John T. Seeman DOE PEP-II Operations Review April 26, 2006

Slides:



Advertisements
Similar presentations
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
Advertisements

Chubaka Producciones Presenta :.
FACET: A National User Facility Carsten Hast SLAC National Accelerator Laboratory.
1 PEP Status M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 6 Summary.
PEP- II Linac Accelerator Systems Department The PEP-II B-Factory Accelerator John T. Seeman Assistant Director Particle and Particle-Astrophysics Division.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
Accelerator Systems Division FACET Project Management John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
PEP-II Status and Outlook John T. Seeman For the PEP-II Team SLAC EPAC Meeting June 12, 2003.
PEP- II Linac Accelerator Systems Department The PEP-II Overview John Seeman SLAC Particle and Particle-Astrophysics Directorate PEP-II MAC Review January.
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
SLAC Accelerator Department The PEP-II Accelerator Status and General Plans John T. Seeman Assistant Director of the Technical Division Head of the Accelerator.
SLAC Accelerator Department PEP-II Future Plans and Parameters John T. Seeman PEP-II MAC Meeting December 13, 2004.
1 IR NEG heating M. Sullivan MAC Review Dec , 2004 M. Sullivan Machine Advisory Committee Review December 13-15, 2004 IR NEG Heating and Upgrade.
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
MDI meeting, March 19, 2004 Categorizing radiation aborts Livio Piemontese When something really bad happens to the beams, they are aborted. An optimized.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
July 7, 2008SLAC Annual Program ReviewPage 1 PEP-II in Run 7 and Transition Planning John T. Seeman Assistant Director PPA/LCLS.
HERA Operation 2004 M. Bieler, -MPY- PRC, Mai Performance Improvements in Remaining Problems - Improvement Program - Schedule 2004.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Program Risks Risk Analysis Fallback Plans for the PEP-II B-Factory John T. Seeman DOE PEP-II Operations Review April 26, 2006.
SLAC Accelerator Department B-Factory Operations and Plans John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
PEP- II Linac Accelerator Systems Department PEP-II Overview and Future Plans John Seeman SLAC Particle and Particle-Astrophysics DOE PEP-II Operations.
August 4-5, 2004 PEP-II Post Run 4 Review 1 M. Sullivan PEP-II Post Run 4 Review August 4-5, 2004 IR Summary and Issues.
PEP-II Reliability and Uptime Roger Erickson 13 October 2003 With thanks to C.W. Allen, W. Colocho, P. Schuh, M. Stanek, and the Operations staff members.
1 Run7 startup M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 7 Startup.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
DA  NE Status Report P. Raimondi Scientific Committee Nov-2005.
9 October 2003S. DeBarger PEP-II Vacuum Status PEP-II Machine Advisory Committee.
The machine status and operating mechanism of BEPCII CAO, Jianshe Institute of High Energy Physics, CAS April 16, 2013 The 4th Accelerator.
November 16-18, 2004 Belle High Luminosity Workshop 1 M. Sullivan High Luminosity workshop (HL6) November 16-18, 2004 IR Vacuum Summary and Issues.
Synchrotron Radiation Absorption and Vacuum Issues in the IR at PEP-II and a Higgs Factory John Seeman, SLAC October 11, 2014 HF2014 Beijing.
Mini MAC II PEP-II hardware M. Sullivan Apr 23-24, 2009Page 1 PEP-II Hardware Status M. Sullivan SLAC National Accelerator Laboratory Mini-MAC II Frascati,
PEP- II Linac Accelerator Systems Department Status and Plans for PEP-II John Seeman SLAC Particle and Particle-Astrophysics DOE HEPAP P5 Review April.
November 12-13, 2007 Super-B Factory: Accelerator Costing, PEP-II Hardware and Schedule J. Seeman SLAC International Review Committee meeting November.
PEP-II Status John Seeman SLAC Particle and Particle-Astrophysics
(on behalf of the DAFNE team)
SuperB Injection, RF stations, Vibration and Operations
Michael Sullivan and John Seeman SLAC National Accelerator Laboratory
The PEP-II Interaction e+e- Factories Workshop
Top-Up Injection for PEP-II and Applications to a Higgs Factory
Weekend Summary Squirted N2 at 3027 under various conditions
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
Year 2 Autumn Term Week 12 Lesson 1
NATA Foundation Building Blocks Process
PEP-II RF System Status and Upgrades
PEP-II Status and Plans e+e- Factories Workshop
SuperB RF and Other Components
Overall Project RAG Status:
McDonald’s Kalender 2009.
FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
2300 (11PM) September 21 Blue line is meridian..
Accelerator R&D Results from the B-factory
McDonald’s calendar 2007.
J. Seeman Assistant Director for PPA/LCLS
FACET Accelerator Overview
Summary of Washington DOE Review
FACET Accelerator Overview
Super-B Accelerator Overview
LCLS Operation in 2009 Roger A. Erickson
McDonald’s calendar 2007.
POC: ASAP Prevention Branch Chief (706)
2015 January February March April May June July August September
CEOS Work Plan Progress Report
Presentation transcript:

John T. Seeman DOE PEP-II Operations Review April 26, 2006 Program Upgrades, Downtime Planning, Resources for the PEP-II B-Factory John T. Seeman DOE PEP-II Operations Review April 26, 2006

OPS Review Topics Does the program have adequate resources (i.e. manpower, funding, etc) allocated to carry out the plans? Is laboratory management effectively tracking progress?

