Trimble PCS900 Measure-ups using SPS930 UTS and SCS900

Slides:



Advertisements
Similar presentations
35 FOOT LADDER 3 PERSON.
Advertisements

Machine Setup. This Webinar is LISTEN only Questions will be answered in writing at the end of the Webinar. QUESTIONS? Webinar Information.
Classification Measurements
By Timothy L. Kirkpatrick Network Support Engineer.
An Introduction to Using
General Information Dimensions · Structure Width: ~ 197in. (16.4’), 99in. (8.2’)/car · Slope Angle: 5 degree · Structure Height (Front): 100in. + base.
RoboCell and Cell Setup
Optical Manufacturing Solutions 1 Probe Assembly.
MyLock 644D Service Seminar.
Use Visual Signaling Techniques
CHAPTER 7 ANGLE MEASUREMENT
Reduced Vertical Separation Minimum (RVSM)
Creating a Chartres Labyrinth 11 Steps to reproducing your own Chartres Labyrinth.
Grade Sensor Placement rev Aug 2009 Grade Sensor Placement Asphalt Paving Grade Sensor Placement.
Google SketchUp Castle
Setup “Do’s & Don’ts Presented By:
(Smart Loop System) Installation Guide. Rev B Shipping Box Contains Everything that is included in the box being shipped to a customer should contain.
Principles of Paving rev Principles of Paving.
Helical Milling Unit 71.
Using Pocket Dog. Exporting Files to PocketDog Close PocketDog, but leave the field computer on. Connect your PC and your field computer using Active.
Trimble SPS730 and SPS930 Universal Total Stations
Paver System Five Control Box Overview Aug 2009 Control Box Overview Paver System Five.
ISOMETRICS Isometric means “equal in measure” and refers to the fact that the three receding axes are tilted at 30°. Isometric drawings are constructed.
STEP 1: Determining the exact image width STEP 1: Determining the exact image width Position of X-ray Filter Position of X-ray Filter STEP 5: Crop Extra.
Trimble GCS900 Dual Antenna System Why Trimble uses a Dual Antenna Solution and why it is the better solution?
SETTING OUT Horizontal Angles. Ensure instrument is set to measure angles in the appropriate direction. ( refer to operators manual) Unclamp both vertical.
Excavator X62 Installation. This Webinar is LISTEN only Questions will be answered in writing at the end of the Webinar. QUESTIONS?
CAD3D Project. SketchUp - Project Create a new SketchUp project called InitialsXX where the XX are your first and last initial. Use the Rectangle tool.
GCS 300 System Operation Application – Level 1.
DESIGNING BENDWAY WEIRS
EV3 Workshop Oct 3, 2015 Instructor: Chris Cartwright
© 2008 The McGraw-Hill Companies, Inc. All rights reserved. M I C R O S O F T ® Refining Original Illustrations Lesson 9.
EPOCH 1000 Series Procedure Phased Array Angle Beam Calibration
Individual Design Concepts Senior Design: Team Burja __________________________________________________________________________________________________________________________________________________________________________________________________________
Motion Constraint Train Down the Track. Apply Angle Constraint to Workplanes Train is assembled at this point. Place a Workplane through the center of.
Design Studies 20 ‘Show Off’ Project How to make a computer monitor In Google Sketchup By: Liam Jack.
Presentation - Date (change on Slide Master) Paver System Five Slope Sensor Theory of Operation.
Basic knowledge Asphalt paving
SAS Smoothtrac Theory of Operation rev Aug 2009 Paver System Five SAS Smoothtrac Theory of Operation.
3M Touch Systems Mark Roberts Field Application Engineer August 14, 2002 Touchscreen Integration and Troubleshooting.
Instrument Calibration.  As previously discussed the principle of measurement is comparing a component against a known standard therefore any equipment.
Calibration of your Field Sprayers using Shortcut Methods
PCS400 Software Phil Jackson Training Manager January 2009.
PCS400 Quiz Phil Jackson Training Manager May 2009.
CTCT PCS900 v1.10 Quick Start Guide Phil Jackson Training Manager March 2010.
CTCT 3D Paving Training 3D UI, Configuration & Use March 2010 Phil Jackson CTCT Training Manager.
PCS900 AccuGrade 3D Paving Training UTS May 2009 Phil Jackson CTCT Training Manager.
5/14/2003Sprint TekNet IP Train the Trainer1 Open TekNet Software If working at a client station, enter the IP address of the server and mark page as a.
Version of document: 2.02 Software CBox: v3 User Manual Application Examples Language: English.
New Product Release Trimble PCS900 v1.1 & Cat AccuGrade v1.1
Dozer: Sensors Calibration and Hydraulic Calibration
IDENTIFYING MAT FAULTS
3D Paving Training AutoAdjust
WAPA / WSDOT Joint Training
Select a work instruction
Powertap User Guide.
Micrometers Unit 9.
Step-by-step assembly instructions
T_C_N_L_G_ E D I D I E O Y O H I E B J I R E A A W.
Specialist experiment
An Introduction to Using
Step-by-step assembly instructions
ECOLOGY OF THE SEASHORE
Use of display screen equipment by children:
Engineering Graphics I
Microsoft Excel 101.
Creating Sheet Metal Pattern
Surveying With Construction Applications, 7th Edition
How To Use The FD92 Digital Camera
New Features in Security Management
Presentation transcript:

