Analysis and Design of the Water Distribution Network for Teeba area,Nablus By Ranin Abu Gharbieh Under supervision of Dr. Mohammad Almasri
Introduction Objective Outline Study Area Methodology Design Results
Introduction Importance of water. Significance of designing a water distribution network. Water is the most important component in the human life which forms 70% of human body. An important element like water should be available in high level of accessibility, safe, clean, and in adequate quantity Because of this, Water distribution networks are used to transmit water from the resources to the consumptions. It decreases the effort, time, cost and make the life easier
Objective Design water distribution network The main aim of this project is to design a water distribution network capable in providing the population with sufficient quantities of water in accordance with local and international standards
Study Area Location Study area Topography Climate Land use Soil type Water resources
Study Area Location Study area Topography Climate Land use Soil type Water resources
Study Area Location Study area Topography Land use Climate Soil type Water resources
Study Area Location Study area Topography Land use Climate Soil type Water resources
Climate
Study Area Location Study area Topography Land use Climate Soil type Water resources
Soil type Soil in the study area is considered to be mainly marl soil.
Study Area Location Study area Topography Land use Climate Soil type Water resources
Water resources Oudala. Sabastya. Al-Badan. Der-Sharaf. Alfaraa Ground wells.
Building distribution Methodology Collecting Data Master plan Population Maps Analysis AutoCAD & GIS Contour map Road network Building distribution Design WDN Water CAD demand Pipes & node Reervoir Result velocity Pressure The methodology that followed in this project, first we collect the needed data, we get the master plan from a surveyor and the population from PBCS, then by using AutoCAD and GIS softwares we extract the countor map, road network and building distribution from the master plan. After this we transferred these maps to watercad to design WDN and we have results on velocities and pressures
Design Criterias Pressure Max: 100 m H2O Min : 20 m H2O Velocity: Max: 3 m/s Min: 0.3 m/s
Design Network Layout of the proposed distribution network(Junction IDs)
Design Results Layout of the proposed distribution network(Pipe IDs)
Length of the pipes Hazen William Coefficient Diameter of the pipes Pipe characteristics Length of the pipes Hazen William Coefficient Diameter of the pipes
Node characteristics Elevation Demand
Demand Calculations Finding the area of Teeba using GIS ArcMap. Choosing villas as the common type of building in Teeba. Getting the avg number of family members in Palestine. Considering the domestic consumption. According to WHO the average demand is …… and we assume that the losses in network is .20 thus we must to provide 145 And according to PBCS the population in 2007 was….. And growth factor is 1.9 thus the current population is …… and consider design period of 35 years the future population is ….. And the future demand is ….
Thiessen Polygon
Reservoir characteristics Coordinate Elevation
Design results Point one: The elevation of the reservoir less than many junctions elevation Using pump
Cont.. Point two: At (2-4) am facing high pressure problems At (6-8) am and (4-6) pm facing high and low pressure problems
Cont.. Point three: Low pressure problem solutions High pressure problem solutions
Main network before splitting
Networks after splitting High pressure network Low pressure network
High pressure network analysis Analyze the high pressure network, trying to minimize as much as possible the number of junctions with high pressure.
Low pressure network analysis Applying the same analysis as done in the high pressure network, gives a good results such that almost all junctions pressure within the acceptable range (20-100) mH2O.
Velocity constraint Upper limit(3m/s) not exceeded in any pipe Lower limit(0.3m/s), some pipes fall under it, so the diameter of all pipes except the main pipe considered 2 inch, where the diameter of the main pipe is 6 inch
Conclusion
Applying an alternative solution for the high pressure network using a pressure reducing valve, if a looped network is to be constructed for Teeba area in the future.
THANK YOU