EQE International The use of Fragility Analysis in Seismic Safety Cases for Nuclear Power Stations.

Slides:



Advertisements
Similar presentations
Accident and Incident Investigation
Advertisements

Risk Management Introduction Risk Management Fundamentals
2013 Northwest Hydro Operators Forum 1 Risk-Informed Decision Making – FERC Perspective David Lord, P.E., D2SI Dam Safety Risk team – Portland, Or Natural.
Advanced Construction & Maintenance Modeling [ARE 520] 1 The Use of AHP in Risk Ranking and Maintenance Planning for Cross-country Pipelines ARE 520 TERM.
Preliminary Impacts of Wind Power Integration in the Hydro-Qubec System.
Safety System & Scene. Overview Safety Terms Hazards Hazard Lists Worst Case Conditions Hazard Characteristics Analysis Sumary.
RISK INFORMED APPROACHES FOR PLANT LIFE MANAGEMENT: REGULATORY AND INDUSTRY PERSPECTIVES Björn Wahlström.
Integrated Risk Management and Risk Communications David DeGagne, Executive Director Centre for Risk Management Tel: Fax: Web:
Donegani Anticorrosione S.r.l
Quantifying risk by performance- based earthquake engineering, Cont’d Greg Deierlein Stanford University …with contributions by many 2006 IRCC Workshop.
6/23/2015 Risk-Informed Process and Tools for Permitting Hydrogen Fueling Stations Jeffrey LaChance 1, Andrei Tchouvelev 2, and Jim Ohi 3 1 Sandia National.
1 Risk evaluation Risk treatment. 2 Risk Management Process Risk Management Process.
1 SKJ©DNV Cost Effectiveness of Hull Girder Safety Rolf Skjong & EM Bitner-Gregersen Det Norske Veritas OMAE, Oslo, June 24-28, 2002.
Risk Management at a Glance. Terms Hazard Hazard Risk Risk Probability Probability Severity Severity Estimating Estimating Exposure Exposure Risk Assessment.
PART IX: EMERGENCY EXPOSURE SITUATIONS Module IX.1: Generic requirements for emergency exposure situations Lesson IX.1-2: General Requirements Lecture.
Basics of Fault Tree and Event Tree Analysis Supplement to Fire Hazard Assessment for Nuclear Engineering Professionals Icove and Ruggles (2011) Funded.
IOPS Toolkit for Risk-based Supervision Module 2: Quantitative Assessment of Risk.
Isograph Reliability Software RiskVu V3. Isograph Reliability Software ESSM – The first risk monitor ? Essential Systems Status Monitor Installed at Heysham.
Health and Safety Executive UK Approach to Risk Assessment of Genotoxic Carcinogens in the Occupational Setting Dr Susy Brescia Chemicals Regulation Directorate.
Engineering Doctorate – Nuclear Materials Development of Advanced Defect Assessment Methods Involving Weld Residual Stresses If using an image in the.
©2010 Prentice Hall Business Publishing, Auditing 13/e, Arens//Elder/Beasley Audit Sampling for Tests of Details of Balances Chapter 17.
©2012 Pearson Education, Auditing 14/e, Arens/Elder/Beasley Audit Sampling for Tests of Details of Balances Chapter 17.
Frequency analysis and scenario development
Committee on Carcinogenicity (COC) Approach to Risk Assessment of Genotoxic Carcinogens David H. Phillips* COC Chairman Descriptive vs. Quantitative.
Seismic Hazard Assessment for the Kingdom of Saudi Arabia
Risk-Informed In- Service Inspection (RI-ISI) Ching Guey.
Introduction Time Quality Cost Project Constraints Success Introduction.
Risk Management for Technology Projects Geography 463 : GIS Workshop May
2013 NWHA CONFERENCE FERC’S RISK-INFORMED DECISION MAKING Doug Johnson – Regional Engineer - Portland From PFMA to Risk Assessment.
PREPARED BY MS. ROSITA ARMAN MICHAEL ANNIAH MBA IN STRATEGIC MANAGEMENT (UTM) BA. ESTATE MANAGEMENT (UITM)
