Jeffrey Keirn Illinois Department of Transportation

Slides:



Advertisements
Similar presentations
Moline Bridge Closure Unclassified ZDec09 US Army Garrison – Rock Island Arsenal Moline Bridge Closure.
Advertisements

Ohio Department of Transportation District 9 I RONTON -R USSELL B RIDGE R EPLACEMENT
The Ohio Department of Transportation 1 I-280 Trench Project Public Meeting Monday, October 20, 2008 Ted Strickland, Ohio Governor James Beasley, P.E./P.S.
State Project No /195 Rehabilitation of Bridge Nos and I-84 over Marion Ave Southington, Connecticut Rehabilitation of Bridge Nos.
John Malbon, CEO, PAPCO & Hampton Roads Member, Virginia Commonwealth Transportation Board May 28, 2014.
LEARN Charter School Network. Who We Are Our Mission: to provide children with the academic foundation and ambition to earn a college degree Strong Demand.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
Riverside County Transportation Commission 91 Project Update California Transportation Commission December 10, 2014.
The Way Forward – A 21 st –Century Transportation Plan Frank DePaola, P.E. Administrator, Highway Division April 2013 Massachusetts Department of Transportation.
Bridge Rehabilitation W Interstate 290 over CSX Railroad and 4 City Streets I-290 Viaduct Reconstruction.
Congressional District Projects New CD-1 Central Park Blvd/I-70 — $47.2 million project funded through the American Recovery and Reinvestment Act (ARRA).
New Mississippi River Bridge EWGCOG Presentation New Mississippi River Bridge EWGCOG Presentation January 8, 2007.
Poplar Street Bridge City Arch River Consultant Presentation December 16, 2011 Room 160, St. Louis District Office.
Route 364 (Page Ave. Extension) The Missouri Department of Transportation.
Public Works EVANSTON ILLINOIS September 29, 2014 Dodge Avenue/ETHS /Mason Park Bike Improvements Project Sat Nagar, P.E. Assistant Director of Engineering.
Page Avenue What has it done for the region? A comparison of traffic volumes from Fall 2003 to Fall 2004 What has it done for the region? A comparison.
Nick Johnson, PE Senior Project Manager October 1, 2012.
Mississippi River Bridge An Analysis of Alternatives DRAFT Final Report Presentation January 31, 2007.
US Army Corps of Engineers BUILDING STRONG ® Mississippi Valley Division New Madrid Earthquake MS River Navigation Scenario.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
Where the Missouri River Meets the Mississippi River Edward "Ted" and Pat Jones-Confluence Point State Park.
1 Mississippi River Bridge An Analysis of Alternatives Expert Panel Review Sharon Greene & Associates.
DRAFT 1 Significant Changes for the 2006 Constrained Long-Range Plan March 3, 2006.
Planning and Design in Rockford: Morgan Street Bridge Project 315 North Main Street · Rockford IL
Center for Transportation Excellence June 20 – 22, 2011.
I-95 Access Study Fredericksburg Area Project Status Update February 12, 2010.
Design Manager: Chris Thomas CEAL July 17, Interstate 8 (I-8) to Interstate 5 (I-5) Connector Widening and Auxiliary Lane Project.
Pierce Butler Lexington Parkway Bicycle Connection Presented by: Mr. Michael Recycles Bicycles Sponsored by: Mr. Michael Recycles Bicycles District 11.
The Five Themes of Geography
STA US-30 Presentation for TRAC – October 13, 2015
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
Row No. Des # Sponsor Route Work Category Work Type Location County Des Length Federal Fund Type Phase Year Total Cost Federal Funds Non-Federal Funds.
February 19, 2007 Unsolicited New Mississippi River Bridge Public-Private Partnership Proposal presented to the Missouri Department of Transportation June.
PROJECT UPDATE LRT ALIGNMENT. LRT ROUTE MAP ALIGNMENT OVERVIEW B-line Primarily centre-running; segregated by curbed barrier 13 stops Majority of stops.
1. 2 February Alliance Workshop St. Louis Regonal Freightway Alliance Needs Analysis and Freight Development Committee Terminal Rail Association.
Welcome!. OVERVIEW Limited access reconstruction/relocation of US 31 from US 30 to US 20. The project area includes the communities of LaPaz and Lakeville,
Preliminary Estimated Cost
Arizona Forward Update
Pioneer Road Relocation and Reconstruction Project
Bicycling in Minneapolis Bicycle Master Plan/Protected Bikeway Update
Getting to the Walters Art Museum, Sunday, September 18th
Center City Connector 101.
Infrastructure Investment Needs
ELM AVENUE STREETSCAPE & SAFETY IMPROVEMENTS (University Parks Dr
Bring Back Broad: A City of Mobile Complete Streets Initiative
STREETS & STORMWATER DEPARTMENT
Texas Department of Transportation
I-84 Waterbury Project Project Overview July 2017.
CR184 (Quintette Road) Bridge #480045
Florida Transportation Commission FY 2009
Lenoir County Comprehensive Transportation Plan DRAFT Maps and Recommendations John A. (Andy) Bailey April 16, 2018.
Highway 169 Bridge Replacement & Pavement Resurfacing
Absolute & Relative Location
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Housing + Neighborhood Resource Summit
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
STATE SUEE AND ONE WAY CORRIDORS
25th Avenue Grade Separation
25th Avenue Grade Separation
Status Report on Rochester’s DMC Transportation Plan
projects update ATLANTA district
Contract 60X10 Informational Meeting Weber I-55
Lenoir County Comprehensive Transportation Plan DRAFT Maps and Recommendations John A. (Andy) Bailey April 9, 2018.
Southern Bridge Project Brown County Executive
Tampa Bay Rays Stadium:
Spring field Airport to Fort Leonard Wood
2019 Construction Season Preview
National Organization of Minority Engineers Leadership Summit
Presentation transcript:

Jeffrey Keirn Illinois Department of Transportation Deputy Director Region 5 Engineer District 8

District 8

Improvements in East St. Louis Area

Relocated IL Route 3 St. Clair Ave. to River Park Dr. Cost: $30 mil 85% Complete Anticipated Completion – Summer 2016

Relocated IL Route 3 St. Clair Ave. to River Park Dr.

Martin Luther King Connector Ramp MLK EB to I-55/64 WB Cost: $27.7 mil 25% Complete Anticipated Completion – Fall 2017

Overall Plan of the Martin Luther King Connector Ramp

Access from New Mississippi River Bridge to IL Route 3 South

Poplar Street Bridge Improvements Cost Estimate: $78 million Connection to Depressed Area Dual Lanes to I-55/44 WB Deck Rehab Future Dual Lanes to PSB Future 5th Lane on PSB (EB) Future EB Deck Rehab

Improvements in East St. Louis Area

Questions ???

Overall Relocated IL Route 3 North of Broadway Ave. in Venice to North of Monsanto Ave. in Sauget