Topics Run Planning Run Operation PEP-II Performance Goals: Less than 3 aborts per day < 1 RF abort per day < 1 radiation abort per day < 1 “all other” abort per day Uptime >> 90%. Run statistics Abort statistics

PEP-II Scheduling PEP-II Accelerator Run Planning is done with: Laboratory Director (J. Dorfan) Particle and Particle-Astrophysics Directorate (P. Drell) Assistant Director of PPA for Accelerator Systems (J. Seeman) PEP-II Run Coordinator (U. Wienands) BaBar Spokesman (D. MacFarlane) BaBar Technical Coordinator (W. Wisniewski) BaBar Run Coordinators (J. McKenna, G. Bonneaud ) Technical staff Power Manager (G. Loew) Operations Head (R. Erickson) Spokespersons of other small experiments.

Scheduling Committee

Scheduling Committee Scheduling Committee members: J. Seeman (Chair), R. Erickson, C. Field, J. Weisend, W. Wisniewski, R. Hettel, P. Pianetta, D. Schultz, R. M. Boyce Meeting every few months as needed. Propose running schedule to the Directorate Provides power requirements versus month.

Accelerator Schedule

Over all PEP-II Down Schedule 2004-2010 2005 down: October 11-November 15 2006 down: August - November, 2006. 2007 down: September – November 2007 Every downtime is planned in great detail (See available handouts).

PEP-II Task Force Structure to review risks April 2006

Ongoing Accelerator Improvement Projects (AIP) X-Y BPM upgrades 2005-2006 New HER Q5 vacuum chambers 2005-2006 New HER/LER Q2 chambers 2006 HER-10 RF station 2006 HER-11 RF station 2006 HER power supply upgrade for higher tunes 2006 New HER Q4 vacuum chambers 2006 NEW IR2 Q2 bellows 2006 LER IR HOM absorber 2006 HER IR HOM absorber 2006 LER BPM monitor upgrade 2006 LER new high power bellows 2006 LER NEG vacuum chamber upgrade 2006 New Longitudinal feedback processor 2006 Cost of remaining AIP projects is about 7 M$ spread over two years. PEP-II AIP expenditures from 1999-2005 averaged about 5 M$ each year.

Projects reviews for Accelerator Division Hardware Projects All projects for PEP-II this year!

Management: Reliability is important Reliability/Tuning Task Force: Mattison/Himel Work more to reduce “aborts.” Reduce “tuning time” after aborts or repair outage. RF group is making very steady progress but have more to do to fix root causes. ARTEMIS reporting system is a good recording tool. PEP-II “tune” feedbacks could use improvements. Upgrade dither feedbacks at the IP. Area managers: Upgrade turn-on check lists.

Delivered luminosity matches prediction since March 1. Today FFTB removal delay Vacuum repair Prediction start date April 20, 2006

Lab Management: Future PEP-II Overall Parameter Goals Units Design Present in collision 2007 goal I+ mA 2140 2940 4000 I- 750 1720 2200 Number bunches 1658 1732 by* mm 15-20 11 8.5 Bunch length 15 11-12 9 xy 0.03 0.044-0.065 0.054-0.07 Luminosity x1033 3.0 10 20 Int lumi / day pb-1 130 728 1300 Over three times design Five times design

New Integrated Luminosity Projection March 2006 2007 down 2006 down

Long Time Comparison Compare: Look at: Reveal failures March-June 2003 with July-September 2005 Look at: Time accounting MTTF, MTTR Reveal failures

Run 5a Run-Time Accounting Now with reliability improvements and trickle injection Two years ago M. Stanek B. Allen R. Erickson

January 15, 2006 Luminosity LER current HER current

PEP-II Highest Luminosity October 9, 2005 1034

RF aborts November 22-28, 2005 (Van Winkle)

RF Aborts December 10-16, 2005 (Van Winkle)

Weekly Operations Reports Keep track of running hours Assign lost hours to hardware areas

Weekly Report September 26-October 2, 2005 (Erickson, Stanek)

September 26-October 2, 2005 (Erickson, Stanek)

Weekly Report January 2-8, 2006 (Erickson, Stanek)

PEP-II Down Statistics

Reports to DOE Account for running hours Report integrated luminosity Quarterly reports Weekly update reports

FY2003 Run performance (Stanek)

FY2004 Run Performance (Stanek)

FY2005 Run Performance (Stanek)

FY2006 Run Performance (Stanek)

PEP-II Conclusions SLAC management has set luminosity goals and we track our progress against those goals. Teams are in place to study PEP-II operations, accelerator physics, and to improve reliability methods and root causes. Operators, engineering staff, technicians, and maintenance people are in place to carry out the PEP-II program. We track carefully the abort rates and outages to improve reliability, uptime, and average luminosity. Short term abort rate was high in December 2005 – March 2006 due to new vacuum related instabilities. Abort rates are much lower now that the vacuum repairs have been made. Resources are adequate carry out the program.