East Area Renovation Project team #6 Launch safety agreement

Slides:



Advertisements
Similar presentations
Nuclear and Treaty Law Section Office of Legal Affairs
Advertisements

Andre Henriques DGS/SEE LIU-PSB. S AFETY R EQUIREMENTS & S AFETY F ILE 14 TH F EBRUARY 2013 February 2013.
Safety Management of the LIU Project A. Funken Anne Funken, LIU PT 21/05/15.
Permit to Work Procedure Document Number: KOC.SA.004
UK’s CDM Regulations 2007 and its Applications in Singapore
Safety & Safety Documentation 2 3 Safety in three Questions Why ? Providing a safe workplace is a legal and moral obligation on every undertaking, and.
Management of Health And Safety.
Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.
17 July 2002RSOC presentation G.D. 1 NEW SAFETY CODE A9 Origin –Revision of SAPOCO 42 document Main modifications: –Official name becomes SAFETY POLICY.
André Henriques DGS/SEE LIU-PSB OOSTER. HSE S AFETY C ORRESPONDENT 13 TH S EPTEMBER 2012 September 2012.
Adverse Event Management from the HSE perspective E. Cennini / DGS-SEE EDMS Id Adverse events Workshop Creating a common understanding.
CLIC CES Webex 12 Nov Summary: – Set of fire safety measures defined in CERN Safety Report – Proposed Structure for CLIC/ILC Fire Safety Report Fabio.
DGS/SEE Flammable Gas Safety – an update. DGS/SEE New Chemical Safety Rules New SR-C, Chemical Agents. GSI-C1, Prevention and Protection.
Joint ILC/CLIC Safety document ► Incentive for this document:  Share effort to define a coherent safety protocol for future linear colliders.  Insure.
128 May 2013 CENF Near Far Integration For the Safety Folder + Environmental impact Study Simple process: Identify Safety issues >> description >> risk.
CLIC CES Meeting 14 jan 2009 A resume table for fire safety in LHC, and a possible scheme for other machine – part 1 CERN –SC Fabio Corsanego.
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
HSE-LSA HSE procedure foresees a Launch Safety Agreement for all new project –this is since several year made systematically for all new projects. The.
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
© Module 4—Hazard Prevention and Control Safety Management Worksite Analysis Management Commitment and Employee Involvement Hazard Prevention and.
J. Pedersen EN DSO Performance Scientific performance Measurable, reproducible, controllable: Documented presence! Technical performance Measurable,
The new approach to the CERN Safety Policy and Safety Organisation A. Goehring-Crinon & R. Trant.
LS2 Safety Thomas Otto, LS2 Safety Coordinator.
Purpose NEW BEAM DUMP TUNNEL Launch Safety Agreement - conventional aspects LIU-SPS external beam dump meeting - C. Colloca DGS/SEE LSA conventional.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
19/11/2015 PSB and PS&TT2 Facilities YETS L. Kobzeva.
Milestones for Nuclear Power Infrastructure Development Establishment of A Regulatory Framework Gustavo Caruso, Section Head, Regulatory Activities Section.
Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.
Horst Breuker ADUC Jan Safety and Radio Protection, Consequences for the Experiments ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive,
1.Definition 2.Examples 3.Hazards 4.Signage 5.Rule and permit 6.The role of the TSO HSE Unit - Olivier Prouteau CONFINED SPACES Updated in January.
Health & Safety in Construction 4A7 Design & the Built Environment John O’Connor.
C. Darve / Technical Board – December 13 th, 2012Preliminary pressure vessel code requirements Preliminary pressure vessel code requirements Technical.
ESS Cryomodule Status Meeting – Elements of Safety | | Christine Darve Elements of Safety Applicable to the ESS 2013 January, 9 th Christine.
Logo area 11 T Review: Safety and Codes Thomas Otto HL-LHC Project Safety Officer With contributions by -Frédéric Savary, Hervé Prin, TE-MSC -Carlos Arregui,
Logo area MQXF Review: Safety Thomas Otto HL-LHC Project Safety Officer With contributions by -Paolo Ferrcin and Ezio Todesco, TE-MSC -Francesca Viggiano,
Logo area MQXF Review: Safety Thomas Otto HL-LHC Project Safety Officer International Review of the Inner Triplet Quadrupoles (MQXF) for HL-LHC.
Electrial Safety LS2 days November 2016 AP
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
Cryogenic safety organisation at CERN
The Next Generation of a Gamma Irradiation Facility GIF++
DoD Fuels Laboratory Standards UFC
Being TSO at CERN Safety at CERN Being TSO at CERN Safety at CERN.
Test beam check list Michael JECKEL EN-EA-EC.
Some arrangements for personnel safety 1- Procedures for access
East Area Renovation Project Team meeting # 2 – EDMS News
Safety in the Neutrino Platform Hall
Electric Vehicles Safety Global Technical Regulation
Safety Documentation EHN1
HSE rules & regulations
East Area Renovation Project team #7 News
EET 422 EMC & COMPLIANCE ENGINEERING
EP Experiments safety validation process Safety Permits
East Hall under construction
East Hall under construction
HL-LHC Safety Assessment Process
THUM Adapter Impact on Hazardous Area Classification
Works and Services Supervisor
Undulator System Installation
Understanding Construction Codes
Radiation protection organisation
Ian Evans SSRL Safety Office
Radiation Protection Handbook
ESHAC Meeting # Peter Jacobsson Head of ESH
East Hall under construction
East Area Renovation Supply of control rooms b.157
Safety in the East Area Renovation Project
EA Renovation Project – Project Team 29 – 28 June 2019 NEWS
CR-GR-HSE-419 Safety of excavation works
IS&LEBT Commissioning Review Safety and Radiation Protection
Presentation transcript:

East Area Renovation Project team #6 Launch safety agreement East Hall under construction - 1962 Sebastien EVRARD / EN-EA, 10-02-2017 East Area Renovation

How safety is managed in the project East Area Renovation Project Team Directly exchange on safety matters Project Leader S. Evrard EN-EA Responsible for safety in the project Project Safety Officer MISSING Delegate part of his safety duties Coordinate safety matters on the behalf of the project leader HSE Linkperson A. Henriques HSE/SEE HSE Experts Provide project information for expertise by HSE Provide rules and requirements from HSE Provide expertise in matter of safety Project team meeting #6 February 10th, 2017

Status of the Launch Safety Agreement (LSA) The Launch Safety Agreement includes the following information : A description of the project A preliminary list of hazard identified : This list only include hazards that will be generated by the project once completed. (Worksite hazards should be mentioned but not detailed) Based on these information, HSE experts have provided a list of rules and regulations to be applied to the project. Outcome of the LSA : Project classified with major Safety implications : HSE/SEE will perform regular checks through the different phases of the project and a safety clearance from HSE (on behalf of the DG) will be required before operating the facility. Project team meeting #6 February 10th, 2017

LSA: safety requirements Q. Bouirek, 23-09-2016 East Area Renovation Meeting

Example: Electrical safety Electrical installation shall comply with the Safety requirements provided in the following Safety rules: CERN Safety Code C1 - Electrical safety code CERN Safety Instruction IS 5 - Emergency stops CERN Safety Guideline EL-0-0-1 - Installation of Safety lighting - Installation d'éclairage de Sécurité Directives ATEX 1999/92/EC and 94/9/EC EN 62305 series: Lightning protection standard. Low voltage and high voltage electrical installations shall comply with the Standards which are referred in the following CERN Safety rule: CERN Safety Instruction IS 24 - Regulations applicable to electrical installations. All the electrical materials shall comply with the Safety requirements provided in the following CERN Safety rules: CERN Safety Instruction IS 23 - Criteria and standard test methods for the selection of electric cables and wires with respect to fire safety and radiation resistance CERN Safety Instruction IS 48 - Fire prevention for cables, cable trays and conduits. In addition to the standard electrical requirements, additional assessments are necessary to mitigate the risks linked to use and operation of the capacitors for the new power converters. A risk assessment is required, addressing both prevention and protection aspects. Q. Bouirek, 23-09-2016 East Area Renovation Meeting

East Area Renovation Meeting Safety documentation See attached annex 1: lien Q. Bouirek, 23-09-2016 East Area Renovation Meeting

Dedicated safety studies Gas systems (flammable gas) Explosion risk assessment Flammable gas in experimental areas Energy storage (similar to B.245 – POPS Booster) Shielding Access restrictions Primary area ventilation (based on RP study) Ventilation & access modes Underpressure Air tightness Q. Bouirek, 23-09-2016 East Area Renovation Meeting

Thanks for your attention! East Area Renovation