2009 Commissioning of the ATLAS Liquid Argon Calorimeter Adam Gibson University.
CMS Calorimeter HB- HB+ HE- HE+ HF- HF+ HO-2 HO-1 HO0 HO+1 HO+2
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
08-June-2006 / Mayda M. VelascoCALOR Chicago1 Initial Calibration for the CMS Hadronic Calorimeter Barrel Mayda M. Velasco Northwestern University.
ATLAS Working Group Report IHEP, Beijing Nanjing Univ, Nanjing Shandong Univ, Jinan USTC, Hefei.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
Andris Skuja :: January 2012 Kolkata-Mumbai Workshop Overview1 H C A L Kolkata-Mumbai HCAL Upgrade Workshop Overview of HCAL Upgrade Workshop Andris Skuja.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
SiPM Readback Noise Tagging & HCAL Calibration Dayton Thorpe July 8, 2010.
1 Zero Degree Calorimetry for CMS Had EM e +,  - Michael Murray for CMS.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
H C A L 11 th International Conference on Advanced Technology and Particle Physics Villa Olmo (Como - Italy), October 5 - 9, 2009 THE PERFORMANCE OF THE.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
Geant4 Tutorial, Oct28 th 2003V. Daniel Elvira Geant4 Simulation of the CMS 2002 Hcal Test Beam V. Daniel Elvira Geant4 Tutorial.
BASIC SKETCH OF ACTIVITIES FOR THE CERN LHCB-RICH TEAM (2012 – 2017) Team composition Present activities and consolidation plans RICH – CERN R&D and Upgrade.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
July 27, 2002CMS Heavy Ions Bolek Wyslouch1 Heavy Ion Physics with the CMS Experiment at the Large Hadron Collider Bolek Wyslouch MIT for the CMS Collaboration.
Argonne’s Rôle in ZEUS José Repond Argonne National Laboratory DOE Visit, Germantown, March 11 th, 2004.
1 Plannar Active Absorber Calorimeter Adam Para, Niki Saoulidou, Hans Wenzel, Shin-Shan Yu Fermialb Tianchi Zhao University of Washington ACFA Meeting.
Eija Tuominen, coordinatorHIP/UH Detector Laboratory, October 2010 DETECTOR DEVELOPMENT at HELSINKI DETECTOR LABORATORY Detector Laboratory is a joint.
June 2, 2008 Bill Wisniewski1 BaBar Disassembly and Disposal Overview.
CMS ROC Report Patricia McBride May 26, 2005.
JRA3 Institute of Physics ASCR Prague
Roberto Calabrese Ferrara University and INFN
SiD R&D Plan and Opportunities for New Collaborators
LHC Science Goals & Objectives
Experimental Method: 2 independent detectors on both sides of IP
Scintillation Detectors in High Energy Physics
EURONu Collaboration Board,
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
Felix Sefkow DESY LDC at Vienna November 17, 2005
Financing of LHC projects and CMS
The ATLAS Zero Degree Calorimeter Brookhaven National Laboratory, USA
ATLAS M&O General Comments
Gamma-ray Large Area Space Telescope ACD Final Performance
Gamma-ray Large Area Space Telescope
PEDESTAL STABILITY OF HCAL DURING GLOBAL RUNS AND 2009 CASTOR DQM ANALYSIS Emine GÜRPINAR Cukurova University 7/31/2018.
Status of Ecal(s) for ILD
CLIC detector at SiD meeting 28/3/2010
CMS High Granularity Calorimeter (HGCAL) Beam H2 2017
(My personal) CALICE Report
HE Calorimeter Upgrade Studies
The Compact Muon Solenoid Detector
HE Calorimeter Upgrade Studies
Present coverage Possible upgrade projects Slogan: Q C D HERA for LHC
State-of-the-art in Hadronic Calorimetry for the Lepton Collider
Vishnu V. Zutshi For the NICADD team.
Reports for highly granular hadron calorimeter using software compensation techniques Bing Liu SJTU February 25, 2019.
Experimental Method: 2 independent detectors on both sides of IP
Presentation transcript:

HCAL M&O-B Budget CMS Finance Board Julie Whitmore HCAL Resource Manager 28 May, 2013

