US Army corps of engineers Levee Safety and 408 Update

Slides:



Advertisements
Similar presentations
The Role of Levees in the National Flood Risk Management Program Pete Rabbon June 19, 2008 Hazards Caucus Alliance.
Advertisements

U.S. Army Corps of Engineers - Levee Safety Program Engineer Circular Development US Army Corps of Engineers BUILDING STRONG ® Michael Bart, P. E. Chief,
Using Mitigation Planning to Reduce Disaster Losses Karen Helbrecht and Kathleen W. Smith United States: Federal Emergency Management Agency (FEMA) May.
US Army Corps of Engineers BUILDING STRONG ® COL Richard P. Pannell District Commander, Galveston District U.S. Army Corps of Engineers United States Army.
US Army Corps of Engineers BUILDING STRONG ® Suburban Flooding: Finding regional solutions to a growing problem Imad Samara Project Manager and Silver.
Flood Risk Management Program Ed Hecker, Chief, Office of Homeland Security National Levee Summit February 2008 St Louis, MO.
Engineer Circular Requests to Alter USACE Projects
Hydraulic Screening and Analysis Needed for USACE Review
Module 23 STEPS 15 & 16 Preconstruction Engineering and Design (PED) and Other Decision Documents Civil Works Orientation Course - FY 11.
NATIONAL LEVEE DATABASE INVENTORY/INFORMATION PROGRAM.
Briefing to the Central Valley Flood Protection Board on Status of the FCSA July 12, 2013 Central Valley Integrated Flood Management Study.
ASFPM – May 24, 2012 CASE STUDY – 408 PERMITTING AND LEVEE ACCREDITATION FOR WATERLOO, NEBRASKA ASFPM MAY 24, 2012 Presented by Randy Behm, PE, CFM Lalit.
Module 19 STEP 9 Completion of the Feasibility Study Module 19 STEP 9 Completion of the Feasibility Study Civil Works Orientation Course - FY 11.
US Army Corps of Engineers BUILDING STRONG ® North Atlantic Coast Comprehensive Study U.S. Army Corps of Engineers Coastal Storm Risk Management Planning.
An update from the National Committee on Levee Safety Presented to the TWCA by Karin M. Jacoby, PE, Esq. June 17, of 14An Involved Public and Reliable.
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Meeting March 28, 2006 Item No. xx Supp. Meeting.
ICH V1 An FDA Update Min Chen, M.S., RPh Office of Drug Safety Center for Drug Evaluation and Research FDA January 21, 2003.
Doug Bellomo April 6, NFDA Retreat & Conference “Risk MAP--Foundation, Transition, Integration” Risk MAP: An Update to NFDA.
Relevant, Ready, Responsive, Reliable 1 Addressing the Flood Risk Challenge.
1 Slide1 THINGS WE NEED TO UNDERSTAND ABOUT LEVEES: CURRENT INITIATIVES AND FUTURE DIRECTIONS Presentation to Association of State Flood Plain Managers.
Corps of Engineers Levee Safety Program Levee Safety Program Manager
Ventura County Levee Systems Levee Certification Compliance Efforts Presentation to the Ventura County Watershed Protection District Board of Supervisors.
Developing a National Levee Safety Program Mike Stankiewicz - NCLS Arizona Floodplain Management Association November 3, Update on the National.
National Levee Safety Act, Title IX, WRDA 2007 Update for Levee Summit Eric Halpin, P.E. Special Assistant for Dam and Levee Safety Headquarters, US Army.
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Policy and Staff Briefing March 14, 2006 Item No. xx Supp.
Millbrook Dam Environmental Assessment Study Dan Marinigh CAO/Secretary-Treasurer Otonabee Region Conservation Authority October 20, 2015 Otonabee Conservation.
BUILDING STRONG ® Levee Safety Program  Levee Safety Program Implementation Guidance provided by HQUSACE in 2007 (Post Hurricane Katrina) ► Designate.
US Army Corps of Engineers BUILDING STRONG ® Emergency Response Policy Revision Update ( ER & EP ) Jeffrey Jensen CECW-HS USACE Flood Risk Management.
USACE Flood Risk Management and Silver Jackets Workshop Sandra K. Knight, PhD, PE, D.WRE Deputy Associate Administrator for Mitigation, FEMA August.
Rebuilding the System Reducing the Risk California Water Plan Plenary Session October 22-23, 2007.
NSDI Strategic Plan Update National Geospatial Advisory Committee Meeting December 11, 2013.
US Army Corps of Engineers Sacramento DistrictIntroductionIntroduction Sacramento River Bank Protection Project: Phase II Supplemental Authorization –
U.S. Army Corps of Engineers Levee Safety Program US Army Corps of Engineers BUILDING STRONG ® December 2013 Update for the NAFSMA Annual Meeting.
US Army Corps of Engineers BUILDING STRONG ® Jody Fischer P.E. Levee Safety Program Manager Los Angeles District U.S. Army Corps of Engineers 14 December.
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
K1 Proposed National Levee Safety Program An Introduction for the Tribal Assistance Coordination Group May 12, 2011.
US Army Corps of Engineers BUILDING STRONG ® Levee Safety Policies Supporting a Sustainable Flood Risk Management Program Eric C. Halpin, PE Special Assistant.
Draft Central Valley Flood Protection Plan Investment Strategy
Operationalizing the National Disaster Recovery Framework Resources for State Governments Andrew O’Neil, Interagency Coordination, FEMA
Preliminary Assessment Tribal Emergency Response Preparedness
Implementing SMS in Civil Aviation: the Canadian Perspective
Growth Management Amendments Land Use & Transportation
USACE Resilience Program
Eric Smith Assistant Administrator Logistics Management Directorate
Tribal Hazard Mitigation Planning
National Emergency Communications Plan Goal 2
Ryan Cox, Mitigation Planning Supervisor, NC Risk Management
John Martin Reservoir Master Plan Revision
9/16/2018 The ACT Government’s commitment to Performance and Accountability – the role of Evaluation Presentation to the Canberra Evaluation Forum Thursday,
Health Resources and Services Administration (HRSA)
Investing in Innovation (i3) Fund
Research Program Strategic Plan
Action Request (Advice) Registry
Project Plan Template (Help text appears in cursive on slides and in the notes field)
Creating a P.L Plan.
Office of Emergency Communications
Office of Secretary of Defense
Unidata Policy Committee Meeting
Continuity Guidance Circular Webinar
Roadmap for Programme of Work
FC 335 Safe and Supportive Schools Competitive Grant Webinar
Reliability Standards Development Plan
SNA Work Plan and Budget Revision 2015 (additional activities)
Jim Edward Acting Director Chesapeake Bay Program Office May 23,2018 EPA’s Draft Final Phase III WIP Expectations.
Revolutionize USACE Civil Works
2019 Spring & Fall Timeline May 10, 2019
PHMSA Update for the API RP1162 Rewrite Team
USACE infrastructure team update
New Hanover Comprehensive Plan
DEVELOPMENT IMPACT FEES AB 1600 UPDATE
Presentation transcript:

