Production and commissioning of the 2nd BGC

Slides:



Advertisements
Similar presentations
Status of Sensor and Hybrid Production LHCb Zurich Week T. Bowcock.
Advertisements

TPC meeting, CERN, 7-8 October 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 7-8 October 2003 Børge Svane Nielsen, Niels Lindegaard,
Sept. 30, 2004 NIKHEF-1 Hans de Vries Status NIKHEF Mechanics Secondary vacuum box Bellows Vacuum system CO 2 cooling: Bart Verlaat.
Timeline on the laser setup Show a conceptual design on the metal box, 2 iterations Check design, i.e. all details fit the actual physical constraints,
Timeline on the laser setup Show a conceptual design on the metal box, 2 iterations Check design, i.e. all details fit the actual physical constraints,
13 March MERcury Intense Target (MERIT) Experiment Layout A.Fabich for CERN AB-ATB.
T. Montagne LTU – Beam Dump Installation April 16, LTU and Beam Dump Installation April 16, 2007.
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
PEEM III Endstation Design Review
US CMS DOE/NSF Review: May 8-10, Endcap Alignment Dick Loveless DOE/NSF Review 9 May 2001.
MONALISA David Urner Paul Coe Matthew Warden Armin Reichold Oxford University.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
Test Mass Discharging System (TMDS) Design Review 20 Nov 2014 Rich Abbott, Dennis Coyne, Eddie Sanchez, Calum Torrie 1 LIGO-G v1.
Linac4 Ion Source commissioning: Vacuum Aspects C.Pasquino, N.Thaus, J.Hansen, P.Chiggiato Linac4 Ion Source Review - 14th November 2013.
Date Event Global Design Effort 1 Technical System Review John Noonan, ANL Yusuke Suetsugu,KEK Paolo Michelato, INFN Milano.
CLASSE prototype: mechanical concepts G. De Michele, EPFL-PSI-CERN on behalf of CERN team SLAC, 16 th April, 2012.
BDS 11 Vacuum System for BDS [Completeness of RDR] Y. Suetsugu J. Noonan and P. Michelato Design principle Basic design Cost estimation.
EE planning meeting Lucie Linssen 1 CERN EE regional centre and Dee assembly plans Dee assembly TA3, not for EE Supercrystal regional centre.
Polarized GaAs photo cathode development and the preparation of Gatling Gun cathodes at BNL The Single Cathode Activation Chamber.
UED ASTA Mechanical Mechanical Design Status Eric Bong 20 May 2014.
Brussels Gantry Ê Problem with vacuum chambers in plate 4 leaks in plates with gives communication between positions Ë Problem with rotation motor (U-motor)
Compressor status AWAKE Technical Board meeting 19 August 2015.
D Walters Undulator Systems – BFW April 30, 2008 Production Status of the Quad Spool J Morgan – Engineer Bellows Module Soon-Hong.
Current Status of Pepperpot Emittance Measurement System Simon Jolly Imperial College FETS Meeting, 22/02/06.
TM0 components inventory and procurement schedule In LAB testing facility A. Bartalesi.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Booster and Collider SC magnets. Design & prototyping of UHV and cryostat systems for Booster and Collider A.Smirnov JINR, Dubna, Russia NICA Machine Advisory.
Update on the Laser Beam Line
ASTA Accelerator Directorate Review Project Plan and ES&H Carsten Hast May 20, 2014.
7/06/20111 Linac4 Ion Source Review Design and production D. Steyaert – G. Favre Linac4 Ion Source Review Design and Production New LINAC4 Front end Chamber.
Ch. Vuitton – BE/BI Presented by R. Veness – BE/BI 18th October
Schematic of Laser Transport Vacuum enclosure Laser Room Interlocked, controlled area Laser Wall Periscope in vacuum enclosure Cathode Fiduciary Beam line.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Recent development of the Supersonic Gas-Jet Beam profile monitor
BSRT UPDATE LMC 02-OCT-2012 F.Roncarolo on behalf of the BSRT team W.Andreazza, E.Bravin, A.Boccardi, J-J.Gras, A.Goldblatt, M.Hamani, T.Lefevre, R.Jones,
1 HMPID Project Assembly & Tests of CsI QE monitors: VUV-scanner and ASSET Milestone: December 2002.
PANDA Collaboration Meeting, GSI November 2010 H.O. Cluster-Jet works at GSI Herbert Orth, GSI Darmstadt, Germany Title.
Systematic studies on pellet beam production M.Büscher, A.Gerasimov, V.Chernetsky, P.Fedorets, A.Dolgolenko,V.Balanutsa, A.Boukharov, L.Gusev, S. Mineev,
PXIE absorber test bench A. Shemyakin, C. Baffes, K. Carlson, B. Hanna, L. Prost, J. Walton November 6, 2012 Project X meeting Test bench description Difficulties:
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
Jan , 2008 LCLS Undulator Week Dean R. Walters 1 Vacuum Components Undulator System SH Lee, J Morgan, and D Walters.
BM&N STS ladders assembly in VLHEP
Drive-Laser Commissioning Status and Plans
Sub-system integration for the VBOX
Awake Electrons Gun Introduction. - How works an electrons gun
MICE Meeting at RAL, Oct-23, 2005
Installation of an Instrument on a CERN machine
Test beam organization, schedule, requirements and installation This is no talk rather a questionnaire! Installation to T9 Preliminary schedule What do.
Resume of the experimental program up to date
Summary of activities of the pellet target development
AWAKE proposals for BE/BI
Development of the pellet target in ITEP
Status of Questions and Actions from the meeting of 10/2016
EBTF Design Review Technical Meeting Group
Target and Horn status report
Diffuser status October 2017
Beam-Gas Jet profile monitor for the e-lens
Beam Wire Scanners (PS prototype and LIU series)
Beam Finder Wire Assembly Undulator System
Project planning and status (February 2018)
PBC Method Flat Mirror Gas Mixture Dielectric Mirror Pump Window PM
XFEL Bunch Compressor BC1 and BC2 Vacuum Issues
Current Design and Short Status
NEG-coated gun: Black R30 arc at 227kV, white R30 arc at 164 after refurbishing and second bake Carlos Wednesday, August 10, 2018.
Feb CIS meeting Marcy Stutzman.
Primary Spectrometer & Sample Environment
Teleconference ACS – FREIA 19th June 2017
BGC Collaboration Meeting –
Project management Ray Veness.
Presentation transcript:

Production and commissioning of the 2nd BGC Hao Zhang, Edward Martin

Layout of the new setup

Vacuum chamber Lesker Scanwel Vacom Cost Lead time 0002 £869.40 4 weeks £1356.20 6 weeks €1251.00 5 weeks 0004 £3608.73 9-10 weeks £3605.68 €10280.00 7 weeks 0005 £5886.49 £6401.60 €15510.00 9 weeks 0006 £2919.42 8 weeks £3332.80 €7770.00 0007 £3805.63 £4696.00 €9115.00 0010 £1935.05 £2755.20 €4115.00 others £500 £180 VAT(20%) £3904.94 £4459.58 total £23429.66 £26757.46 €48041.00 (£40723.07)*

Optics System Purchased by Serban Ready in the lab Plan to test it in this week in the old setup and transfer to the new setup later

Frame and support RS Pro Aluminum Alloy Strut Size: 80 *80, Length: 2 m or 3 m Price: £97.5 or £143.38 Estimates: 8*3m = £1147 http://uk.rs-online.com/web/p/tubing-struts/8508509/

Nozzle assembly The Drawing is ready to signed off One month lead time 2500 CHF for the 4 nozzle tubes Bellows and flanges and skimmer holders 6000 CHF Pump 2400 CHF Another skimmer holder 3000CHF for test the alignment in CERN

Skimmers Conical skimmer Third skimmer Ordered from beam dynamic Inc. for alignment purpose 16 week lead time from 3 weeks ago Need order 2 additional for CI 1000 USD per skimmer *4 Third skimmer We could polish the ones already in CI 3D printing? Slit in a metal plate (Need simulation support from Marton)

Pumps and gauges Scroll pump 3.3kCHF *4 TMP 300L/s *2 5.5kCHF 300L/s *2 optional Estimation from Gerhard (CERN internal quotation from Pfeiffer)

Vacuum gauge 4 or 5 sensor if cone installed. 1.5kCHF each Controller 2.0k CHF

Jet density scanning system XYZ manipulator 6kCHF We use one from Vacgen Also available from Lesker and UHV design Tube Use standard parts 500 gbp Slit or pin-hole Laser drill ~100 gbp Sensor Hot cathode gauge

Alignment system Laser Reflecting mirror CCD Camera

Cost estimation Vacuum chambers by end of August: 24k GBP Nozzle assemble and conical skimmer: 15k GBP 3rd skimmer: 2k GBP Pumps: 34k or 45k GBP Vacuum Gauge: 9.3k GBP Jet density scanning system: 10k GBP Alignment system: 3k GBP Frame and support by end of August: 2k GBP Total = 99.3 kGBP or 110.3 k GBP

Timeline 1 Sep- 10 Sep: Build the frames, support and rails for new setup 11 Sep- 20 Sep: Assemble the vacuum chamber 21 Sep- 30 Sep: Assemble pumps and sensors 1 Oct -20 Oct: Assemble nozzles, skimmers and alignment system. 21 Oct – 30 Oct: Install the optics system and E-gun 1 Nov – 10 Nov: Pumping and baking November: BIF experiment with new setup