The KM3NeT Phase-1 Memorandum of Understanding

Slides:



Advertisements
Similar presentations
Regional Policy EUROPEAN COMMISSION 1 EGTC regulation EGTC regulation ESF and EGTC regulations Regulation of the European Parliament and of the Council.
Advertisements

Seminar on European Territorial Co-operation – Brussels - 21 February 2005 Cross border co- operation at the EU external borders Seminar on Territorial.
DC-NET overview Rossella Caffo, Sara Di Giorgio ICCU – Central Institute for the Union Catalogue Italian Ministry of Culture.
HORIZON 2020: FINANCIAL ISSUES
Jan 2009 U. Katz: Astroparticle Physics 1 What is KM3NeT – the Vision  Future cubic-kilometre sized neutrino telescope in the Mediterranean Sea  Exceeds.
C.Sollima INFN - University of Pisa for the KM3NeT Consortium “Quality Assurance and Risk Assessment in the KM3NeT Neutrino Telescope Design Study” Technical.
The KM3NeT Project  Objectives  Current membership and funding  Preparatory Phase  The EMSO connection  Structural funds ESFRI Meeting, Brussels,
P. Sapienza, NOW 2010 The KM3NeT project  Introduction & Main objectives  The KM3NeT Technical Design Report  Telescope physics performance  New developments.
KM3NeT ESFRI/PSE-WG meeting, 3 December 2013, Brussels Maarten de Jong & Paschal Coyle on behalf of KM3NeT 1 The next generation neutrino telescope in.
Introduction to future synergy options Uli Katz ECAP, Univ. Erlangen Deep Ocean Cabled Observatories Amsterdam, May 2012.
The Preparatory Phase Proposal a first draft to be discussed.
Paolo Piattelli - KM3NeTIAPS - Golden, 6-8 may 2008 KM3NeT: a deep-sea neutrino telescope in the Mediterranean Sea Paolo Piattelli - INFN/LNS Catania (Italy)
KM3NeT The Birth of a Giant V. Popa, KM3NeT Collaboration Institute for Space Sciences, Magurele-Bucharest, Romania.
The European Science Foundation is a non-governmental organisation based in Strasbourg, France.
La competizione per ospitare l’Hub Centrale dei Servizi Integrati (ICS-C) EPOS Management Office.
1 INFRA : INFRA : Scientific Information Repository supporting FP7 “The views expressed in this presentation are those of the author.
C.DistefanoCRIS 2008 – Salina, September The KM3Net Consortium Istituto Nazionale di Fisica Nucleare Laboratori Nazionali del Sud Towards a km3-scale.
WP7 - Architecture and implementation plan Objectives o Integrating the legal, governance and financial plans with technological implementation through.
EPOS Preparatory phase Torild van Eck (ORFEUS) Call INFRA Deadline: December 3, 2009 Funding: between 3 and 6 MEuro Duration: max 4 year.
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.
ATTRACT is a proposal for an EU-funded R&D programme as part of H2020 for sensor, imaging and related computing (ICT) development Its purpose is to demonstrate.
LIGO-G M Management of the LIGO Project Gary Sanders California Institute of Technology Presented to the Committee on Programs and Plans of the.
The HEAP-MM proposal P. Piattelli VLVnT The call  INFRA Research Infrastructures for astroparticle physics: High energy cosmic rays,
Sophie Sergent Ifremer European Affairs Department / MariFish WP7 ERANET MariFish COORDINATION OF EUROPEAN MARINE FISHERIES RESEARCH Presentation of MariFish.
EMSO – PP European Multidisciplinary Seafloor Observation Preparatory Phase PROJECT OVERVIEW.
1 Support for New Research Infrastructures in the EU 7 th Framework Programme for Research Elena Righi European Commission SKADS Workshop, Paris, 4 September.
AIDA negotiation process AIDA NCP Meeting,
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
LIGO-G M Summary Remarks: Management of LIGO Gary Sanders California Institute of Technology NRC Committee on Organization and Management of Research.
ITWG Topical Workshop Management of Instrumentation Projects 19 to 21 May 2014 Rolf Lindner.
EGEE JRU Workshop, Brussels, December 1 st, JRU RoGrid – Romanian Experience RoGrid Consortium RoGrid JRU set-up RoGrid JRU Implementation Internal.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
European Spallation Source Overview and Status Technical Advisory Committee 1-2 April 2015 James H. Yeck ESS CEO & Director General
WPC Status Report KM3NeT General Assembly, Catania, 22/2/2011 Paschal Coyle, CPPMarseille legal, governance, financial engineering and site issues of the.
Astroparticle Physics European Consortium What can large Astroparticle Physics projects like LAGUNA-LBNO expect from the new APPEC, the Astroparticle Physics.
Report to the ASC on project organization and critical issues E. Migneco ASC meeting, Amsterdam, march
Report from the Erlangen Meeting Uli Katz ECAP, Univ. Erlangen ANTARES collaboration meeting - KM3NeT day Bologna, 5. October 2012.
André Hoddevik, Project Director Enlargement of the PEPPOL-consortium 2009.
KM3NeT Neutrino conference 2-7 June 2014, Boston, U.S.A. Maarten de Jong on behalf of the KM3NeT collaboration The next generation neutrino telescope in.
INTERREG II C Baltic Sea Region Supporting Spatial Planning in the BSR Workshop on Environmental Information in the Baltic Sea Region Hamburg
2012 a year of transition Paschal Coyle, Mauro Taiuti, E. de Wolf IB-meeting, 29 January 2013, CPPM.
Research & Innovation Preparatory Phase and Early Phase Support under the WP * of Horizon 2020 Harry Tuinder Research Infrastructure Unit DG Research,
AMICI WP1 – Management, coordination and dissemination
KM3NeT multi-km3 neutrino telescope: perspectives
Concluding remarks E. Migneco
ACTRIS on the ESFRI Roadmap
WP1 - Consortium coordination and management
Pasquale Migliozzi INFN Napoli
Governance and Collaboration By-Laws
Els de Wolf 20 February 2012, Catania
Progress WP 2 Legal Entity
(NEutrino Mediterranean Observatory): Toward a km3 Neutrino Telescope
Ways to industry participation in CLIC 24th October, 2017
KM3NeT: where are we and where do we go
Setting up an ERIC 11 May 2012 Richard Derksen
User instrument policy
Marine knowledge presentation to eighth meeting of Marine Observation and Data Expert Group presentation to eighth meeting of Marine Observation and.
Introduction to the training
AMICI WP1 – Management, coordination and dissemination
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
2nd Marine Board Forum: towards a European Network of Marine Observatories for monitoring and research Session 2: Projects and Initiatives Alan Edwards.
September 2015 – September 2017 Contractual obligations fulfilled & project on schedule and budget GA approval for both years 1st periodic report ‘approved’
ACTRIS – EMEP, THE WAY FORWARD
Assembly of Members – 12 March 2019
Preliminary Project Execution Plan
Assembly of Members – 12 March 2019
Job de Kleuver NWO-I/APPEC
Theme 14: IT normalisation and collaborative infrastructure for the ESS Agenda item 2.2 In Agenda 2000, the Commission proposed to bring together the.
Presentation transcript:

