Project General Data Beneficiary: Rosenergoatom

Slides:



Advertisements
Similar presentations
COMPANY MAINTENANCE MANUAL
Advertisements

Antti Piirto The first EPR under Construction in Finland International Nuclear Forum 2008 ”Bulgarian Nuclear Energy – National, Regional and.
Visit Us At Booth #306 J2 Engineering, Inc. J2 provides Construction and Environmental Services and is a verified Service-Disabled Veteran-Owned Small.
1 Belene NPP Project Configuration Management Presented by Alexey Matveev Varna, May
PLANT DESIGN (I) Prof. Dr. Hasan farag.
2.3.9 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Purging Containers & Injecting Methanol Prior to.
Summer Co-op Experience: OPG Aditi Garg. Darlington Nuclear G.S Located in Bowmanville, ON.
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
Gas Transmission Pipelines
May 22nd & 23rd 2007 Stockholm EUROTRANS: WP 1.5 Task Containment Assessment IP-EUROTRANS DOMAIN 1 Design WP 1.5 Safety Assessment of the Transmutation.
PEP-II Ramp Down to a Minimum Maintenance State J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
1 FUTURE EXPLOITATION OF THE EAST AREA Infrastructure and Equipment - Civil Engineering issues. Jonathan Carr – GS / SE.
IAEA Perspective and Lessons Learned in Shipping HEU Spent Fuel to Russia Institute of Nuclear Materials Management 48 th Annual Meeting July , 2007.
2013 NATEF Task Area A-7 Heating, Ventilation, and A/C A. A/C System Diagnosis & Repair B. Refrigeration System Component D & R C. Heating, Ventilation.
TECHNICAL ASSOCIATION OF THE EUROPEAN NATURAL GAS INDUSTRY Development of a Eurogas-Marcogaz Methodology for Estimation of Methane Emissions Angelo Riva.
CHAPTER 4 CPB 20004: Plant Utility n Maintenance
BELENE NPP Reactor plant V-466B FSUE OKB «GIDROPRESS» Ryzhov S.B., Ermakov D.N., Repin A.I. May, 2008.
/0309 Copyright ©2003 Business and Legal Reports, Inc. BLR’s Safety Training Presentations Lockout/Tagout Refresher 29 CFR
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Authorization and Inspection of Cyclotron Facilities Authorization for the Decommissioning of the Facility.
TS-CV contracts case study LHC pipelines and HVAC for Experimental Areas R. Principe, J. Inigo-Golfin.
AREVA: Steps towards a global leadership in the energy industry
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
Experience of fuel operation at Russian NPPs N.M. Sorokin, Yu.V. Kopyov, V.E. Khlentsevich, А.К. Egorov N.M. Sorokin, Yu.V. Kopyov, V.E. Khlentsevich,
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
TACIS Project: R8.01/98 – TRANSLATION, EDITING AND DIFFUSION OF DOCUMENTS (Result Dissemination) Probabilistic Safety Analysis Technology (PSA) TACIS R3.1/91.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
MODULE “PROJECT MANAGEMENT AND CONTROL” WASTE MANAGEMENT SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
R 2.09/96, LBB of VVER-1000 NPP TACIS Project: R8.01/98 - DISSEMINATION OF RESULTS: "TRANSLATION, EDITING AND DIFFUSION OF DOCUMENTS" Tacis R2.09/96, “LBB.
C O N T R A C T O R I N F O R M A T I O N E X C H A N G E Reister CE Presentation 1/98 1 Program Elements and Related Activities Rich Reister U.S. Department.
