St. Louis District Biological Opinion RRAT

Slides:



Advertisements
Similar presentations
Salem Winter Island Master Plan The Cecil Group FXM Associates Susan St. Pierre Bio Engineering PAL Winter Island Park Public Meeting #2 Salem, Massachusetts.
Advertisements

Environmental Organizations Web Presence created by Wilson and Kastenmayer §Alabama Environmental Network §Cahaba River Society §Cahaba River Coalition.
UMR = Balance of Environment and Transportation 1. Pool # 8 - Environmental Management Project 2. Transportation Route – human habitation & settlement.
US Army Corps of Engineers Philadelphia District Scheduled FY 07 Dredging Work FY 07 Dredging Workin Philadelphia District Philadelphia District.
US Army Corps of Engineers Portland District Fiscal Year 2007 NWP Dredging Plan Including: The Columbia River Channel Improvement Project (CRCI)
TAMPA HARBOR CONSTRUCTION PROJECTS, Big Bend Channel Alafia River Channel Port Sutton Channel TAMPA HARBOR CONSTRUCTION PROJECTS, Big Bend Channel Alafia.
US Army Corps of Engineers BUILDING STRONG ® RIVER RESOURCES ACTION TEAM BOAT TRIP Upper Mississippi River (Pools 24, 25, and Mel Price) St. Louis District.
Clean Water Act, 33 USC 1251(a) The objective of this chapter is to restore and maintain the chemical, physical, and biological integrity of the Nation’s.
US Army Corps of Engineers BUILDING STRONG ® Engineering With Nature: Sustainable, Multi-benefit Projects Thomas J Fredette, PhD and Michelle Bourne Environmental.
RRAT – Dredging Update  Gilbert Island Post Construction  Flex Pipe Update  Flex Pipe use  2014 Dredging Update  Dredge Master Plan.
US Army Corps of Engineers BUILDING STRONG ® St. Louis District Dredging Lance Engle Dredging Project Manager St. Louis District WEDA – Midwest 2012.
SLRIDT Site Background SLRIDT Site Remediation Activities ( ) 2010 Tallas Island Winter Dredging  Options  Pros/Cons  Winter Dredging Activities.
Civil Works Baltimore District River and Harbor Projects.
JACKSONVILLE DISTRICT FY08 DREDGING SCHEDULE JACKSONVILLE DISTRICT FY08 DREDGING SCHEDULE NAD/SAD REGIONAL DREDGING MEETING/WEDA NAD/SAD REGIONAL DREDGING.
PHILADELPHIA DISTRICT 2008 – 2012 DREDGING PROGRAM.
Anadromous Fish Run Site Selection Tool An Example Application: Identifying Restoration Projects for Community-Based Efforts.
BUILDING STRONG ® 1 Savannah District AIWA Meeting November 2011.
Phase Difference = Phase Difference = 0.05.
NAD/SAD REGIONAL DREDGING MEETING/WEDA WILMINGTON DISTRICT
Marine Environmental & Construction Project Management Projects on time and within budget.
October FY08-FY12 Dredging Schedule New York District 1st Qtr FY08 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr FY09FY10 1st Qtr 2nd.
A Review of Some Grant-Funded Watershed Projects in Central Illinois: Part II Illinois Lake Management Association Grant Opportunities and Funding Options.
Game Designed By C. Harr-MAIT THIS IS With Host... Your.
The Future of Sludge Disposal: A Fresh Perspective after Sandy Jim Meehan – Executive Director Rahway Valley Sewerage Authority.
US Army Corps of Engineers BUILDING STRONG ® U.S. Army Corps of Engineers St. Paul District Channels & Harbors Project Presentation for 2012 WEDA Midwest.
Where the Missouri River Meets the Mississippi River Edward "Ted" and Pat Jones-Confluence Point State Park.
This certificate is awarded to _____________________ on this 31 st day of May, _____________________.
Northern Integrated Supply Project NSPE-Colorado State Meeting February 2010.
OP-Navigation.ppt1 U.S Army Corps of Engineers Savannah District.
Southwest Florida Water Management District Association of State Floodplain Managers Orlando, Florida June 9, 2009.
Spill Related Planning Efforts September 15, 2010 Kyle Graham Governor’s Office Coastal Activities.
