WasteMINZ May Roundup 16th May 2013

Slides:



Advertisements
Similar presentations
P ROJECT C LOSEOUT. Introduction This purpose of this presentation is to summarize key project closeout information and feedback for purposes of presenting.
Advertisements

Staff Training Type your subject here. Welcome and Introduction Welcome the staff members to the session. State the subject of the session. Describe the.
WasteMINZ Mid-Year Roundup Wellington. why have a glass scheme? formal process supporting the glass packaged goods industry consistent with Government’s.
Gas Consumer Forum Project Nexus xoserve update 27th July 2009
Presented by Cooperative Assurance Model Ben Heilbronn - Senior Business Analyst, Indirect Tax, Integrity of Business Systems Nigel Cousins – Director,
How many more systems? Jane Lovell TQA Australia.
Topic 6 Environmental Impact Assessments. EIA – Introduction The start Effectiveness?
United States-Canada Regulatory Cooperation Council United States-Canada Regulatory Cooperation Council January 30, 2012 Washington D.C
Training Strategy/Approach February 2005 Workshop.
| 0800 TYREWISE ( ) | 1 Progressing towards End of Life Tyre Stewardship in NZ Update for Environmental.
Environmental Health and Safety Committee 4-30 Carbon Disclosure Project (CDP) Lee Wilmot TTM Technologies April 2009.
Small Business, Big Picture Industry, leadership and workforce development Jeanette Allen Chief Executive Officer.
LOW CARBON VEHICLE PARTNERSHIP LAUNCH TEAM Professor Jim Skea Konstanze Scharring SMMT 16 September 2002.
Strategic Environmental Assessment (SEA) A Scottish replacement to Air Passenger Duty (APD) Elaine McCall Environmental Assessment Team The Scottish Government.
Development Services Official Community Plan Overview and Review Process.
Phone No: +1 (214) Market Research Report on Global Auto Tyre Industry Published Date:
ENVIRONMENTALLY RESPONSIBILITY
ENTREPRENEURSHIP Lecture No: 22 BY CH. SHAHZAD ANSAR
WIND And Solar ENERGY CONVERSION MODEL GUIDELINES Consultation update – September 2016 Presented by Marcelle Gannon.
STUDY TITLE Presenter Name Presenter Title Duty Location
Policy workstreams Craig Mallett Miriam Eagle.
Presentation to the BSC Panel
Fair Go Rates System Dr Ron Ben-David Chairperson
Designing Your Study and Selecting a Sample
* Type your subject here
Presentation to the BSC Panel
Staff Training Type your subject here.
Campus Master Plan.
Saskatoon South Perimeter Freeway Information Session
Training Presentation
Show Your Plan to the World
Nonrenewable Energy.
EMPOWERMENT OF FLEET OPERATORS
Notifiable data breaches Roundtable
U.S. EPA e-Manifest Program
Our Change Management Approach
The Lean Sourcing Process
PROJECT CHARTER DOCUMENT
FSTF Strategic planning update
Welcome to the New Vendor Support Center!
Welcome to the Vendor Support Center!
Qualifications update
Presentation Training
Preparations for post-2020 Impact Assessment European Commission Directorate General for Regional and Urban Policy Unit DGA Policy.
Severn Tidal Power Feasibility Study
Information to support CEAF Notification of approval of new assembly line at the suppliers Chinese manufacturing location for the , COMPRESSOR,
THE EUROPEAN UNION’S ECO - MANAGEMENT AND AUDIT SCHEME
جمع النفايات الصلبة دليل للحكومات المحلية.
Critical Incident and Business Log
Fair Go Rates System Dr Ron Ben-David Chairperson
General: Training - On-screen presentation
Partner Search Service: an integrated new system
Student Name: Student Id: Supervisor’s Name:
Informed Consent (SBER)
Revision of EU Ecolabel Criteria for Wooden Floor Coverings
1 Hour Training Bubbles Greener Working Casebook
National Television and Computer Recycling Scheme
Training Presentation
April High Holborn, WCIV6DA
Development of energy balance statistics
Proposed Environmental Incentive
Training Presentation
Sulfur Dioxide 1-Hour NAAQS Implementation
* Type your subject here
West Cumbria Sites Stakeholder Group – response to NDA Business Plan
Draft revision of ISPM 6: National surveillance systems ( )
Étienne Saint-Pierre, Statistics Canada
Project Management Essentials
Session 8: Investigation Function
Session 11: Finance Function
Presentation transcript:

WasteMINZ May Roundup 16th May 2013 Where we are at WasteMINZ May Roundup 16th May 2013 Gareth Mentzer

Project Overview to date Project Plan completed and Milestones signed off Milestone 1 -Launch Project: Completed 05/04/2012  Milestone 2 - Critique of Existing Systems and Stakeholder Consultation: Completed 30/05/12  Milestone 3 - Investigate Alternative Uses: Completed 31/07/12  Milestone 4 - Identify Options: Completed 04/09/12  Milestone 5 - Identify Industry Preferred Option: Part 1 Completed 30/09/12  Part 2 Completed 01/03/13  Milestone 6 - Consult with Industry: Ongoing Milestone 7 - Scheme Launch Preparation: Complete by: 15/06/2013

Scoping Report 4 – Key Points Governance Structure – PSO Mission Statement “Improving the value for end of life tyres in cost effective and environmentally sound ways” Regulatory Support – Priority product Incentive Placement

Project Overview to date Project Plan completed and Milestones signed off Milestone 1 -Launch Project: Completed 05/04/2012  Milestone 2 - Critique of Existing Systems and Stakeholder Consultation: Completed 30/05/12  Milestone 3 - Investigate Alternative Uses: Completed 31/07/12  Milestone 4 - Identify Options: Completed 04/09/12  Milestone 5 - Identify Industry Preferred Option: Part 1 Completed 30/09/12  Part 2 Completed 01/03/13  Milestone 6 - Consult with Industry: Ongoing Milestone 7 - Scheme Launch Preparation: Complete by: 15/06/2013

Public Consultation Overview What topics were covered How were the sessions run

Registered Tyre Importer

Consumer

Registered Generator

Registered Collection Site

Registered Transporter

Registered Processor

Registered Manufacturer

An end use product

Supply Chain - Summary Registered Tyre Importer Consumer Registered Generator Registered Collection Site Registered Transporter Registered Processor Registered Manufacturer End use product

Summary – Feedback received Significant levels of feedback received, which included; Priority Product needs to occur Regulatory support options Central Government support for procurement Summary report available on the website

Questions? Gareth Mentzer gareth@3r.co.nz or 0800 897 394