Objective ATC 02.7 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR 13.09.2013.

Slides:



Advertisements
Similar presentations
Objective ENV01 ESSIP Plan 2013 Bernd HILL DSS/EIPR
Advertisements

Objective AOM 19 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective ATC 16 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective ATC 12 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective AOM 21 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
LSSIP Objective AOP04.2.
Objective SRC-CHNG ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR
LSSIP Objective AOP04.1.
Objective ATC 02.6 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR
European Single Sky ImPlementation ESSIP DEVELOPMENTS Reference: SCG/10/AP05 – Action Paper 05 Christian Coëffé Head of European Single Sky Implementation.
Objective ENV02 ESSIP Plan 2013 Bernd HILL DSS/EIPR
Objective SAF11 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR
Objective ITY-FMTP - Apply a common flight message transfer protocol (FMTP) ESSIP Plan 2013 Oscar ALFARO DSS/EIPR
Objective ATC 15 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective ITY-COTR ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective COM11 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Objective COM09 - Migrate ground international or regional X.25 data networks or services to the Internet Protocol (IP) ESSIP Plan 2013 Oscar ALFARO DSS/EIPR.
Objective SRC-SLRD ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR
Objective NAV03 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Objective ATC 17 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective ITY-AGDL ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective INF07 ESSIP Plan 2014 Ana Paula FRANGOLHO DSS/EIPR
The European Organisation for the Safety of Air Navigation Objective AOP04.1.
Objective ITY-SPI ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
LSSIP Objective AOP04.2.
Objective ITY-SPI ESSIP Plan 2013 Ana Paula FRANGOLHO DSS/EIPR
Objective ATC 15 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective ATC 12 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective ATC 17 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective COM11 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective COM10 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective AOM 19 ESSIP Plan 2014 Agnieszka DYBOWSKA DPS/PEPR
Objective ATC 02.6 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR
Objective ATC 02.2 ESSIP Plan 2014 Ingrid FEIJT DPS/PEPR
Objective ITY-ADQ ESSIP Plan 2014 Ana Paula FRANGOLHO DSS/EIPR
Objective FCM03 ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
Objective ATC 16 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective AOM 21 ESSIP Plan 2014 Agnieszka DYBOWSKA DPS/PEPR
Objective ATC 02.7 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR
Objective FCM04 ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
Objective SRC-RLMK ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR
Objective ATC 02.2 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR
Objective FCM01 ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
The European Organisation for the Safety of Air Navigation Objective AOP03.
Objective ITY-FMTP - Apply a common flight message transfer protocol (FMTP) ESSIP Plan 2015 Oscar ALFARO DPS/PEPR
Objective FCM05 ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
Objective ATC 07.1 ESSIP Plan 2013 Luca DELL’ORTO DSS/EIPR
WORKSHOP ON COMMON REQUIREMENTS FOR SERVICE PROVISION  Introduction to SESIS Guidance Material  Gerald Amar, SESIS Project Manager European Organisation.
Juan Vázquez Sanz EUROCONTROL SRU
Objective ATC 07.1 ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
Objective ITY-ADQ ESSIP Plan 2015 Ana Paula FRANGOLHO DPS/PEPR
Objective ITY-COTR ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
Objective ENV02 ESSIP Plan 2015 Bernd HILL DPS/PEPR
Objective NAV10 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective COM10 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Workshop on preparations for ANConf/12 − ASBU methodology
Objective AOM 19 ESSIP Plan 2015 Agnieszka DYBOWSKA DPS/PEPR
LSSIP Objective AOP05 Note: objective postponed 12 months in ESSIP Plan Edition 2015.
Objective NAV03 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
LSSIP Objective AOP04.1.
Objective ATC 02.7 ESSIP Plan 2015 Ingrid FEIJT DPS/PEPR
Objective INF04 ESSIP Plan 2015 Ana Paula FRANGOLHO DPS/PEPR
Objective ITY-ACID ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
Objective COM11 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective ITY-AGDL ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective ITY-AGVCS2 ESSIP Plan 2015 Oscar ALFARO DPS/PEPR
Objective ATC 16 ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
LSSIP Objective AOP03.
Workshop on preparations for ANConf/12 − ASBU methodology
Presentation transcript:

Objective ATC 02.7 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR 13.09.2013

Comprehensive Explanation (1/2) Implementation of Approach Path Monitoring (APM) functions. Can be considered as an extension of MSAW (alert to a/c proximity to terrain or obstacle) in the final approach. ECAC applicability (except Georgia, Greece and Slovak Republic). Depending on airspace organisation, it might include a lower portion of TMAs and CTR. This objective is not applicable to the en-route airspace. Military applicability: Military ANSPs that provide radar service to GAT traffic. ESSIP Plan 2013 / Objective ATC 02.7

Comprehensive Explanation (2/2) APM checks the extrapolated track positions (based on Surveillance data-current track position performing a linear extrapolation using detected ground speed and rate of climb/descent), applying QHN correction and identifies the predicted or actual conflicts against the terrain during the final approach. Terrain can be build up using digital terrain data or set of polygons that sufficiently accurate shape the vertical environment. FP data is not used. APM requires an appropriate presentation of predicted / actual conflicts to the tactical controllers and ATC supervisor. APM requires careful optimalisation / tuning to minimise false alarms. ESSIP Plan 2013 / Objective ATC 02.7

What is new or has changed for ESSIP Plan edition 2013 Removal of Georgia, Greece and Slovak Republic from the applicability list. ESSIP Plan 2013 / Objective ATC 02.7

Link to European ATM Master Plan [CM-0801] – Ground Based Safety Nets (TMA, En Route) ESSIP Plan 2013 / Objective ATC 02.7

Most important SLoA(s) ASP01 “Implement the APM function. Put into service ground-based safety tool systems and associated procedures supporting the APM function.” ASP to check the compliance of the implemented APM with the requirements stated in the specification, the related guidance material and the relevant training and safety requirements. ESSIP Plan 2013 / Objective ATC 02.7

Finalisation Criteria Ensure that Ground systems have been upgraded to support the APM function. Ensure that the technical file (TF) with evidences of compliance and the EC declaration of verification of systems (DoV) has been delivered to the competent National Supervisory Authority (NSA). Ensure that the APM function is in operational use. Ensure that the training plans have been updated and a training package has been developed by the ANSP for the use of APM functions. ESSIP Plan 2013 / Objective ATC 02.7

Supporting Material The EUROCONTROL specification for APM issued in May 2009 (edition 0.9) which is still a draft. The EUROCONTROL Guidance Material for APM issued in May 2009, Edition 1.0 This if for guidance only, and is not compulsory. ESSIP Plan 2013 / Objective ATC 02.7

ESSIP Plan 2013 / Objective ATC 02.7 ESSIP Report 2012 The progress implementation is stagnant, compared to 2011. Majority of the States declared to have plans for implementation by end 2013. Achieving ATM MP (IP1) in time could be jeopardised. ESSIP Plan 2013 / Objective ATC 02.7

ESSIP Plan 2013 / Objective ATC 02.7 Contacts Objective Coordinator: FEIJT, Ingrid +32 2 729 5044 ingrid.feijt@eurocontrol.int DNM Objective Expert(s): BAKKER, Ben +32 2 729 3149 ben.bakker@eurocontrol.int DROZDOWSKI, Stanislaw +32 2 729 3760 Stanislaw.DROZDOWSKI@eurocontrol.int ESSIP Plan 2013 / Objective ATC 02.7