The KM3NeT Phase-1 Memorandum of Understanding P. Piattelli

Un po’ di storia Preparazione di un MoU decisa alla fine del 2011 Bozza di MoU presentata all’ASC ed alla collaborazione nella riunione conclusiva del Preparatory Phase a Catania in febbraio 2012 Avviate anche le procedure di elezione del management con la nomina di un search commitee (Coyle, Taiuti, de Wolf) Ad aprile brusco stop Ripresa delle discussioni con una riunione ad Erlangen il 22-23 giugno 2012 Al search committee affidato il management “ad interim” della collaborazione con obiettivo primario il completamento del MoU Sulla base del’agreement, preparata una nuova versione del MoU Draft presentato alla collaborazione nel meeting di Bologna del 5 ottobre Nuova versione presentata all’ASC a Catania il 4 dicembre 2012 P. Piattelli

The “Erlangen agreement” The string design is considered as the baseline KM3NeT detection unit subject to its validation; Italian groups will contribute to the validation of the string detection unit; The Italian PON budget will be used for a seafloor network at the Capo Passero site, and several detection units (towers and strings); the seafloor network will be designed to be compliant with both strings and towers; The seafloor network at the Capo Passero site will accommodate an additional number of strings produced by the KM3NeT Collaboration, at least equal to the number of strings realized with the PON budget; The tower construction will be planned in a staged way in order to switch to the string design at any time and as soon as it has been validated; The French budget for a neutrino telescope in the scope of the KM3NeT-MEUST project will be used to realize a shore station, a seafloor network in the Toulon area and several string detection units; The seafloor network at the Toulon site will be designed to accommodate string detection units; The Netherlands and Romania budgets will be used for the construction of string detection units. P. Piattelli

