MKD/MKB Review Meeting Scope and Definition

Slides:



Advertisements
Similar presentations
Jan Uythoven, AB/BTLHCCWG, 3 May 2006 Page GeV Commissioning Machine Protection Needs to be commissioned to: Prevent damage with the used, higher.
Advertisements

“LHC Controls for Sector Test” Planning SPS Extraction Kicker and Septa LHC Injection Kicker and other equipment (beam stoppers, dumps,...) Etienne CARLIER.
Etienne CARLIER AB/BT/EC
N. Voumard, AB-BT-EC LBDS Audit, CERN LBDS Trigger Signal Distribution Trigger Synchronization Unit (TSU) Trigger Fan Out (TFO) Power Trigger Unit.
LHC Beam Dumping system
1 MKBH Erratic Jan Uythoven On behalf of the ABT team (Viliam, Nicolas M., Etienne, Laurent, Francesco etc…..) MPP meeting 8/5/2015.
Failure mode impact studies and LV system commissioning tests
B.Goddard 08/11/04 HHH 2004 Workshop, CERN Beam Dump Brennan GODDARD CERN AB/BT The existing LHC beam dump is described, together with the relevant design.
Technical review on UPS power distribution of the LHC Beam Dumping System (LBDS) Anastasia PATSOULI TE-ABT-EC Proposals for LBDS Powering Improvement 1.
LBDS Kicker Electronic and Slow Control Etienne CARLIER AB/BT/EC.
Solid-state based 60 kV 15 kA switch for the SPS vertical beam dumping kicker magnet L. Ducimetière, P. Faure, V. Senaj.
Strategy for SPS 200 MHz LLRF upgrade (1)  Each of the four cavities (2x 5 sections, 2x 4 sections):  1-T Feedback (loop around cavity and amplifier)
Proposed LHC beam dumping kicker generator modifications for LS2 TE-TM Meeting Viliam Senaj 07/07/2015.
Semiconductor Switch Designs M.J. Barnes Acknowledgements W. Bartmann, L. Ducimetière, B. Goddard, J. Holma, A. Lechner, T. Fowler, T. Kramer, M. Meddahi,
1 LBDS Testing Before Operation Jan Uythoven (AB/BT) Based on the work of many people in the KSL, EC and TL sections.
LBDS Power Triggering Etienne CARLIER & Jean-Louis BRETIN AB/BT/EC.
Etienne CARLIER, LBDS Audit, 28/01/2008 LBDS Environmental Aspects EMC, radiation, UPS… Etienne CARLIER AB/BT/EC.
Kicker generator and controls installation in ECA5? Etienne CARLIER
1 Beam Dumping System MPP review 12/06/2015 Jan Uythoven for the ABT team.
LMC 27 November 2013 Status of LBDS LS1 activities and plans for 2014 reliability run Jan Uythoven for the many, many people working on the mentioned equipment.
1 ABTEF - 16/05/2014 Maintenance of safety-critical systems : LBDS - MKD / MKB on LHC.
18 July Reminder Dilution kicker system MKB is staged (2H, 2V) –Limits extracted intensity at 7 TeV to 50% of nominal –For 25ns spacing, this is.
YETS status report TCM Francesco castronuovo.
TRIGGER DELAY 100µs. G. Gräwer AB/BT/ECLBDS Trigger Delay2 The trigger delay is a back-up system that generates an asynchronous dump trigger for MKD and.
SBDS – MKDV/H: The new MKDV Generator and additional Magnet for BA5 installation V. Senaj, L. Ducimetière November 20 th 2015.
YETS status report TCM Francesco castronuovo.
MTE: Statistics of kickers faults Etienne Carlier, Luis Feliciano, Laurent Ducimetière, Brennan Goddard, Luc Sermeus 1 19 October 2015 MTE internal review.
LHC machine protection close-out 1 Close-out. LHC machine protection close-out 2 Introduction The problem is obvious: –Magnetic field increase only a.
LBDS Kicker Procedures 11/ Nov LHC interventionActivityStatusEDMS # MKD SwitchRemplacement d’un interrupteur MKD HT + ‘check list’ Wait
MKDV upgrade LIU-SPS ABT meeting V. Senaj, L. Ducimetiere, P. Faure November 4 th 2014.
Reliability Analysis of the LHC Beam Dumping System Taking Into Account the Operational Experience during LHC Run 1 Roberto Filippini CERN ATS Seminar,
LHC Beam Commissioning Meeting V. Kain & R. Alemany
Data providers Volume & Type of Analysis Kickers
The TV Beam Observation system - BTV
DRY RUNS 2015 Status and program of the Dry Runs in 2015
UPS power distribution for LHC Beam Dumping System
Dependability Requirements of the LBDS and their Design Implications
Beam dump XPOC analysis
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
The LHC Beam Dumping System
Fast retrigger path What threshold level we need for the fast trigger path?
The HL-LHC Circuits: Global View and Open Questions
Introduction: FCC beam dumping system
Proposition of MKD & MKBH modification with the goal to reduce maximum voltage (and risk of erratic) Viliam Senaj, 05/05/2017.
LHC beam dump 7.56 TeV operation
EC Activities Status for LIU September 2017
LHC Beam Dumping System Reliability Run Summary
EC Activities Status for the LIU
LV Safe Powering from UPS to Clients
Chamonix 2009 – LHC Performance Workshop
Jan Uythoven For discussion
J. Uythoven for the MPE-MI & MS Teams
LHC Risk Review: Kicker Magnet Reliability
FCC hh dump kicker - switch topologies and impact on beam
Commissioning and Testing the LHC Beam Interlock System
Remote setting of LHC BLM thresholds?
Machine Protection Xu Hongliang.
LHC Injection and Dump Protection
Beam Dumping System and Abort Gap
Dry Run 0 Week 13: BI test of...everything circulating beam: all fixed displays and BI applications OP directories for 2009, concentrators running Need.
BESIII EMC electronics
Chamonix 2006 – LHC Project Workshop
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
1v1.
Will We Ever Get The Green Light For Beam Operation?
Commissioning of the Beam Conditions Monitor of the LHCb Experiment at CERN Ch. Ilgner, October 23, 2008 on behalf of the LHCb BCM group at TU Dortmund:
Saturday 10:00: Cryo Pt8 back, starting the pre-cycle.
Review of hardware commissioning
Close-out.
Status of the retriggering boxes and measurements
Presentation transcript:

