A3 PROBLEM SOLVING TOOL: Date: Contact: SOLUTIONS / COUNTERMEASURES What solutions will solve the root causes? (Tools: Brainstorming and Affinity Diagram)
Advertisements

Project Management Workshop. Nick Cook  Citigroup Corporate and Investment Bank  European Technology Business Office Manager Edinburgh University April.
8 Managing Risk Teaching Strategies
The Gantt Chart in Project Management. What is a Gantt Chart?  A type of chart that shows the Work Breakdown Structure (WBS) in terms of the start and.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Switch off your Mobiles Phones or Change Profile to Silent Mode.
California Drought Contingency Plan Update 2013 Project Team Meeting May 31,
SBS PMP STATUS JOHN J. LEROSE 4/25/2012 received from Bob McKeown 4/12/2012.
Needs Assessment CIVE 4312 Hanadi Rifai. Engineering Design Process Iteration Needs Assessment Problem Formulation Abstraction And Synthesis Analysis.
SOFTWARE PROJECT MANAGEMENT
Test Manager’s Role Best Practice By Gabriel Rodriguez.
Project & Risk Management
Monthly progress report So far we have completed the following:  weighted decision matrix  scope statement  Business case analysis  team contract 
Phase One – Project Initiation and Set Up Project Name Your Area Health Service.
Project Name IN-PROCESS REVIEW MEETING
OUTAGE MANAGEMENT. OUTAGE APPROACH/PHILOSOPHY A) Time based / machine operating hours based concept related to OEM recommendations - More expensive than.
Six Sigma Project Coding Performance Improvement Project Global Communication, Inc.
Complete Design & Gate Review. Complete Design Detailed Design Review (DDR) 1.“High and medium technical risk” areas –Design Review (Prelim-DDR): standard.
3/21/20161 Project Title Team Name Team membership Customer (if you have a customer) EEL3923C Junior Design (S11) Date: Project #
A3 PROBLEM SOLVING TOOL: Date: Contact: SOLUTIONS What solutions will solve the root causes? (Tools: Brainstorming and Affinity Diagram) What solutions.
Managing Project Risk – A simplified approach Presented by : Damian Leonard.
BUS 611 Week 2 Assignment Project Risk Project Risk. Risk is often described as the event that “might” happen during the course of a project. Explain how.
OPS 571 Week 6 Learning Team Process Improvement Presentation To purchase this material click below link
CMGT 410 Week 5 Learning Team Project Evaluation and Control Check this A+ tutorial guideline at
BCOM 405 Week 5 Learning Team Risk Management Presentation Prepare a slide PowerPoint® presentation (including speaker notes) in which you: a. Identify.
BPA 302 Week 2 Learning Team Policy Making Process Paper Check this A+ tutorial guideline at BPA-302-Week-2-Learning-Team-Policy-Making-Process-Paper.
ACC 542 Week 4 Individual Assignment Internal Control and Risk Evaluation To purchase this material click below link
New Employee Orientation
IMS Implementation Project
Preparation of the Self-Study and Documentation
Session 22 & 23 Dr. Dan C. Surber, ESEP
National Report by (HCA Member State)
Overview of Project Planning
Presenter Name Presentation Date
8 Managing Risk (Premium).
Presenter Name Presentation Date
Confronting Conflict s34n Team Resolution.
Presenter Name | Company Name
GANTT CHART Text Text Example
Presenter Name Presentation Date
CPMGT 300 Competitive Success/snaptutorial.com
GBM 489 Competitive Success/snaptutorial.com
PM 584 Competitive Success/snaptutorial.com
INF 342 Enthusiastic Study/snaptutorial.com
CPMGT 300 STUDY Perfect Education/ cpmgt300study.com.
CPMGT 300 Education for Service/snaptutorial.com.
GBM 489 Education for Service/snaptutorial.com
PM 584 Education for Service/snaptutorial.com
CPMGT 300 STUDY Education for Service--cpmgt300study.com.
SEC 240 Become Exceptional/ newtonhelp.com. SEC 240 Week 1 Assignment Organizational Vulnerability Assessment For more course tutorials visit
CPMGT 300 Teaching Effectively-- snaptutorial.com.
TECHNOLOGY HIGH SCHOOL – INTRODUCTION TO ENGINEERING DESIGN
Presenter Name | Company Name
Presenter Name Presentation Date
Program Status (Chart 1)
Project Title, date “Team Name: Team members, …”
Presenter Name | Company Name

National Report by (HCA Member State)
AS Risk Mitigation Plan
CR GR HSE 001 On-MAESTRO HSE Expectations
Presenter Name | Company Name
Course Lead: Richard Owen
Presenter Name | Company Name
Presenter Name Presentation Date
Presenter Name Presentation Date
Meeting Agenda Go over A.L. Machining
[Ballot code, contract number] [Project title]
CR GR HSE 001 On-MAESTRO HSE Expectations
Meeting Agenda Raw materials all here yet? – Piotr, Meka, Shayne
Presentation transcript:

Meeting Agenda 3-28-13 Go over A.L. Play with apparatus Supplies from Chem E dept Safety stuff Cart Go over Gantt Chart Schedule Go over Risk Assessment What’s next for test plan? Prepare for Neal Schedule for next couple of weeks – how has it changed since last week Risk assessment has trigger dates? – what is coming up in next couple of weeks? Any other issues we want to discuss with him

Neal’s meeting agenda format The Schedule with particular attention to how we have diverged from the plan as discussed the previous week. The plan for the next week or two showing the impact of the divergence and the plan to compensate, along with the activities for each team member. The Risk Matrix with particular attention to high risk issues, and those with a trigger date within the next week or two, and the readiness to implement mitigation or contingency plans. Other issues that are of concern.  This may drive new issues for the risk matrix.