Trimble PCS900 Measure-ups using SPS930 UTS and SCS900 Brian E Girouard, Sales Engineer MPC Specialist – Heavy & Highway Division Trimble Navigation Ltd

Trimble PCS900 Measure-ups using SPS930 UTS Equipment and Tools Required Complete PCS900 Installed Calibrated and Collimated SPS930 UTS with Tripod and Battery * * Must know how to setup a Total Station SCS900 Data Controller ** ** Must know how to use SCS900 Small Reflective Foil Target (in the UTS Case, double check!) Calibrated SmartLevel or SmartTool Measuring Tape Laptop with PCS900 Measure-Up Excel Spreadsheet

Trimble PCS900 Measure-ups using SPS930 UTS Preparations for PCS900 Measure-up Park the paver on a level surface Ensure the screed is level/flat (ask for assistance if unsure) If the paver has “Rear Extensions”, set the paver to the paving width Ask contractor what the typical paving widths will be for the 3D Paving Project Complete a Measure-up for every width at 1.5’ intervals on each side E.g.: 12’, 15’, 18’, etc… If the paver has “Front Extensions”, measure to the Main Screed which is the Trailing Edge Lower the screed on starter blocks Move the paver forward to remove any tow arm slack Zero tow arms Null screed (e.g.: using screed cranks) Set screed at normal angle of attack

Trimble PCS900 Measure-ups using SPS930 UTS We have to take 7 measurements on the paver Using SPS930 & SCS900 1  MT900 – Left (MTL) 2  Outside Tow Arm Left (TAL) 3  Screed Tip Left (STL) If Dual Masts are installed (highly recommended) 4  MT900 – Right (MTR) 5  Outside Tow Arm Right (TAR) 6  Screed Tip Left (STL) Using Steel Tape 7  Screed Trailing Edge to Tow Point Cylinder Center

Trimble PCS900 Measure-ups using SPS930 UTS MTL MTR TAL TAR STL STR

Trimble PCS900 Measure-ups using SPS930 UTS Setting up the SPS930 Prior to setup, ensure the SPS930 can see both sides If you do not have 4 reflective targets, have a person hold the reflective target on the Tow Arms and Screed Tips Have a person stand behind the paver and in line with the center of the screed until they can see all points This is where the SPS930 needs to be setup

Trimble PCS900 Measure-ups using SPS930 UTS Setting up the SPS930 TAL TAR STL STR Center of Screed

Trimble PCS900 Measure-ups using SPS930 UTS Setup the SPS930 Using SCS900 Create a New Site and Work Order E.g.: PCS900 Measure up DATE Add two Control Points First: 5000, 5000, 100 Second: 5200, 5000 (uncheck Elevation) Set Up Instrument Position Setup on a known control point Select Instrument Point (Control1) Select Reference Point (Control2 which is to the North or top) Aim towards the center of the paver CHECK ON “Shooting angle only” Select “Measure” and Complete Instrument Setup Select: “Measure control points”

Trimble PCS900 Measure-ups using SPS930 UTS Before measuring with SCS900, you must set the Target Height = 0 (zero) You will also need to change the Target Types between Measurements! 1  MT900  Left = RMT ID 9 Check ID to ensure the MT900 is connected! Lock the SPS930 onto the MT900 Left 2 & 3  Acrylic Target (TAL & STL) 4  MT900  Right = RMT ID 10 Lock the SPS930 onto the MT900 Right 5 & 6  Acrylic Target (TAR & STR) PLEASE NOTE I: You will need to move and connect the MT900 Target prior to measuring the opposite side (i.e.: 4 ) PLEASE NOTE II: Do not use the DR or Autolock (to the Acrylic target) functions to measure the points.