Risk Management Approaches to Hydrogen Safety. Risk Assessment, Limbo Dancing, and ALARP Les Shirvill.
THE LOW DOWN ON RISK ASSESSMENT HOW SAFE ARE OUR CITIES?
TACIS Project: R8.01/98 – TRANSLATION, EDITING AND DIFFUSION OF DOCUMENTS (Result Dissemination) Probabilistic Safety Analysis Technology (PSA) TACIS R3.1/91.
RISK BASED DECISIONS – THE ROLE OF SCIENTIFIC EXPERTISE AND JUDGEMENT PAUL DAVIES HSE’s Chief Scientist & Director Of the Hazardous Installations Directorate.
INTEGRATED ASSESSMENT AND PLANNING FOR SUSTAINABLE DEVELOPMENT 1 Click to edit Master title style 1 Evaluation and Review of Experience from UNEP Projects.
EQE International The use of Fragility Analysis in Seismic Safety Cases for Nuclear Power Stations.
Risk Management on Tunnelling Projects Warwick University MSc course
The Risk Management Process
RISK MANAGEMENT YULVI. Introduction Time Quality Cost Project Constraints Success Introduction.
Forecasting for Water Resources Planning. Learning Objective(s):  The student will:  Understand the need for forecasts.  Be able to describe what a.
Diablo Canyon NPP Risk-Informed In-service Inspection
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Temelin NPP Risk Panel A PSA and Safety Monitor Application Workshop Information.
UNECE – SC2 Rail Security Analysis and economic assessment of rail transport security 1st October 2009 Andrew Cook.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Probabilistic Risk Assessment Program Workshop Information.
Overview of the handbook Chapter 5: Levee inspection, assessment and risk attribution.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Maintenance Rule Program Workshop Information IAEA Workshop.
Safety of At-Reactor High-Density Storage of Fuel in Pools Steve Jones Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission International.
Failure Modes, Effects and Criticality Analysis
Qualitative and Quantitative Criteria for RIDM Stanislav Husťák Nuclear Research Institute Řež plc, Czech Republic Reliability and Risk Department INFRA.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making “Overview of Level 2 PSA” Workshop Information IAEA Workshop City, Country.
Workshop on Risk informed decision making on nuclear power plant safety January 2011 SNRC, Kyiv, Ukraine Benefits and limitations of RIDM by Géza.
Risk Assessment OSHA 21/09/ WHAT IS RISK ASSESMENT? Risk Assessment is the process of determining the possibility of short and long term unfavorable.
Professor Mahesh Pandey Institute of Risk Research and
PRA: Validation versus Participation in Risk Analysis PRA as a Risk Informed Decision Making Tool Richard T. Banke– SAIC
JSC Atomenergoproekt, Moscow, RF
Casualty Actuarial Society Practical discounting and risk adjustment issues relating to property/casualty claim liabilities Research conducted.
Kick-off Conference “Risk Management for
Date of download: 12/23/2017 Copyright © ASME. All rights reserved.
C. Richard Donnelly and M. O’Mara, Hatch – Canada
Air Carrier Continuing Analysis and Surveillance System (CASS)
Health Risk = Consequences X Probability (Likelihood)
EQ programs at Mochovce NPP – Severe Accident Cases
Ageing Management Session Name: Principles of Ageing Management
Sandia National Laboratories
Comparison of different gearshift prescriptions
Evaluating and Choosing Preferred Projects
Statistical Analysis of Power System Faults
The UMBRA Eight-Step Benefit-Risk Framework
What to look at in fire engineering analysis
Presentation transcript:

EQE International The use of Fragility Analysis in Seismic Safety Cases for Nuclear Power Stations