US Army corps of engineers Levee Safety and 408 Update Presentation for the National Waterways Conference September 2017 Eric Halpin, Deputy Dam and Levee Safety Officer, HQ USACE Tammy Conforti, Special Assistant for Levee Safety, HQ USACE

Status on the National Levee Safety Initiative Focus on traditional authorities related to the USACE Levee Safety Program Moving forward on mutually beneficial activities USACE Levee Safety National Levee Safety Inspections, Risk Assessments, Risk Communications, Policy & Guidance, Management, Technology Reviews National Levee Safety Program is authorized but not appropriated Though authorized by Congress, a National Levee Safety Program has not yet been implemented. (See Title IX of the Water Resources Development Act of 2007, as amended by Section 3016 of the Water Resources Reform and Development Act of 2014 for a more complete understanding of this effort). No timeframe has been established for implementation of a National Levee Safety Program however, there are several USACE activities that are beneficial to a National Levee Safety Program. To demonstrate, a Venn diagram drawn here to represent the USACE Levee Safety Program and a National Levee Safety Program. Each circle is intended to represent the relative size of the programs. The USACE Levee Safety Program has been invested over $500 M to establish a National Levee Database – a database of the Nation’s levees, conduct levee inventory, inspections, risk assessments; and develop a program that emphasizes life safety, risk-informed decision making, and increased awareness of the benefits and risks associated with levees. The National Levee Safety Program is a huge program that includes National Committee on Levee Safety, National Guidelines, Grants to States, State and Tribal Program Guidelines, Levee Rehab Fund, Reports to Congress, and Levee Inventory and Review. The two programs overlap (the scopes and benefits are mutual) are shown. Mutually Beneficial Activities that are Both Authorized & Appropriated

Levee Safety Hot Topics

NEW Over-arching levee policy (EC 1165-2-218) Organized around the Risk Framework Provides directive policy (long-term) References other documents to detail procedures Supersedes: Previously issued memos and other interim guidance USACE previous NFIP Accreditation guidance (EC 6067)

Risk assessments – when are they required? Primarily selected by risk/some other considerations Funded by Program Timing set by Program Portfolio Management Proposed by sponsors or major rehab Selected by OMB Usually cost-shared Planning Studies Follow studies, Section 408 Design deficiencies Design Construction Cost-shared USACE O&M NFIP Accreditation Post implementation Benchmark risk assessment in lieu of screening Changed Condition Risk Assessment