Natural Channel Design Based Restoration & Enhancement Final BMP for Urban and Suburban Streams.
Project Update: Hudson River PCBs Superfund Site October 24, 2012 Mr. David King, PE – USEPA Region 2 Mr. Gary Klawinski – USEPA Region 2 Mr. Mark Surette.
Implementing the Master Plan Kyle Graham Deputy Executive Director CPRA June 20, 2012 committed to our coast.
Pine Mountain Lake Dredging Project Moffatt & Nichol Project Engineers Cooper Crane & Rigging, Inc. Contractor The Right Contractor Adaptability Communication.
Photo point 2 1 / 2 miles Trees ● Challenges to Restoring 4,400-acre Skaggs Island to tidal marsh: The site is subsided ~6 - 8 feet on average >
BUILDING STRONG ® Rock Removal on the Middle Mississippi River 1 RRAT 2014.
Everglades Protection Area Tributary Basins February 23, 2005 Second Annual Public Meeting on Implementation Progress.
Pam Jeane Deputy Chief Engineer- Operations Sonoma County Water Agency Habitat Enhancement and Water Delivery.
Lower L’Anguille Watershed Cost Share – Phase III Patricia Perry, St. Francis County Conservation District.
SMALL BUSINESS OPPORTUNITY FORUM Water Department 2015 Capital Program & 2016 Outlook.
Hoover Dam Southwest Landform Example Michelle Klepper.
BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District November 29 th, 2012.
Upper St. Johns River Basin Project US Army Corps of Engineers A joint project between the St. Johns River Water Management District and the Jacksonville.
Located at the intersection of Interstate 70 and Goodfellow Blvd. on the City’s northwest side SLAAP St. Louis Army Ammunition Plant.
OPS 571 Complete Class - NO FINAL OPS 571 Operations Management To purchase this material click below link 571/OPS-571-Complete-Class-Guide.
Supplier Diversity Program
TVA Kingston Ash Recovery Project Roane County, TN
Hung Shiu Fung, Thomas Fischer
Water Reclamation Plant Feasibility Study Update May 28, 2014
Phase 1 & Phase 2 Grant Projects
Integrated Channel Maintenance Planning in the Lower Columbia River Innovating Dredged Material Management Planning to incorporate Regional Sediment.
The UK Tier 1 Entrepreneur Visa and the UK Representative of Overseas Business Visa - SmartMove2UK
ChE 473K Plant Design R. Bruce Eldridge.
The Florida Inland Navigation District:
TECHjOSH.COM TechJosh.com.
Taum Sauk Dam Failure Missouri, 2005
Water Reclamation Plant Feasibility Study Update
Beneficial Use of Dredged Material
Messages for the International Day for Biological Diversity 2013
Ten Tribes Partnership Tribal Water Study
PPL1.6 Pumping Plant Project Overview
21st Annual.
RM 2 7 +RM 2 4 RM 7 3 +RM 1 6 RM 5 2 +RM 2 4 RM 1 3 +RM5 2.
Memphis District PROCUREMENT OPPORTUNITIES
St. Marys Intracoastal Gateway.
St. Paul District Presentation by: LTC Kendall Bergmann
April 13, 2019.
Design and Engineering Services
Sacramento Environmental Commission January 2019.
Presentation transcript:

St. Louis District Biological Opinion RRAT Introduce self. Thank you for the opportunity to talk to you today about Low Water Reference Plane.

FY 14 RRAT– Biological Opinion SCED – 3 phases of construction, final phase awarded in FY14. First two phases complete Increase flow down Establishment Chute RM 132 FY13 efforts include flexible Dredge Pipe – Manskers RM 104 Created an ephemeral island with 400,000 cy of dredge material Identifying FY14 sites for island development FY14 efforts were not executed due to high water

Bi-Op Flexible Dredge Pipe and Spill Barge River Mile 221 2,400 feet of flexible dredge pipe purchased in early 2000’s Flexible dredge spill barge “Thomas George” completed in FY14 Create ephemeral islands with dredge spoil to enhance environmental diversity River Mile 270