Activities Status and Plan for the week

Slides:



Advertisements
Similar presentations
Endcap assembly update C Buttar UK-SCT-MB RAL 2 nd Sept 04.
Advertisements

Crimping Get the pinouts for the desired connector and application. 2.Identify the proper connector and the associated pins for your application.
Procedures during Tracker Connection WPA meeting 3 rd December 2007, Michael Eppard, CERN Installation sequence Manpower needs for installation work.
TRD Status Meeting Münster Clemens Adler TRD ROC Status Status Meeting Münster
AMS-02 tracker mechanics status of construction, assembly, integration Production: - Ladder integration - Installation on planes Inner tracker assembly:
Walls crates cables gas chambers electronics CERN adb.
ER Bundle “final” design D. Giugni / INFN Milano D. Giugni nSQP's meeting 1.
1 Telecom Cabling Patch panels, cabinets and raised floors.
Chiho Wang ATLAS TRT Duke University Dubna, May Fuse Box Production Chiho Wang/Jack Fowler.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Setting up the Ricoh C305 Press F5 to start the Presentation
NSQP MEETING Valery AKHNAZAROV January 20th 2011 ISP PP0 Board Bonding Procedure Type 1 Type 3 Type 4peek Type 4 Assembly Name: ISP ASM Parts.
Activities Status and Plan for the week D. Giugni / INFN Milano D. Giugni Monday Meeting
I Wilmut CCLRC1 End-cap Engineering 8 September 2004 Ian Wilmut, RAL.
Moment Connection Requires Bolts Outside the Flanges
Commissioning of the ECAL A-side Irina Machikhiliyan, Reference data samples: #45498 PM HV nominal, LED LV = nominal, 5K of 5 TAE events, LED.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
NSQP X-1 ASSEMBLY Lessons learned Sébastien MICHAL January 30 rd 2012.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
Nov. 8, 2001M. Garcia-Sciveres -- PP0 & Service Panels1 PP0 & Service Panels 1.Introduction 2.Technical Status 3.Goals for 2002.
ATLAS Pixel Detector September 2003 Services E. Anderssen LBNL Service Connectivity from Module to PP1b Eric Anderssen LBNL Pixel Services Meeting, CERN.
November 04 Jason Tarrant CCLRC1 SCT EC Interconnects l Progress of SCT EC Interconnects »Services (Required for Disc Insertion 2004 / Integration 2005)
Activities Status and Plan for the week D. Giugni Monday Meeting
ATLAS 1 Beam Pipe Support Structure (BPSS) Services Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman, A Smith, LBNL S. Coelli,
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
David Nelson SQP E-board November 4, Pixel nSQP E-board Presented by David Nelson
8 June 2006A.Ciocio - SCTSG1 Status of Type IV Cables Cables production –resumed in February after 3 months stop –See ID week February ‘06 Delivery of.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
Dec
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
CERN, CT Workshop, ID Week, July 2 nd, 2007 Connectivity Workshop Conclusions: Lessons learned C12 Test Next future Claudia Gemme, CERN - INFN Genova Connectivity.
NSQP MEETING Valery AKHNAZAROV January 20th 2011 Laminate the NTC-HV and PS harnesses Assembly Name: PP1 Penetration Tape Parts requires:
1. Take HV harnesses with label (IHV2) and transfer on the Stacking table. 1.1 Inspect HV harnesses visually. 2.1 Insulate HV Flex with 3M™ VHB™ Tape.
Stave Tooling & Plans for Future Stave-building (Tim)
NSQP MEETING Valery AKHNAZAROV January 20th 2011 Corrugated Panel Bonding Procedure Assembly Name: ISP Corrugated Panel ASM Parts.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
1 PST Heater Panel Design The PST heater panels are internally redundant resistive circuits printed onto a Kapton sheet with an aluminum backing. They.
NSQP’s + design implications D. Giugni / INFN Milano D. Giugni nSQP's meeting 1.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
Schedule 24 September 2012 Christian Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
DBM status and path to the prototype D. Giugni / INFN Milano D. Giugni nSQP meeting
System Test Assembly 20th Oct 2009 M. Kurosawa. Current Status Performed system test with new FEM and software. Visit VICRISE on 13th Oct. 2-L and 8-R.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
Mauro Citterio - Mi meeting
Florian Buchsteiner (HEPHY Vienna)
Berkeley status Aug 10th, 2012.
University of Wisconsin
Service channels between Tracker and PP1
Module Loading Task Force Meeting October 21, 2004
Services – First Considerations Sigi Wenig / Nicolas Massol ATLAS Tracker Upgrade Workshop Valencia December 2007 Existing services (in cryostat.
MICE Target Report Video Conference 29/11/07
Ladder Assembly All tools and jigs produced Glue dispensing works
T1 Electronic status Conclusions Electronics Cards:
Activities Status and Plan for the week
G. Carboni for the Muon Group
Hall A Target Status 9/27/16 Dave Meekins.
DOM integration meeting
Chamber Design and Integration RE3/1 and RE4/1
Nearly the end of a long story...
Controller Rework.
Preparations for test of
Radiation Laboratory Meeting
UK CMS Oversight Committee Mtg
PP 14° Bi-Weekly meeting S1-Global, June 1, 2009
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
Flex studies status. Module flexes: 4 types; M4, M2, M1plane, M1mountain. constraint: components and bondings on the same side. Constraining for the wing.
UPPSALA UNIVERSITY_GERSEMI PROJECT
Radio Interface Board Status
Presentation transcript:

Activities Status and Plan for the week D. Giugni / INFN Milano Monday Meeting 2011-01-30 D. Giugni

Harnesses Stacking Set 0 left UN-USED Set 1 Set 2 Set 3 Decided so far to grab from the set only spares (if required). Considered not “for production” Set 1 General Set has been assigned to C34 (X0) One Harnesses non conformal  one taken from Set 2 Status All the Harnesses “Prepared” and tested IPS, IHV-NTC, OIH-NTC are Stacked and tested OPS stacking planned today Open Issues Need to repair the swapped harness Set 2 Set has NOT been assigned to nSQP Decided to put in hold: too many faults. Only 2 Harnesses “Prepared” and tested Need repairs Set 3 General Set assigned to C12 Status All IHV-NTC and OHV-NTC “Prepared” IHV-NTC, OHV-NTC Redy to stack (Today) Open Issues None D. Giugni Monday Meeting 2011-01-30

Soldering Agreed sequence IF PP0 OSP boards are not released: ISP C34 (X0) started ISP C12 (X1?) will start next Monday (new soldering team) ISP C56 (X2?) will start ~Feb 20th with the 3rd soldering team ISP C78 (X3?) will start when ISP C12 is done (< Feb 20th) D. Giugni Monday Meeting 2011-01-30

Post Soldering Assembly (General) This activities is referring, at the moment, only to the Trail C34 (X-1) Main operations: Bond ER bundle organizers at PP0 Bond E_boards peek pins Bond type0 cable stabilizer (only for ISP) Bond PP1 Flanges Bend harnesses at the dogleg Testing Load ER bundles (on the OSP bottom a/o ISP) and mount some ancillary parts Load the E-Boards (on the OSP bottom a/o ISP) Functionality test Secure the E-boards D. Giugni Monday Meeting 2011-01-30

Post Soldering Assembly (Status) OSP C4 (X-1) Completed. Panel is not functional due to the extensive wire cut required to put it together OSP C3(1) (X-1) Not done yet. Panel has been just released from the Soldering ISP C4 (X-1) Completed. Panel is functional. ISP C3 (X-1) Bond ER bundle organizers at PP0 Bond E_boards peek pins Bond type0 cable stabilizer (only for ISP) Bond PP1 Flanges Bend harnesses at the dogleg Testing Load ER bundles (on the OSP bottom a/o ISP) and mount some ancillary parts Load the E-Boards (on the OSP bottom a/o ISP) Functionality test Secure the E-boards D. Giugni Monday Meeting 2011-01-30

Final Assembly Referring only to the trial (X-1). Main operations: Set up the backbone Load the cooling pipes Load OSP L and R Load the ER_Bundles on the OSP’s Top Load the E_Board on the OSP’s Top Flip the assembly up side down Dress up the ER_Bundles at PP1 and on the Flowers Functionality Test Load the ENV sensors Flip the nSQP Secure the Top E_Boards Dress up the bundles at the PP1 can D. Giugni Monday Meeting 2011-01-30

Schedule for this week Schedule presented last week has been significantly reshuffled due to same missing parts. Mainly: OSP PP0 boards, some ISP Cx and all A side boards. PP0 stiffeners The original nSQP assembly sequence: has been changed to: C34 ISP  C12 ISP  ISP C56  ISP C78 … D. Giugni Monday Meeting 2011-01-30

Schedule for this week (2) Corrugated panel bonding: Delay in SLA parts. 2 panels done for the C34. Restart the production as soon as parts a delivered (this week?) . PP0 boards stiffening and Alu Block bonding Received C2, C5, C7 ISP board loaded. Received ISP stiffeners  Laminate and test the boards within this week ISP C12 (really needed by Fri!) Soldering Keep going with the ISP C34 (X0) HV-NTC (Main Team) Prepare the second Team by next Mo for the ISP C12. Post Soldering Assembly On ISP C3 (X-1): Bond cable stabilizer Bend Harness, Test, Load ER-Bundles and dummy E-Board On OSP C4 (X-1): Start the full procedure. Final Assembly Trial (X-1) Work out better flipping tool Load pipes in C3 Sort out ENV sensor location Be prepared to receive the ISP C3 and ISP C3