Path Forward Internal Review Agency-wide Review ATR LSSC LSOG FEMA Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar-18 Apr-18 May-18 Path Forward Internal Review Agency-wide Review ATR LSSC LSOG FEMA External Review Sponsors Stakeholders International Levee Partnership Publication Internal Review – 60 days for internal review beginning early June External Review – 60 days for external review November/December. Will try to align it with external review of Inspection Checklist. Publication – Spring 2018 Comment Analysis and Summary Revisions External webinars Comment Analysis and Summary Revisions Final Leadership Review Internal & external webinars Communication products

National levee database – levee inventory Total Levee Inventory: 8,900 levee systems = ~29,000 miles of levees Overview of the NLD inventory as of September 2017. New Website External Release – November 2017

National levee database - Update This is graphic shows how the NLD and the associated USACE tools (e.g. USACE Levee Inspection System and USACE Levee Screening Tool) and data fit together. The USACE Levee Inspection System (LIS) is a tool that USACE has used to perform levee inspections on 14,000 miles of levees. The “NLD” will soon be comprised of the inspection tool and the screening tool and a dashboard feature. All inspection data and screening data will be located within the NLD such that it can be reviewed or searched. Each State will have the ability to generate their own specific dashboard within the NLD by using a series of drop down menu options. And finally, the most important point of this slide, you need data to make all those shared tools and functions be relevant. All the tools and great capabilities in the NLD have to have good data to be effective. The focus of the Inventory effort is to populate that information in the NLD – and remember the continuing data slide – to keep adding data and information. Keep the NLD a living database.

national levee Inventory and Review - initial engagements Federal Agencies National Park Service International Boundary Water Commission National Fish and Wildlife Service USDA and FEMA States California Illinois Ohio Pennsylvania Texas This is a list of states that has been engaged previously (as the state reached out to USACE to conduct pilots). California shared its levee database which makes up the majority of the Non-USACE levee systems. Pennsylvania inspections conducted this year are shown.

Summary of the findings (due out fall 2017) Executive Summary Section 1 : Introduction Section 2 : USACE Levee Portfolio Characteristics Section 3 : The USACE Levee Safety Program Risk Framework Section 4 : Risk Characterization of the USACE Levee Portfolio Section 5 : Hazard: What are the Hazards and How Likely are they to Occur? Section 6 : Performance: Understanding Levee Characteristics & Components Section 7 : Consequence: Who and What are in Harm’s Way? Section 8 : Mitigating Risk Drivers in the USACE Portfolio The USACE portfolio report outline is shown here and is planned to be released in the Fall 2017. This Levee Portfolio Report shares our current understanding of the portfolio of levee systems within the USACE Levee Safety Program. Managing this portfolio of levees requires an understanding of the levees in the portfolio, the risk management approaches USACE uses to understand and manage the portfolio, and the roles of USACE, other federal agencies, states, tribes, regional districts, and local communities in assessing, managing, and communicating levee-related flood risk. Since 2006, USACE has been working to establish a comprehensive inventory, inspection, and risk assessment of all levees in its portfolio. With the inventory and initial inspections complete, the first round of risk assessments on the entire portfolio is expected to be completed in 2018. This inventory, inspection, and assessment effort provides a much more complete picture of the USACE Levee portfolio than we have ever had: where the levees are (inventory); their condition (inspection); and the flood risk associated with the levees (assessment). This report aims to collect the best available information on the USACE levee portfolio and: - Increase the understanding of the benefits and risks associated with levees in the USACE portfolio for all stakeholders by summarizing portfolio - Provide a summary of risk factors associated with the USACE levee portfolio so that all those with levee responsibilities, including USACE, can make informed risk management decisions on programmatic investments, including policy and technical guidance and research and development. - Establish a baseline set of information on the USACE levee portfolio, including the condition and risk associated with the full portfolio and various segments of the portfolio to enable future trends analysis.

Hazard: What are the hazards and how likely are they to occur? Levees in the USACE portfolio range from a design overtopping ACE of 50% to 0.02% -- in colloquial terms, from the 1-in-2 chance to the 1-in-5,000 chance of occurring in any given year. The majority of the levee systems within the portfolio have an overtopping ACE of 0.5% or less (1-in-200 chance). Overtopping frequency alone doesn’t tell the story about levee risk. For example: USACE – 272 NFIP Accredited Systems (only 12% of the USACE Portfolio). About 1/3 of these NFIP Accredited Systems are characterized as very high to moderate risk. Risk tells a different story as it goes beyond the levee itself and considers the consequences behind the levee.

