GLAST Large Area Telescope

Slides:



Advertisements
Similar presentations
Presented by Thabo Letopa
Advertisements

Electronic marking of students assignments Carlton Wood 5 th July 2013.
Slide 1 of 10 Job Event Basics A Job Event is the name for the collection of components that comprise a scheduled job. On the iSeries a the available Job.
First Article Inspection Report
GLAST LAT Project CCB Review – June 28 th, 2005 GLAST LAT I&T Online A.T.Kavelaars 1 GLAST Large Area Telescope: I&T CCB Review June 28 th, 2005 E-Logbook.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Project LAT System Engineering 1 Test Definition Planning Pat Hascall SLAC System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project CCB Review – June 2 nd, 2005 GLAST LAT I&T Online A.T.Kavelaars 1 GLAST Large Area Telescope: I&T CCB Review June 2 nd, 2005 E-Logbook.
GLAST LAT Project June 6, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall.
GLAST LAT Project CCB Review – May 17 th, 2005 GLAST LAT I&T Online A.T.Kavelaars 1 GLAST Large Area Telescope: I&T CCB Review May 17 st, 2005 E-Logbook.
GLAST LAT Project Aug 1, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems.
GLAST LAT Project Oct 5, GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems Engineering.
GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review LAT Test Verification Process Presentation 4 of 12 GLAST Large Area Telescope Gamma-ray Large.
GLAST LAT Project28 March 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review LAT Requirement Verification Presentation 5 of 12 GLAST Large Area Telescope Gamma-ray Large Area.
GLAST LAT Project Oct 5, GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems Engineering.
GLAST LAT Project May 2, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems.
Supplier Product & Process Change Request. Flow Diagram: Supplier Product & Process Changes Requests Change notification form completed by supplier then.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Current Status Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
? Back Next INTRO. ? Back Next INTRO Main Menu What is Mail Merge? Slide 2 Purpose of Mail Merge Slide 3 Mail Merging Certificates Slide 5 Help Slide.
EInduction Overview 1 eDropship Post-Induction Process October 6, 2010 MTAC Workgroup 138.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
© 2008 Intel Corporation. All rights reserved. Intel and the Intel logo are trademarks or registered trademarks of Intel Corporation or its subsidiaries.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
LAT-MD August 2006 LAT Requirement Sell-off Package GLAST Large Area Telescope Gamma-ray Large Area Space Telescope GLAST Large Area Telescope.
GLAST LAT Project LAT Instrument Analysis Meeting – June 30, 2006 Hiro Tajima, TKR Efficiency Trending, NRL 1 GLAST Large Area Telescope: TKR.
Project management Topic 8 Configuration Management.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT Project5 April 2006 LAT System EngineeringLAT Verification Process GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Software Quality Assurance Kelly Burlingham SQE Stanford Linear Accelerator Center Gamma-ray.
GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
Public Spending Code (PSC) Quality Assurance Guidelines
Sales Training Presented by [Name].
GLAST Large Area Telescope:
Mechanical Integration
GLAST Large Area Telescope:
Sales Training Presented by Name.
GLAST LAT System Engineering
Texas Instruments Supplier Portal- Web Invoice Overview
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST LAT System Engineering
GLAST Large Area Telescope:
GLAST Large Area Telescope GLAST Large Area Telescope
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
CHANGE MANAGEMENT SYSTEM (CMS) PROCESS DOCUMENTATION
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope
Click on the Create Student Account Link
Thermal Vacuum Test: Plans and Procedures
GLAST Large Area Telescope GLAST Large Area Telescope
GLAST Large Area Telescope:
Sales Training Presented by [Name].
GLAST Large Area Telescope:
GLAST LAT System Engineering
GLAST Large Area Telescope:
Sales Training Presented by [Name].
GLAST Large Area Telescope
LAT Environmental Test Planning and Design Review
GLAST Large Area Telescope
GLAST Large Area Telescope:
Sales Training Presented by Name.
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Test Readiness Review
GLAST Large Area Telescope: Deputy for Systems Engineering
GLAST Large Area Telescope:
Presentation transcript:

GLAST Large Area Telescope Gamma-ray Large Area Space Telescope GLAST Large Area Telescope LAT Level Verification LAT Level Requirement Review Kickoff Rich Baun Systems Engineering

Agenda Requirement and verification flowdown overview Test Case review process overview Requirements responsibilities Test case review Test & Verification Website http://www-glast.slac.stanford.edu/systemengineering/Verification%20&%20Test/Verification%20and%20Test.htm

Requirement & Verification Flowdown

Test Case/Reqt Buy-Off Overview

Requirement Owner Responsibilities Know which requirements you are responsible to buy-off Know where and how your requirements are sold Determine your requirement type Functional – Function not impacted by environments, i.e. Commanding Environmental – Specific to an environment, usually requires analysis of environmental test data (Thermal, Dynamics, EMI) Performance – Requires trending, not sold until after TV Determine what sells your requirement Successful completion of a test? Data collected and checked by a test? Post test analysis of test data? Analysis only? There are test reports, test logs, configuration files, digi files (if applicable), and recon files (if applicable) available for review The VCRM identifies what tests sell what reqts Test case outlines show where and how each test sells reqts Write an NCR if you find an anomaly Provide objective evidence that a requirement is sold You must certify the LAT complies to the requirement Is analysis and a formal report required to document compliance?

How to Report a Requirement sell-off Report the requirement sell-off to Systems For reqts not needing a formal report (most requirements) Send an e-mail with the following information Requirement number (REQID) or Verification Plan number (VERID) Date, time, and run number when supporting test case(s) were run If data was collected from multiple runs, each run must be noted Worse case test data that supports the reqt was sold (if applicable) Compliance statement, i.e. the report must state definitively the LAT complies with the requirement Margin to the requirement must be stated where appropriate Any NCRs or JIRAs associated with the requirement must be listed For requirements needing a formal report Write a Requirements Verification Report (RVR) See next slide for details You will be notified if a requirement needs an RVR

Requirements Verification Reports For an agreed to subset of LAT requirements only, not all reqts Must have an assigned LAT Docs number Minimum RVR contents Requirement owner’s name Requirement source, text, and number Verification Plan text and number Supporting test case name and number (if applicable) Script name(s) used to run test Date, time, and run number when supporting test case(s) were run If data was collected from multiple runs, each run must be noted Compliance statement, i.e. the report must state definitively the LAT complies with the requirement Margin to the requirement must be stated where appropriate Supporting documentation of test data, analysis, and results Deviations from the verification plan and the reasons for the deviations must be stated Any NCRs or JIRAs associated with the requirement must be listed

VCRM Example

Test Case to Requirement Owner (1/2)

Test Case to Requirement Owner (2/2)