Trimble PCS900 Measure-ups using SPS930 UTS

Trimble PCS900 Measure-ups using SPS930 UTS Depending on the MT900 locations vs the Screed Tips, SCS900 should look like this after the measurements are complete: 4  1  2  5  3  6 

Trimble PCS900 Measure-ups using SPS930 UTS 7  Using the Steel Tape, measure the Screed Trailing Edge to Tow Point Cylinder Center

Trimble PCS900 Measure-ups using SPS930 UTS Measuring Masts Leans Use a Calibrated SmartLevel or SmartTool Measure and Record the Mast Lean In or Out from Screed Tip Place the level against the mast and parallel to the screed trailing edge Determine the Mast Lean in degrees from Vertical (90o) Measure the Mast Lean In or Out from Screed Tip If the mast leans out from the paver, the value is negative (-) If the mast leans in from the paver, the value is positive

Trimble PCS900 Measure-ups using SPS930 UTS Measuring Masts Leans

Trimble PCS900 Measure-ups using SPS930 UTS Measuring Masts Leans Use a Calibrated SmartLevel or SmartTool Measure and Record the Mast Lean Back or Forward from Screed Tip Place the level against the mast and parallel to the screed trailing edge Determine the Mast Lean in degrees from Vertical (90o) Measure the Mast Lean Back or Forward from Screed Tip If the mast leans forward towards the front, the value is negative (-) If the mast leans back towards the screed, the value is positive

Trimble PCS900 Measure-ups using SPS930 UTS In SCS900, go to Volume & COGO > Compute Distance & Area Use the PCS900 Measure-up Excel Spreadsheet to complete the key-in measurement information

Trimble PCS900 Measure-ups using SPS930 UTS SCS900 Measurements (1st Tab)

Trimble PCS900 Measure-ups using SPS930 UTS Computed PCS900 Entries (2nd Tab)

Trimble PCS900 Measure-ups using SPS930 UTS Turn on the PCS900 display in Manager Mode Go to the Installation Menu Select Machine Settings > Edit Machine Key-in a Machine name (e.g.: make, model and perhaps machine number) Follow the instructions carefully and select the appropriate settings

Trimble PCS900 Measure-ups using SPS930 UTS Machine Settings Example:

Trimble PCS900 Measure-ups using SPS930 UTS In the Installation Menu Select Machine Dimensions > Mast Measurements Read all Instructions carefully and proceed to the “Mast Measurements” PLEASE NOTE III: Change “Measure Method” (F3) to “Center of UTS target”

Trimble PCS900 Measure-ups using SPS930 UTS F1 F2 F3 F4 F5 F6

Trimble PCS900 Measure-ups using SPS930 UTS Using the “PCS900 Entries” from the excel spreadsheet, key-in the computed values for both the Left and Right sides Include the Masts Leans and Trailing edge to tow point cylinder values PLEASE NOTE IV: When using “Center of UTS target”, YOU MUST set the “Height of the starting block” = 0.000 for both the LEFT and RIGHT sides!!! The mast height dimensions are being calculated to the screed tips (top of the starting blocks) and not to the ground

Trimble PCS900 Measure-ups using SPS930 UTS

Trimble PCS900 Measure-ups using SPS930 UTS When all the mast measurements are keyed-in, go to “Machine Body” Machine Dimensions menu Key-in the “tow arm width” and the “Trailing edge to tow point cylinder” dimensions Go to Installation > Calibrate Sensors Calibrate both the Left and Right side AS450’s using the Mast Lean values (back/forward; in/out)

Trimble PCS900 Measure-ups using SPS930 UTS PCS900 only saves one “persist” machine file which includes all the dimensions, etc… and “Text Items” Prior to saving the persist file, set the Text Items

Trimble PCS900 Measure-ups using SPS930 UTS Sample PCS900 Test Items

Trimble PCS900 Measure-ups using SPS930 UTS Go to “Save Settings” and include the screed width and date

Trimble PCS900 Measure-ups using SPS930 UTS If the paving contractor will be paving variable widths with a rear mounted screed Raise the screed and set the width Proceed in setting up the machine/screed prior to measure-up and repeat the measure-up process Save the Machine with the new width and include the date Please Note V: You do not need to re-impute the Text Items