Consequences: people behind levees % of Population within the USACE Levee Portfolio by range of population residing behind levee systems 2,100 miles 2,400 miles 3,100 miles 3,200 miles 1,800 miles 1,300 miles Approximately 11 million people live and work in the area behind USACE portfolio levees; approximately the same population as the combined population of Los Angeles, Chicago, and Houston. However, this population is not equally distributed behind all the levees. Some leveed areas significantly more urban than others-- 86 percent of the 11 million people are concentrated behind just 154 levee systems. Over 11 million people live and work behind levees within the USACE portfolio Source: LST March 2017

Consequences: property behind levees Over $1.3 trillion in property value behind levees within the portfolio 58% of levee portfolio by length has greater than $100 M in property value behind it Mirroring population, there are a relatively small number of highly urban levees (146 levee systems) that represent areas with property value in excess of $1 billion, with the majority of levees (1,140 systems) having less than $100 million in property value behind the levees Source: LST March 2017

Consequences: Who and What are benefiting from levees? Other infrastructure behind the levees in the portfolio…. National Historic Sites (i.e. National Mall) Over 300 Colleges and Universities 34 Major Sport Venues 25% of the National Daily Refining Capacity USACE portfolio levees reduce the risk of flooding to some of our most vital infrastructure. From roads and schools, to police and fire stations, to historical sites and national treasures, there are countless structures that provide invaluable services to our communities and nation that are located behind levees. These structures help to sustain our economy and provide venues for recreation, among other functions.

Mitigating Risk Drivers in the USACE Levee Portfolio $21B is estimated needed to address risk factors associated with the levee portfolio Emb. Stability Culverts Emb/Fnd Seepage Floodwalls $13 B Emb. Erosion $8 B The extrapolated portfolio cost to address risk drivers and improve evacuation effectiveness for very high, high, and moderate risk levee systems in the USACE portfolio ranges from $6.5 billion to $38 billion, with an expected cost of about $21 billion. The upper and lower bound ranges of estimated cost show the range in uncertainty of the estimate. The expected cost of $21 billion is broken down into approximately $13 billion for structural improvements to mitigate risk drivers for breach prior to overtopping, approximately $8 billion in armoring of levees to reduce the risk of breach following overtopping, and about $300 million to improve evacuation effectiveness. $300 M

Section 408 US Army Corps of Engineers Update Streamlining Actions: More scalable More delegation of decisions Reduce redundancies and/or improve integration with Regulatory Better define and constrain when Section 408 applies Challenges Resources for timely reviews Scalable/nonprescriptive requirements leads to inconsistent implementation between districts Still learning and improving, but there is demand for instant change Coordination with USACE on status updates

Background 33 USC 408 (Section 408) Provides USACE authority to grant permission to alter a USACE civil works project if Does not impair usefulness of the project Not injurious to the public interest Current USACE policy for granting permission is EC 1165- 2-216

Benefits of Section 408 Provides others a mechanism to alter/repair/rehabilitate an existing project without reauthorization Ensures Civil Works projects continue to deliver the public benefits intended Allows for ensuring compatibility of new infrastructure with existing federal projects Ensures alterations do not have unintended negative impacts to the public

Why are we here? Heightened attention on infrastructure projects Desire for streamlined processes and improved coordination among Federal agencies There is an increase need for information, timelines, status, and upward reporting on high visibility projects Fast-41/Dashboard/Pipelines/Transportation

Basic Steps Request Package Review and Decision Initiation Pre-Coordination Written Request (non-fed sponsor endorsement required) Initiation Coordination Compile Required Documentation Request Package Formal Reviews Document Decision and Conditions Review and Decision WRDA 2016 Timelines 30 days, determine package is complete 90 days, make a decision NTE 120 days

Interim Guidance Nov 2016 – delegated several HQ level decisions to Divisions. Jun 2017 – clarified application of 408 related to “navigable waters” reducing number of activities needing 408 permission. Jun 2017 – issued guidance to implement contributed funds authority in WRDA 2016 Aug 2017 – District Commanders now have authority to delegate their 408 decisions.

Further reduce HQ level decisions Future Changes Expand the type of project sponsor O&M activities that do not require Section 408 Reduce internal duplication of effort with other processes (Regulatory, Operations, Real Estate) Further reduce HQ level decisions Create an option for multi-phased reviews Remove 60% design requirement Establish timelines for reviews per WRDA 2016 Create tracking database (Expect draft 408 guidance out for broad review before the end of the calendar year).

QUESTIONS? Eric Halpin, P.E. Deputy Dam and Levee Safety Officer Chief, Dam and Levee Safety Engineering Branch (202) 761-7662 TEL (202) 257-6183 CEL eric.c.halpin@usace.army.mil U.S. Army Corps of Engineers Headquarters 441 G Street NW, Rm 3E65 Washington, DC 20314-1000