ITU-R Ad-Hoc Contact person

Slides:



Advertisements
Similar presentations
ITU-R Liaison Group Report - Session #63 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0088r1.
Advertisements

DOCUMENT #:GSC15-PLEN-15 FOR:Presentation SOURCE:CCSA AGENDA ITEM:Opening Plenary 6.1 TD-SCDMA & TD-LTE Standard and.
11 ITU-R Liaison Group Report - Session #80 Closing Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: Gdoc Date.
1 IEEE m-07/001r Work Plan for IEEE m Standard & IMT-Advanced Submission.
1 IEEE m-09/0019r Work Plan for IEEE m Standard & IMT-Advanced Submission.
Fostering worldwide interoperabilityGeneva, July 2009 IMT Standardization activities Colin Langtry, Radiocommunication Bureau, ITU Global Standards.
Halifax, 31 Oct – 3 Nov 2011Global Standards Collaboration Updated CCSA Activities on IMT Standardization and industry in China Ke Wang, CCSA Document.
IMT activities in ITU-R DOCUMENT #:GSC13-PLEN-13 FOR:Presentation SOURCE:ITU-R AGENDA ITEM:Plenary 6.1 CONTACT(S):Kevin Hughes Submission Date: July 1,
Proposal for IMT-Advanced Development Work Plan for m Document Number: IEEE C /030 Date Submitted: Source: Jose Puthenkulam
IEEE /r3 Submission September 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
1 ITU-R Liaison Group Report - Session #67 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0046.
1 ITU-R Liaison Group Report - Session #66 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0030r1.
ITU-R Liaison Group Report - Session #63.5 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0111r1.
1 LTE standards Status for this work in 3GPP and what next for the Future Francois COURAU 3GPP TSG RAN Chairman.
ITU-R Liaison Group Report - Session #62 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0072 Date.
1/10 CJK IMT 25, Beijing, China TTA PG707 Status Report CJK IMT 25 Beijing, China May 19, 2010 CHUNG, Hyun Kyu (HK) CJK-IMT25-xxx.
1 ITU-R Liaison Group Report - Session #72 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0006.
WP5D Meeting Results Seoul. 2 IMT-Advanced Summary  IMT.EVAL Completed  Describes the methodology for evaluating IMT Advanced  Contained in.
11 ITU-R Liaison Group Report - Session #75 Closing Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0058.
ITU-R Liaison Group Report - Session #64 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0127 Date.
1 ITU-R Liaison Group Report - Session #71 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0127.
ITU-R Liaison Group Report - Session #74 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0037 Date.
IEEE /r5 Submission November 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
GSC IMT Task Force Report Kohei SATOH ARIB DOCUMENT #:GSC13-PLEN-64r1 FOR:Presentation SOURCE:Kohei Satoh (ARIB) AGENDA ITEM:GRSC (7); Plenary (6.1) CONTACT(S):Kohei.
TGm Work Plan Adhoc Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16m-09/1181 Date Submitted: Source:
1 Presentation Title 3GPP WORK ON 5G Presenter Erik Guttman Session
Suggestion to update Work Plan for IEEE m Standard
NR workload management
IMT-2020 Process Presentation to the IEEE 5G group (24 June 2016)
Initial workplan on NR spectrum
Wayforward on Rel-15 NR Study Items
IEEE Presentation Submission Template (Rev. 9) Document Number:
WPM ad-hoc group report TP#25
ITU-R Liaison Group Report - Session #73 Opening Plenary
Submission Title: [WG-TG3b Meeting Report Sept04]
Way forward on emissions scaling
Work Plan for IEEE m Standard & IMT-Advanced Submission
IMT-2020 Contribution Content
CEOS Work planning Steven Hosford, ESA/CNES, CEO
ITU-R Liaison Group Report - Session #62 Opening Plenary
IMT-2020 Process Presentation to the IEEE 5G group (24 June 2016)
Liaison Report Date: Author: Jan 2008 Month Year
IEEE 802 IMT-Advanced Technology Proposal Process
Document No: GSC-18_006 Source: Invited Speaker, ITU-R WP5D / ARIB
IEEE Coexistence SC closing report in Warsaw in May 2018
IEEE IMT-Advanced Review Process
ITU-R Liaison Group Report - Session #80 Closing Plenary
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
Comments on IMT-Advanced Review Process
IEEE 802 IMT-Advanced Technology Proposal Process
Submission Title: [WG-TG3b Meeting Report Sept04]
ITU-R Liaison Group Report - Session #65 Opening Plenary
Reporting and Water Information System for Europe (WISE)
IEEE IMT-Advanced Review Process
Water Directors’ Meeting Working Group D (Reporting) activities
May 2015 doc.: IEEE /0496r1 March 2018 IEEE TG13 Multi-Gbit/s Optical Wireless Communication March 2018 Meeting Slides Date:
Month Year doc.: IEEE yy/xxxxr0 May 2019
IEEE 802 IMT-Advanced Technology Proposal Process
IEEE IMT-Advanced Review Process
ITU-R Liaison Group Report - Session #65 Opening Plenary
Activities of ARIB on IMT Standards
Dino Flore TSG-RAN Chairman Balazs Bertenyi TSG-SA Chairman
TTA activities on IMT-Advanced Standardization
TTA Activities on IMT-Advanced standardization
Month Year doc.: IEEE yy/xxxxr0 May 2019
Internet of Things (IoT) Work Group
May 2015 doc.: IEEE /0496r1 March 2018 IEEE TG13 Multi-Gbit/s Optical Wireless Communication March 2018 Closing Report Date:
IEEE 802 IMT-Advanced Technology Proposal Process
Presentation transcript:

ITU-R Ad-Hoc Contact person 3GPP submission towards IMT-2020 ITU-R Ad-Hoc Contact person

Agenda items Submission timeplan Format of submission Naming (not for discussion – already endorsed by RAN) Distribution of this document

Submission timeplan

Submission timeplan Submission Milestone Name 3GPP Meeting ITU-R Meeting General Submission Content Submission Templates (Release Basis)   Self- Evaluation Workshop RAN # 77 Sept 2017 WP 5D #28 Oct 2018 Overview - Initial Templates Only RAN # 78 Dec 2017 WP 5D # 29 Feb 2018 Description Templates Description Templates 5.2.3 (R15) Update & Self-Eval RAN # 81 Sept 2018 WP 5D # 31 Compliance Templates Self-Evaluation Compliance Templates 5.2.4 (R15) (R15) Final RAN # 84 June 2019 WP 5D # 32 July 2019 Description Templates 5.2.3 (R15+R16) Compliance Templates 5.2.4 (R15+R16)

Submission timeplan WF (convenor proposal): Follow the timeplan as per slide 2 and slide 3 February submission: High level description of NR, LTE (including NB-IoT and eMTC), and ENDC (including planned architecture options) No self-evaluation required Final submission based on Rel 15 and Rel 16 features and specifications

Format of submission WF (convenor proposal): Proposal 1 SRIT Component RIT: NR (TBD incl. NB-IoT, eMTC) Component RIT: EUTRA/LTE (incl. NB-IoT, eMTC) full 38 and 36 series Evaluation of each component RIT shall be performed, and IMT2020 compliance demonstrated, against all IMT2020 requirements and test environments Proposal 2 In addition to above, submit an NR RIT Proposal 3 In addition to the above, submit an LTE RIT

Naming (already agreed) Name of the 3GPP technology endorsed by RAN: Name : 5G Developed by 3GPP as 5G Release 15 and beyond (5G)

Distribution of this document The agreed way forward to be submitted to RAN WGs (see RP-171567) Submit the agreed to SA and PCG for their endorsement