EQE International LAYOUT BACKGROUND OBJECTIVES OUTLINE METHODOLOGY FRAGILITY CURVE DEVELOPMENT ALARP ANALYSIS CONCLUSIONS

EQE International BACKGROUND LTSR and PSR completed to deterministic principles Regulator driven requirement to confirm that the risk posed is ALARP Not a Seismic PSA

EQE International OBJECTIVES To confirm that the current level of qualification renders the risk of unacceptable seismically induced damage as ALARP To understand the relative contributions of different items of plant, equipment and structures to the risk profile To identify areas of plant, the modification of which would decrease the annual failure frequency to the lowest reasonably practicable level

EQE International OUTLINE METHODOLOGY 1 Identify claimed safety functions and associated equipment/structures 2 Identify deterministic margins, and the methods of assessment used. Normalise margins. Characterise Variance in Capacity. Calculate “median” margins 3 Convolute the hazard and fragility curves and screen out items with an annual failure frequency below a defined cut off

OUTLINE METHODOLOGY cont EQE International OUTLINE METHODOLOGY cont 4 Identify modifications to increase the margin 5 Associate a bounding fault categorisation to a loss of safety function. Convert the fault category to an associated environmental cost as defined in the Safety Review Guidebook 6 Calculate Cost Benefit Ratio (CBR) 7 Review results, and provide information to the Client to assist in the decision making process

FRAGILITY CURVE DEVELOPMENT EQE International FRAGILITY CURVE DEVELOPMENT Identify Assessment Types 1 Code Based eg BS 5950, 8110, 5628, 806, ACI 349 2 Other Codes eg R6, SQUG 3 Comparison with available experimental data 4 Engineering Judgement

FRAGILITY CURVE DEVELOPMENT EQE International FRAGILITY CURVE DEVELOPMENT Use EPRI and other research work previously undertaken to derive fragility curve parameters Development of the application of standard curves for other assessment types eg R6

EQE International

DERIVATION OF MEDIAN FRAGILITY EQE International DERIVATION OF MEDIAN FRAGILITY The median fragility â is a function of the following parameters: a) the normalised assessed margin Ma b) the Code factor Fc (default value 1.0) c) the HCLPF factor d) the combined logarithmic standard deviation c e) the peak ground acceleration for the site’s 10-4 p.a. URS event, å

NORMALISATION OF MARGINS EQE International NORMALISATION OF MARGINS Aim to place all margins on a common basis Examine basic input for all calculations, and acknowledge degree of sophistication applied to assessments Identify appropriate fragility parameters This process is to a certain degree iterative, particularly for items with apparently anomalous margins

NORMALISATION OF MARGINS- KEY FACTS EQE International NORMALISATION OF MARGINS- KEY FACTS Margins have been derived over c 15 years using a variety of approaches The current state of the art is more advanced than when the LTSR work began For some cases, seismic margins cannot be readily extracted, for example elements with high working stresses, where only margins against total load have been assessed Margins are often calculated against eg a code allowable, not a true measure of the loss of functionality

EQE International

EQE International

EQE International ALARP ANALYSIS Quantifiable Cost Elements Basic time and materials costing Costs as an overrun of outage Costs of safety case preparation Non-Quantifiable Cost Elements eg Worker Dose (qualitative ALARP)

EQE International CALCULATION OF COST BENEFIT RATIO Rank Review Report Annual Safety Function Failure Frequency = Annual Equipment Failure Frequency X Probability of Safety Function Failure Risk cost (valuation) = Accident cost x Remaining Station Life X Annual Safety Function Failure Frequency Modification Cost for the Plant Item in Question Current Risk Cost - Risk Cost Post Modification C.B.R. = Rank Review Report

EQE International CLOSURE The approach has been very useful in acting as a ranking tool to better understand the key contributors to the risk profile The approach used has shown the absolute necessity for normalisation of margins The approach used allows judgment to be applied in a quantifiable manner. This has overcome the limitations inherent in alternative, purely mechanical evaluation methods