CITY OF LA PUENTE VALINDA COMMUNITY BIKEWAY PROJECT

Slides:



Advertisements
Similar presentations
ODOT Pedestrian and Bicycle Program Sheila Lyons, PE Local Area Government Conference 2011.
Advertisements

COMPLETE STREETS ROCHESTER, MINNESOTA September 28, 2011 Mitzi A. Baker, AICP Active Living Rochester Rochester-Olmsted Planning Department.
Titusville to Edgewater Bike Loop PD&E Study
Recreational Trails Program Terry Maxwell Maryland Scenic Byways / Recreational Trails Program Manager Office of Environmental Design State Highway Administration.
Sediment & Hydraulic Challenges in the City of Livermore December 11, 2008 Sediment Forum Alameda Creek Watershed.
Using LDRs to Implement Ped/Bike Change. LDRs – Land Development Regulations The collection of laws and regulations that govern the use of land, zoning,
Designing For Complete Streets In Nashville Metropolitan Government of Nashville and Davidson County, Karl F. Dean, Mayor John W. Lynch, Director, Department.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Alachua County Board of County Commissioners March 24, 2009 Main Street Milling & Resurfacing Project Project Update & Plan Approval.
Grand Canalscape Phase I: Phoenix Uptown and Gateway North Update Kerry Wilcoxon City of Phoenix Street Transportation Department Safety and Neighborhood.
Looking Back and Moving Forward: RENEW LA County & Choose Health LA Michael Leighs, MPP RENEW LA County/LA County DPH Made possible by funding from the.
Agreement with Town of Tioga, LLC. Total Cost Estimate: $6,420,000 Total Estimate for Agreement Portion: $3,700,000 Developer responsible for 9.7% of.
Altoona Outdoors. A Non-Profit Group with a mission to: Encourage Healthy Lifestyles in and around Altoona 2-3 year project: Complete a Trail System in.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2010/11 – 2014/15 Presentation to Board of County.
Regional Transportation Issues Infrastructure Maintenance New Facilities Air Quality Pollution Congestion Freeway System Surface Streets Income.
Project IDAgencyTitleRelevant Project ComponentCompletion Date LAE0332City of Long BeachLong Beach Park & Ride LotPRL with 400 parking spacesJune, 2014.
Grand Canalscape Phase I and II General Update October 30, 2015.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Department of Public Works Approval of a Journal Voucher Amending Projects in the FY 2011 Capital Improvement Program Budget and Appropriate $125,000 in.
BUDGET WORKSHOP FY13 April 4, City of Hendersonville Budget Workshop – April 4, 2012 GOALS and OBJECTIVES for 2013 To present a balanced budget.
SUCCESSFUL APPLICATION FOR HIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP) GRANTS Presented By: Patrick V. DeChellis Deputy Director Los Angeles County Department.
METRO PADYAKAN Walk and Bike Ways Go to Home Page.
Nevada County Community Development and Planning.
City of Belmont Pavement Reconstruction Project October 15, 2014.
Chapel Hill Parks and Recreation. “Networks of natural spaces which provide corridors connecting areas such as neighborhoods, parks, and schools.
Prospective Rural Additions Meeting JULY 15, 2015.
Phoenix Grand Canalscape Kerry Wilcoxon, P.E., PTOE City of Phoenix Street Transportation Department 65 th Arizona Roads and Streets Conference March 24,
Community Development Block Grant Alabama Department of Economic and Community Affairs Shabbir Olia.
Project Name County: X (Cuyahoga District #) Photo Type (All-purpose, Mountain Bike, Bike Lanes, etc.— pavement must be dedicated for non- motorized use.)
FUNDING AVAILABILITY & SAFETY PROGRAMS 3//21/2013.
USDOT TIGER Grant Program Tower Road Complete Street Reconstruction.
District 7 (Los Angeles and Ventura Counties) State Highway System San Gabriel Mountains National Monument Area SAN GABRIEL MOUNTAINS NATIONAL MONUMENT.
Preliminary Estimated Cost
Arizona Forward Update
Healthy Communities & Sustainable Growth
Grant Ave. 2-way/1-way Bikeway perhaps separated by fence, etc.
Affordable Housing and Sustainable Communities (AHSC) Program
Improvements to Stockton Street
Bicycling in Minneapolis Bicycle Master Plan/Protected Bikeway Update
Finance Committee & City Council October 10, 2016
The Central Avenue Connector Trail
Hesperian Boulevard Corridor Improvement Project San Lorenzo
City Council Meeting November 7, 2016
Jemtegaard Trail Project was originally funded by a Safe Routes to School (SRTS) which is a federal grant administered by WSDOT Total funding for design,
Bring Back Broad: A City of Mobile Complete Streets Initiative
Complete Streets: Making Connections
Texas Department of Transportation
2013 Specification Implementation
Capital Improvement Program
Transportation Projects
Measure A Financial Oversight Committee August 7, 2013
Bond Advisory Committee
Upcoming Major Projects Nevada Transportation Conference April 9, 2013
COACT ODOT Update September 13, 2018.
City of Wilmington Bike Plan Update
State Aid Standards Development
Geometric Design: General Concept CE331 Transportation Engineering.
Orange Grove Boulevard Complete Streets Project
2013 Specification Implementation
Protected Bicycle Lanes Finally Pedal Their Way to KC…
The Value of Partnerships By Mayor Terry Kernc Village of Diamond
Design Standards.
Monterey County Project Report for Measure X Expenditures
Metropolitan District | mndot.gov
2018 ALL CITY BASEBALL: OPEN DIVISION
Proposed I-710 Early Action Project City of Huntington Park Slauson Avenue Capacity Enhancement Improvements I-710 TAC Meeting August 2018.
Interlocal Cooperative Agreement FY 20
Presentation transcript:

CITY OF LA PUENTE VALINDA COMMUNITY BIKEWAY PROJECT MTA 2013 CALL FOR PROJECTS GRANT APPLICATION COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS John Burton

Valinda Community Bikeway Access Improvements Project LACDPW - $3.1 million grant application MTA Call For Projects MTA funds $2.5 million County match $576,000 City of La Puente match $36,000 Improvements in the City of La Puente include: Class 1 Bike Path along 0.7 miles of the Puente Creek Flood Control Channel 0.48 miles of Class II bike lane along City portion of N. Sunset Ave Bikeways are included in County of Los Angeles Bicycle Master Plan Discussion of project benefits & components Implementation plan Request for a letter of support

Amar Road

Puente Creek near Valinda Avenue Puente Creek looking towards Del Valle Ave

Dominguez Channel Bike Path 98 miles of LACDPW bike paths

Sample of a Class II bikeway

Puente Creek bike path components 12 foot wide pavement section New fencing along bike path New asphalt pavement 2018 Improvements in the City of La Puente Signal at Puente Creek & Hacienda Bl N. Sunset - 0.48 miles of Class II bike l lane on City side of street Total cost of signal & bike lane $178,000 20% Local match - for City of La Puente I is $36,000

Bike Paths can provide: Recreation Transportation Sense of community ftp://dpwftp.co.la.ca.us/pub/PDD/Bikepath_La_Puente/

LACDPW request City of La Puente support for the project. If selected for funding: LACDPW would work with City of La Puente to hold community meetings for the project With the City’s concurrence after the community meetings LACDPW would proceed with the project Invite the City to participate in funding the $36,000 local match for the signal for the Puente Creek bike path on Hacienda Blvd and City side of the N. Sunset Bike Lane in Fiscal Year 2018. Obtain environmental clearance Design plans, advertise and award project Construct project in 2018 LACDPW would maintain the bike path