MKD/MKB Review Meeting Scope and Definition Etienne Carlier & Laurent Ducimetière
Scope Validation of the strategy for consolidation of the LBDS MKD/MKB systems (generator, electronics & controls) for safe operation at 7 TeV with HL-LHC beam Definition of the roadmap up to 12/2019 for test, review, validation, implementation and deployment of selected solutions Agreement on reliability run conditions to be used and test to be performed for validation of the system
LBDS Validation consolidation objective Working point Switch in air? Working point Dilution strength & speed Waveform Extraction kicker rising-edge Commissioning strategy for operation at 7 TeV Reliability-run maximum energy Infrastructure Tunnel cleanness, sectorisation Re-trigger delay Sensitivity (delay vs. unwanted asynchronous dump) Sensors location in generator
LBDS generator MKD / MKB switch consolidation Design (switch, trigger transformer) Performance (impact of switch consolidation on performance parameter) Validation strategy Production Budget Planning Reliability run Others possible limitations for operation at 7TeV Principal capacitor (Impact of reliability run) ???
PTU Specification Design (PTM, cable…) Integration Performance validation Production Planning Budget Reliability test (pre-series / series)
Others Dilution system re-trigger strategy Re-trigger signals from RTB in IPOC (MKD / MKB) Cable delay compensation in IPOC (post-mortem analysis) Sparking activity (monitoring, interlocking…) Generator / Electronic grounding strategy …