CMS Hadron Calorimeter Barrel and Endcap (HB/HE): Sampling scintillator/brass calorimeter Readout: Hybrid Photodetector (HPD), operating inside 3.8T magnet Forward (HF) : Cherenkov light from scintillating quartz fiber in steel absorber is read out with conventional PMT Outer (HO): Tail catcher with one (two in ring-0) scintillator layers and HPD readout Outside of the solenoid CASTOR: Tungsten-quartz plate Cerenkov calorimeter just beyond HF with PMT readout ZDC: Tungsten plate/quartz fiber ribbon stack 140 m from the IP

Hadron Calorimeter Barrel (HB), Endcap (HE), Outer (HO) Scintillating tile, wave shifting fiber, HPD transducer HO HPDs produce large noise pulses in the stray return field of the CMS solenoid and are being replaced with SiPMs, a technology that did not exist during construction Forward (HF) Steel-quartz fibers read out by PMTs HF PMTs produce large pulses due to MIPs interacting with glass in PMT. PMTs are being replaced by thin window/metal can quad-anode PMTs CASTOR Quartz-tungsten plate sampling calorimeter CASTOR PMTs will be replaced with rad hard PMTs for long term operation (original CASTOR PMTs needed to be replaced due to unexpectedly large fringe field) Zero Degree Calorimeter (ZDC) (mainly DOE nuclear support) Sampling calorimeter consisting of tungsten plate/quartz fiber ribbon stack Facilities H2 test beam, 5 electronics test stands, HO and HF test stands at P5

HCAL Scope of Work HO Improvement HPD SiPM LS1 HCAL Operations in increasing luminosity is challenging Need to be vigilant in data monitoring DQM, Calibration, Better simulations, Software reconstruction improvements Need to deal with challenges to detector robustness Firmware updates, Data recovery, Hardware failure workarounds LS1 Repairs + Improvements Installation & Commissioning 1) HF PMT replacement 2) HO HPD replacement 3) CCM board refurbishment, 4) DSS improvements, 5) General repairs Limited resources to support multiple fronts Operations/LS1/Upgrades HF Improvement LS1

HCAL M&O-B HCAL Base M&O-B provides for the following: Maintenance and operations of HB, HE, HO, HF, CASTOR, ZDC, H2 test beam and various test stands LS1 repairs/improvements HCAL has existed with a you build it/you maintain it model Groups joining HCAL after completion of construction assume a proportionate share of M&O-B and ESP effort At present, there is no cash M&O-B fund. One exception is HCAL Upgrade TDR printing, charged to Upgrade Institutes only. Cost sharing determined by number of PhD physicists In the future, a small “M&O-B-like” common fund will exist Small fund (<25 kCHF) for shared expenses such as safety equipment, etc. Credit will be given and reported as M&O-B contribution. All HCAL M&O-B is the in-kind contributions of the collaborating institutions/funding agencies.

Expenditure Report HCAL 2012 M&O-B expenditures report HCAL experienced stable operations in 2012 with over 99% good channels, with calibration and noise suppression well optimized. Excellent understanding of MET in data and simulation was achieved. All participating funding agencies contributed to these activities. HCAL expenditures in 2012 were consistent with the proposed budget, with the largest expenditure being for hired manpower at CERN. Expenditures increased in preparation for the LS1 activities. In addition to detector operations, manpower at CERN increased to accommodate testing activities needed to prepare equipment (CCMs, HO Silicon PMTs (SiPMs), and HF PMTs) for LS1 installation. Largest material expenditures were from 1) refurbishment of the CCM (credited to 2014), 2) HF multi-anode PMT baseboards and socket fabrication, 3) infrastructure improvements needed to establish test stands/areas at CERN, 4) spare supplies in preparation for LS1.

HCAL 2014 M&O-B Manpower at CERN includes 3.05 FTE institute technical manpower plus 6.25 FTE hired manpower at CERN M&O-B credit given for CCM refurbishment and for common expenditures (TDR printing) Significant ESP effort from all collaborators not included in M&O-B

M&O-B 2014-17 Projections Budget for 2014 includes costs for increased manpower needed for LS1 and unforeseen 2013 expenditures for projects in 2013 (e.g. CCM repairs.) 2015-17 levels are expected to decrease to pre-LS1 preparation levels