MKD/MKB Review Meeting Scope and Definition Etienne Carlier & Laurent Ducimetière

Scope Validation of the strategy for consolidation of the LBDS MKD/MKB systems (generator, electronics & controls) for safe operation at 7 TeV with HL-LHC beam Definition of the roadmap up to 12/2019 for test, review, validation, implementation and deployment of selected solutions Agreement on reliability run conditions to be used and test to be performed for validation of the system

LBDS Validation consolidation objective Working point Switch in air? Working point Dilution strength & speed Waveform Extraction kicker rising-edge Commissioning strategy for operation at 7 TeV Reliability-run maximum energy Infrastructure Tunnel cleanness, sectorisation Re-trigger delay Sensitivity (delay vs. unwanted asynchronous dump) Sensors location in generator

LBDS generator MKD / MKB switch consolidation Design (switch, trigger transformer) Performance (impact of switch consolidation on performance parameter) Validation strategy Production Budget Planning Reliability run Others possible limitations for operation at 7TeV Principal capacitor (Impact of reliability run) ???

PTU Specification Design (PTM, cable…) Integration Performance validation Production Planning Budget Reliability test (pre-series / series)

Others Dilution system re-trigger strategy Re-trigger signals from RTB in IPOC (MKD / MKB) Cable delay compensation in IPOC (post-mortem analysis) Sparking activity (monitoring, interlocking…) Generator / Electronic grounding strategy …