KM3NeT Memorandum of Understanding Current version is 7.0, presented to the ASC on december 4 2012 Memorandum of Understanding for collaboration in the implementation of the first phase of the KM3NeT Research Infrastructure Core MoU Annexes List of Funding Agencies and names of their representatives List of Institutes in the KM3NeT-phase1 Collaboration and names of their representatives to the Funding Agencies Present Participants in the KM3NeT-phase 1 Collaboration by Country and Institute Oversight and organizational structure of the KM3NeT-phase1 project Facilities of the KM3NeT-phase1 RI Subsystems of the KM3NeT-phase1 Research Infrastructure Technical Participation of the Parties in the KM3NeT-phase1 project Implementation schedule and milestones Definition of cost categories and Common Fund Values of Deliverables and Commitments of the Parties Publication Strategy and Conference Policy User Access Policy List of Acronyms Some annexes are ready, some needs still to be prepared P. Piattelli

Preamble (… i punti principali …) (f) The Parties concerned have established the baseline technology for the KM3NeT Detection Unit, which is described in the KM3NeT Technical Design Report as the flexible string option. (g) The Parties concerned have demonstrated that the optimal configuration for detection of neutrinos from Galactic sources consists of several instrumented volumes. (h) The Parties concerned have initiated joint actions to validate by means of field tests of Pre- Production Models the basic KM3NeT Detection Unit of the neutrino telescope. (k) The recent interest of the international particle and astroparticle physics community in a possible neutrino mass hierarchy measurement to be performed with the first phase of the KM3NeT neutrino detector. (m) The need to establish an international framework to coherently employ the available funds for implementation of the first phase of the KM3NeT Research Infrastructure. (q) The interest of institutes involved in the KM3NeT Design Study and the KM3NeT Preparatory Phase to form an international collaboration in order to build, install and operate the first phase of the KM3NeT Research Infrastructure in the Mediterranean Sea which houses a neutrino telescope and instrumentation for Earth and Marine science research as an essential step toward a second phase of extension of the neutrino telescope volume to several cubic kilometers.  (r) The intention of the Funding Agencies involved in the KM3NeT Preparatory Phase to establish a European Research Infrastructure Consortium (ERIC) as the legal framework for KM3NeT. P. Piattelli

1. Purpose 1.1 This Memorandum of Understanding (MoU) defines the first phase of the KM3NeT Research Infrastructure. Its purpose is to define the programme of work to be carried out for this phase and the distribution of charges and responsibilities among the Parties and Institutes for the execution of this work. It sets out organizational, managerial and financial guidelines to be followed by the Collaboration and the external scientific and technical review processes. 1.2 The first phase comprises the final prototyping and preproduction, engineering, construction, calibration, transportation, assembly, installation and commissioning of the elements which form the basis of the KM3NeT neutrino detector and the seafloor and shore station infrastructures and the operation of the installed neutrino detectors.   1.3 The first phase includes the preparation for the next phase of the KM3NeT neutrino detector with an instrumented volume of several cubic kilometers.  1.4 The first phase includes the installation of a node for connection of instrumentation for Earth and Sea Sciences (ESS-node) at the KM3NeT installation sites, which will be included in the intended EMSO network of cabled observatories. … 1.7 This MoU is the first step toward the intended establishment of a KM3NeT-ERIC (European Research Infrastructure Consortium), of which this MoU will form the basis for its statutes. P. Piattelli

Governance (dettagliata nell’annex 4) Antares Liaison Officer  GNO liaison Officer P. Piattelli

Technical participation (1) P. Piattelli

Technical participation (2) P. Piattelli

Values of deliverables and committments (TBD) P. Piattelli

Altri annessi sono pronti Descrizione delle facilities (annex 5) Descrizione dei sottosistemi (annex 6) Publicatiion strategy and conference policy (annex 11) User access policy (annex 12) Alcuni hanno bisogno di altre iterazioni: Annex 4: oversight and management Extra: Multidiscipline Officers Antares Liaison Officer  GNO liaison Officer Annex 9 Common Fund: out Annex 10 Commitments to be filled P. Piattelli