Tacis 2.02/95 on VVER 440 RPV Integrity TACIS Project: R8.01/98 – TRANSLATION, EDITING AND DIFFUSION OF DOCUMENTS (Result Dissemination) Tacis R2.02/95,
TACIS Project: R8.01/98 – TRANSLATION, EDITING AND DIFFUSION OF DOCUMENTS (Result Dissemination) Improvement of the fission product retention system at.
Regional Meeting on Applications of the Code of Conduct on Safety of Research Reactors Lisbon, Portugal, 2-6 November 2015 Diakov Oleksii, Institute for.
WELCOM TO EGIQC. EGIQC Engineering Group For Inspection & Quality Control.
Regional Air Source Heat Pump Performance and Savings Research and Evaluation Project Proposed Scope of Work and Estimated Budget February 10, 2004.
Tacis 1.14/91 on life-time evaluation TACIS Project: R8.01/98 – TRANSLATION, EDITING AND DIFFUSION OF DOCUMENTS (Result Dissemination) Tacis R1.14/91,
2-6 November 2015 Lisbon, Portugal Regional Meeting on Applications of the Code of Conduct on Safety of RR's 1 Some aspects of the Code of Conduct on the.
0 Design Change Construction & Completion Management (Outline and related procedures) Hanul NPP Engineering Center.
Mike Andrews August 17, Week 16 NuMI Activities Leak testing of DI bottles & Casks Complete all bottles & casks RAW Impulse line upgrade Finished.
E- source kick-off meeting e- Source RDR- Conventional Facility & Siting Overview Fred Asiri/SLAC.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Licensing Renewal of Operating License Periodic.
Edward S. Kubinsky Jr. CROMPCO, LLC
Status and Prospect of Korean Korea Electric Power Research Institute
Sun City Lift Station Odor Control Improvements
Sources of Energy ELECTRICAL MECHANICAL PNEUMATIC FLUID AND GASES
János Krutzler Hungarian Atomic Energy Authority
Radioactive waste repositories
BASIC PROFESSIONAL TRAINING COURSE Module XIV Surveillance Case Studies Version 1.0, May 2015 This material was prepared by the IAEA and co-funded.
Clinical engineering Lecture (7).
Earthquake effects on health care facilities
Third Party Activities for FH1 Project
Experience in Conformity Assessment of Products and Services  for Russian NPPs and Overseas Nuclear Power Plant New Builds Yury Meltsov Aug
Quality control of equipment manufacturing for nuclear facilities
Module 3 Domestic Heating/MMA Welding
WENRA Current activities of WENRA 4th GNSSN Steering Committee Meeting
Regulatory Control Training Workshop
Session Name: Ageing Management
RCF Plenary Session 21 September 2018
USNRC IRRS TRAINING Lecture18
Session Name: Lessons Learned from Mega Projects
Summary of the Earthquake and Situation of the Kashiwazaki-Kariwa NPP
4th ISOE European Workshop on Occupational Exposure Management at NPPs Lyon, France, March 2004 Kirsi Alm-Lytz Radiation and Nuclear Safety Authority.
NEW COMPLIANCE REGULATIONS
Passenger Mobility Statistics 21 May 2015
HAZOP Guidewords Base Set
SAFETY, TOOLS & EQUIPMENT, SHOP PRACTICES
INTERFACES BETWEEN NATIONAL LEGISLATION AND DIRECTIVE 97/23/EC
Automotive Technology Principles, Diagnosis, and Service
Gas Transmission Pipelines
Permit to Work Process​ HSE GROUP RULE (CR-GR-HSE-402)
Presentation transcript:

Project General Data Beneficiary: Rosenergoatom Contractors: Empresarios Agrupados et.al. Local Subcontractor: MOCHT Sector of activities: Design Safety Sites: Kola & Novovoronezh NPP Installations: VVER 440/230 Status: Completed Budget: 827 000 € Duration: 20 months

Russian Organisations involved   The following Russian Organizations were involved, assuring an approach likely to be shared globally in the Russian Nuclear Community: -Concern «Rosenergoatom» the Beneficiary -Kola NPP and Novovoronezh NPP; -FSUE «Atomenergoproekt» (AEP), -Atomtechenergo (ATE) -VNIIAES -RRC KI (Kurtshatov Institute), -OKB-GP (Gidropress), -Regulatory Authority of RF Gosatomnadsor (GAN RF).

Objectives of the Project With this project the leak tightness of the confinement in Kola and Novovoronezh NPP (VVER-440/230-type reactors) was to be analyzed Current Russian Nuclear Regulatory Requirements had to be observed Special attention had to be paid to relevant improvements made in Bohunice and Kozloduy. Concrete proposals for improvement had to be defined.

Scope of the Work to be performed (1) The project covers the following phases: Review and estimation of leak tightness state of structures and equipment installed to provide leak tightness of the Hermetic Boundary Systems (HBS), using design and construction documentation as well as the previous tests results; Elaboration of proposals and guidelines to draw up documents, which describe criteria and methods for HBS improving; Review of Local and Integral Tests Programs to estimate the leak tightness state of HBS structures and equipment of the NPP Units mentioned above.

Scope of the Work to be performed (2)   Elaboration of criteria to provide the following: - comparison of requirements of Regulatory Authorities of Russia and Western countries and create a unified approach; - analyzing the geometrical characteristics of the confinement penetrations; - modification of the confinement using methods adopted at NPP Bohunice in Slovakia and NPP Kozloduy in Bulgaria; - adaptation of technical facilities and review leak tightness Procedures used at Western NNP, for applying at these four Russian units as far as possible; - sharing the operation experience, obtained during modernization in Slovakia and Bulgaria

Areas of leak tightness activities (1)   Proposing changes or using new leak tightness elements or compositions; Proposing more effective Procedures for inspection and finding the local leakage points; Recommendations for installation of permanent devices for periodic examination of local tightness; Proposals for modification or modernization of design of penetrations and other leak tightness equipment; Procedures of Local and Integral tests; Proposals for confinement modernization; repair Procedures Tighten leaks as far as possible within the given project’s budget

Areas of leak tightness activities (2)   Criteria on leak tightness were defined and adopted as follows: Decrease the leakage as low as possible or Total removal of leakages through all types of penetrations by the following means: Repair of damaged penetrations; Use of more effective hermetic materials being better adapted for surrounding conditions; Use of new locking and leak tightness systems; Removing standby penetrations as much as possible; Replacement of penetrations for more tighter structures.

Methods applied to measure leak tightness   First stage: Apply a maximal pressure of 100 mm water column, using ventilation systems П-2, П-4, fulfill HBS inspection, find and remove the defects; Second stage: Increase the total pressure inside HBS, up to maximal level of 1,3 kg/cm2, inspect confinement pressure-retaining boundary and find the defects and remove the defects found. Apply a vacuuming test with systems В-2, В-4, inspection and finding defects inside HBS;

Main components found, affecting leak tightness Electrical penetrations (because of their large quantity and unqualified leak tightness technology, using hermetic, which deteriorates with time); KUD valves Shaft leak tightness unit of re-circulating fan as the shaft leak tightness system does not meet requirements of leak tightness at shaft rotation; Welded units of hermetic lines; Rubber of sealing. Leak tightness rubber sealing in leak–proof doors, ventilation valves, valve ducts, ducts equipment and etc. have major leakages, due to aging Ventilation systems isolating valves; Shut-off valves of process systems.

Equipment to be tightened with priority (1)   The following equipment was considered to be most important for tightness: Pipe penetrations I & C Penetrations Electrical Penetrations Reactor shaft cover dome Fuel storage pond Hatches above the main cooling pump Hatches above Steam Generator and recycling ventilation system

Equipment to be tightened with priority (2) Welded joints of hermetic pipe lines Leak tightness doors Valve shaft extensions Steam dump ventilation shafts Pipelines isolating valves KUD-Valves Penetrations of air ducts and ventilation valves

Summary (1) As a result of the detailed review of the design documentation of the a.m. NPP Units, Tests Procedures, Test Programs and Inspection of the Units, the confinement’s existing leakages were significantly decreased by the following: Elaboration of leak tightness criteria and methods; Review and approval of Procedures, programs and methods to test the tightness; Elaboration of recommendations for separate items on the confinement boundary for increasing leak tightness extent up to the level required and sealing for new constructions and materials;

Summary (2) Replacement of material and sealing for new constructions and materials; Local tests for leakages indicate and further removing; Integral tests to value the leakages and compare with set leak tightness criteria.