Importance of Pre-Construction Meetings

Slides:



Advertisements
Similar presentations
Section 12 Under Construction. Your role as the owner What to expect at the preconstruction meeting Dos and Dont during construction How to handle change.
Advertisements

GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
ALABAMA STORMWATER The Problem and How ALDOT Has Corrected It.
Future of the Construction and Post Construction Water Quality Program
Stormwater 101: How to stay out of trouble with TDEC.
“TI” Ohhhh….. (TIO) (No TIO is not a person!) What is it all about?
Environmental Harm Urban stormwater frequently contains litter, oil, chemicals, toxic metals, bacteria, and excess nutrients, like nitrogen and phosphorous.
Community Development Department ACTION ITEM – MODERATE PRIORITY Building, Permitting and Inspection Processes: Simplification/Streamlining CITY COUNCIL.
 At least 5 years experience as a worker  Must pass the state exam.
AZPDES and Construction Sites Greg Wise Environmental Program Specialist Arizona Department of Environmental Quality (602)
BUILD WITH US. ™ Contractors
Contractor & Owner Roles in Health & Safety. Safety Topics Contractor Role in Health and Safety Owner Role in Health and Safety.
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
Ronald Poe Gabe Robertson Planning and Project Development Division.
Module 7: Construction Phase
Introduction to Construction General Permit Inspections.
Public Hearing August 30, 2014 Drive-Way Ordinance Please Sign in…
Mn/DOT AUDIT COUNTY HIGHWAY ACCOUNTANTS SINGLE AUDIT DISCUSSION.
A Review of the Hollis Stormwater Management Ordinance Todd H. Dresser, CHMM Cuoco & Cormier Engineering Associates.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Pacific Air Forces 1 Preconstruction Orientation HQ PACAF/LGC.
SMALL CONSTRUCTION STORMWATER PERMITTING. STORMWATER GENERAL PERMIT FOR SMALL CONSTRUCTION ACTIVITIES Construction activities regulated under this permit.
Short Elliott Hendrickson Inc. April A. Ryan, PE.
Erosion & Sediment Control. Wind Erosion Water Erosion.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
Urban Programs. Urban Programs - ESC Virginia Erosion and Sediment Control (ESC) Law –Approved in –Title 10 of the Code of Virginia. “Each District.
Unit 1: Planning and Permitting Mr. Todzia. How does a construction project start? First need someone to initiate……could be the homeowner, a developer.
 Storm Water Pollution Prevention Plan (SWPPP)  All dischargers over 1-acre must develop a SWPPP  6 major portions of every SWPPP Site Evaluation and.
Erosion and Sediment Control Programs at the Cities of Colleyville, Keller, Grapevine, Southlake, and Trophy Club Jimmy Brock, City of Colleyville Keith.
Erosion and Sediment Control Plans (ESCPs) San Rafael, California November 12, 2015 Marin County Stormwater Pollution Prevention Program.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
CGP Transfers and Terminations How does it end?. Transfers.
IT’S THE 11 TH HOUR And General Engineering is … HOLDING US UP!
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
The Rezoning Process CHARLOTTE-MECKLENBURG PLANNING.
Storm Water Pollution Prevention Plan Development Todd E. Hubmer PE WSB &
Permit Process & Application Guide
Guidelines for Land Clearing Presented By: SLC Environmental Resources Department.
Unit 210: How to communicate with others
Pollution Control: For Field Office Construction Sites.
Applicant:Derek and Erica Hokkanen Site Address: th Street Property #s: A Computer #s: Location:Section 33, T30N, R16W,
Erosion and Sediment Control Ordinance. City of Southlake Strategy Map Live Our Core Values The City of Southlake provides municipal services that support.
R-5BCS Building Construction Services Department 2015 Adjusted Fee Schedule Resolution Stabilization of Commercial Building Permit Fee Multiplier.
Briefing regarding the new State General Stormwater Pollution Control Permit.
UST Inspection Program
How Are Things Changing?
Marquis Hills Area Information Meeting December 7, 2016
Kent Edler, Senior Civil Engineer
Stormwater Compliance is Easier
SWPPP Basics.
Storm Water Pollution Prevention Plan Development
TENANT PROTECTIONS DURING CONSTRUCTION SMMC AND
MERTON’S CONSTRUCTION
Iowa Certified Construction Site Pollution Prevention Inspector
TPDES Construction Management at the City of Laredo
Department of Buildings
Improving Your Construction Site
Temporary Works Co-ordination
La Grange Plaza Rezoning & Site Plans Site Construction Plans Site
Common Control Self-Declaration form
City of Ventura Green Building Standards
Onsite Control of Visitors & Contractors
Rule 5 and 13 Conversion Impacts
Flow chart to determine whether coverage is required
TPDES Construction General Permit Compliance
Dust Permits – ‘Process and Common Issues’ Craig Grismore - PCAQCD
Multi-Sector General Permit: MSGP
Construction Management Services April 16, 2018
Stormwater Construction General Pemit (CGP) TXR150000
Rule 5/6/13 Conversion to General Permits
Presentation transcript:

Importance of Pre-Construction Meetings Erica Williams Environmental Manager

Get everyone on the same page of understanding the importance of what’s required, what’s at stake, and why

Like it or not, diligence and compliance is MANDATORY IEPA NPDES permit (1 acre or more disturbance) City and/or County permit(500 sf or more land disturbance) City and/or County MS4 permit (any land disturbance City and/or County Ordinance (any land disturbance Clean Water Act (any land disturbance)

Who Should Attend?

Who Should Attend? Owner – they own the site and the problems General Contractors – their name is on the docs Sub Contractors – they should be signing the docs too Utility companies – tracking and stockpiling, ESC destruction Concrete company – washout location Painters – washout location Plasterers – washout location Trucking company – tracking, ESC destruction Electricians – tracking, ESC destruction Plumbers – tracking and digging, ESC destruction Delivery companies – tracking, ESC destruction

Who Should Attend? Inspectors – tracking Design engineer – they wrote the SWPPP for a reason They can answer questions City Staff – We approved the SWPPP for a reason Use our knowledge and our experience! Landscaper – tracking, stabilization measures and timelines, ESC removal ESC subcontractor – make sure they know their role and that you understand their role Anyone else onsite whether planned on just showing up

Discussion Points Signing sub contractor pages Checking in - newcomers Tracking Parking/tracking Perimeter controls Grading methods and staging Designated washout areas Temporary stabilization – when and how Final stabilization – when and how

Discussion Points Potential/Suggested changes, alterations, etc. Inspection-responsible party ESC repairs-responsible party Ask others if they have questions, concerns, suggestions, etc. MAKE IT WORK FOR EVERYONE!

Meeting’s Over, Now What? Update the SWPPP w/changes, alterations, deletions, signature pages, pre-con attendance sheets, etc. Submit newly updated SWPPP to IEPA & City Begin work and inspections Update signature pages as new subs arrive Alter/change SWPPP as necessary Call subsequent meetings if needed. Watch the site for newcomers! Resubmit SWPPP as necessary

Liability YOU ALL SIGNED THE NOI or SWPPP! Property owner Design Engineer Prime Contractor Subcontractors Independent Utility Companies

You’re all being watched by someone! Mostly citizens and other contractors!

Questions?