ProtoDUNE Installation Workshop - DAQ

Slides:



Advertisements
Similar presentations
1 Timescales Construction LCR MICE Beam Monitoring counters + DAQ My understanding Jan 07 Feb 07 Mar 07 Apr 07 May 07 Jun 07 Jul 07 Aug 07 Sep 07 ISIS.
Advertisements

Status of the digital readout electronics Mauro Raggi and F. Gonnella LNF Photon Veto WG CERN 13/12/2011.
MSS, ALICE week, 21/9/041 A part of ALICE-DAQ for the Forward Detectors University of Athens Physics Department Annie BELOGIANNI, Paraskevi GANOTI, Filimon.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
DAQ & ECS for TPC commissioning A few statements about what has been done and what is still in front of us F.Carena.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Management of the LHCb DAQ Network Guoming Liu * †, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
Clara Gaspar, March 2005 LHCb Online & the Conditions DB.
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
News on GEM Readout with the SRS, DATE & AMORE
MINER A Operations Report All Experimenters’ Meeting Steve Hahn, FNAL July 1, 2013.
NTOF DAQ status D. Macina (EN-STI-EET) Acknowledgements: EN-STI-ECE section: A. Masi, A. Almeida Paiva, M. Donze, M. Fantuzzi, A. Giraud, F. Marazita,
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
Installation status Control Room PC farm room DetectorsEB Infrastructure 918 ECN3.
DØ Online Workshop3-June-1999S. Fuess Online Computing Overview DØ Online Workshop 3-June-1999 Stu Fuess.
CD FY09 Tactical Plan Status FY09 Tactical Plan Status Report for Neutrino Program (MINOS, MINERvA, General) Margaret Votava April 21, 2009 Tactical plan.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
New DAQ at H8 Speranza Falciano INFN Rome H8 Workshop 2-3 April 2001.
1 Farm Issues L1&HLT Implementation Review Niko Neufeld, CERN-EP Tuesday, April 29 th.
ECAL Off detector Electronics Workshop Lisbon April T. Camporesi ECAL activity sites 2005 Integration (now) 904 (now) Cosmic ray calibration (May)
Infrastructures and Installation of the Compact Muon Solenoid Data AcQuisition at CERN on behalf of the CMS DAQ group TWEPP 2007 Prague,
Status of the NA62 network R. Fantechi 23/5/2012.
Progress and plans for HO Installation S. Dugad, K. Sudhakar Tata Institute of Fundamental Research India-CMS Meeting at BARC, July 2005.
Single phase ProtoDUNE detector installation Plans and Constraints Jack Fowler Duke University 23-Feb-2016.
R. Fantechi 2/09/2014. Milestone table (7/2014) Week 23/6: L0TP/Torino test at least 2 primitive sources, writing to LTU, choke/error test Week.
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
CMS DAQ project at Fermilab
CERN Giovanna Lehmann, Xavier Pons
Data Acquisition, Diagnostics & Controls (DAQ)
Giovanna Lehmann Miotto CERN EP/DT-DI On behalf of the DAQ team
DCS Status and Amanda News
WP18, High-speed data recording Krzysztof Wrona, European XFEL
INSIDE in-beam PET system assembly and test at INFN Torino
Cabling for LHCb Upgrade
CLAS12 DAQ & Trigger Status
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
U.S. ATLAS TDAQ FY06 M&O Planning
LKr status R. Fantechi.
Rack Design Proposal as of 01/03/2013
Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016
ProtoDUNE SP – Slow control Status
PC Farms & Central Data Recording
Enrico Gamberini, Giovanna Lehmann Miotto, Roland Sipos
Injectors BLM system: PS Ring installation at EYETS
TPC Commissioning: DAQ, ECS aspects
Controlling a large CPU farm using industrial tools
T1 Electronic status Conclusions Electronics Cards:
PMD PMD Plans Detector Issues and solution Plans for LS1 29 June 2012.
EMU Slice Test Run Plan a working document.
SPD – ALICE DAQ/ECS/Trigger Integration Status Report
Fiber Installation for RUN 3&4
ProtoDUNE SP DAQ assumptions, interfaces & constraints
Computing Infrastructure for DAQ, DM and SC
The LHCb Event Building Strategy
Pierluigi Paolucci - I.N.F.N. Naples
Example of DAQ Trigger issues for the SoLID experiment
TDAQ commissioning and status Stephen Hillier, on behalf of TDAQ
LHCb Trigger, Online and related Electronics
Pierluigi Paolucci & Giovanni Polese
Status Report and highlights from workshop II
Plans for the 2004 CSC Beam Test
CSC Electronics Installation and Commissioning Oct ‘06
CSC Electronics Installation and Commissioning CSCE I&C
Presentation transcript:

ProtoDUNE Installation Workshop - DAQ Giovanna Lehmann Miotto (CERN/EP-DT-DI) on behalf of the DAQ team

The Trigger and DAQ System Primary Scope Readout 2MHz samples from TPC Readout (self) triggered samples from Photon Detectors Select data corresponding to an external (beam) trigger Store raw data on disk and transfer them to EOS Monitor the proper functioning of the DAQ and trigger Monitor the quality of the acquired data Steer data taking operations (run control, configuration, UIs) Ancillaries Archive configurations and metadata by run (in addition to what is contained in raw data files) Archive operational monitoring data Provide Web access to archived information (data quality, operational monitoring, run numbers DB, …) Readout parts of the beam instrumentation Readout muon tagger ProtoDUNE SP Installation Workshop G. Lehmann Miotto, 21.04.17

Vertical Slice Setup New quad server A small fraction of the DAQ system to develop, validate and integrate the main functions of the DAQ in a “sterile” environment A test bench for integration of the TPC and PD readout electronics (WIB, SSP) Readout Timing Trigger input Size of vertical slice is ~sufficient for the Cold Box test Test setup will be transferred to EHN1 and used for Cold Box A parallel system will be installed at EHN1 for continued DAQ development RCE Timing SBND WIB ProtoDUNE SP Installation Workshop G. Lehmann Miotto, 21.04.17

Integration and Testing Status Organized around so-called milestone weeks every 4-6 weeks First weeks focused on DAQ internal tests Next milestone week (May 8th-12th) will focus on integration of WIB and SSP External dependency In May/June move to EHN1 Site Network (CERN IT starpoint on Jura side) Populate DAQ racks System setup and administration Fibre connections to Cold Box ProtoDUNE SP Installation Workshop G. Lehmann Miotto, 21.04.17

DAQ/Computing Rooms Racks Populating racks Equipment ~ purchased Delivery Apr 26th-27th (18 racks) Mechanical installation Connection to water Power distribution Racks/power control and monitoring Network switches and cables Populating racks Upper floor -> PCs for processing (DP+SP) Transport + mechanical installation Connect power cords Connect network cables (LABELING) Boot and stress-test Lower floor -> DAQ (DP+SP) Idem Equipment ~ purchased ProtoDUNE SP Installation Workshop G. Lehmann Miotto, 21.04.17

Preliminary Network Design TN GPN NP02 EOS-IT NP04 Starpoint Jura 1/10 Gbps Farm node NP02 DCS Farm node Farm Rack Farm node Farm Rack Farm node Ctrl node Farm Rack Farm node Ctrl node NP02 Ctrl Farm Rack Ctrl node Farm Rack Ctrl node NP02 Router 1/10 Gbps NP04 Ctrl 10/40 Gbps 1/10 Gbps Storage node Preliminary Storage node Files to/from EOS NP04 DCS2 Storage node Storage node Files to EOS NP04 Router 1/10 Gbps Readout node Readout node Readout node Edge Router 10 Gbps DataFlow DAQ node DAQ node DAQ node 40 Gbps EB node DAQ node 2x40 Gbps EB node DAQ node EB node DAQ node 1/10 Gbps NP02 NP04 DCS1 EOS-IT NP04 Network Design

Preliminary DAQ Racks Layout NP02 DAQ ProtoDUNE SP Installation Workshop G. Lehmann Miotto, 21.04.17

DAQ Installation for Cold Box After completion of the mentioned pre-requisites Setup of network, PC’s DAQ sw/fw installation Dry runs from RCE -> storage Basic test storage -> EOS Fibre connection to cold box ProtoDUNE SP Installation Workshop G. Lehmann Miotto, 21.04.17

DAQ Fibres routing Cold Box ✗ ✗ ProtoDUNE SP Installation Workshop G. Lehmann Miotto, 21.04.17

Fibres to Cold Box ProtoDUNE SP Installation Workshop G. Lehmann Miotto, 21.04.17

Cold Box Connectivity Order sent 5 WIBs -> 5 MPO fibre connections, 5 dual LC fibre connections (Ethernet), 1 LC SM fiber (timing) 4 SSPs -> 4 dual LC fiber connections (Ethernet), 4 ST fiber connections (trigger input), 4 LC SM fiber (timing) Order sent J-M Lassauce ProtoDUNE SP Installation Workshop G. Lehmann Miotto, 21.04.17

DAQ Installation for Cold Box Fibre installation and connection Requires cable trays Requires fibres and skilled cablers Test WIB -> storage SSP -> storage Test full chain with EOS transfer ProtoDUNE SP Installation Workshop G. Lehmann Miotto, 21.04.17

Cold Box Testing Commission Timing – WIBs – Readout - Event Building – Storage When will the WIBs be installed on the cold box side? DAQ testing time needed before we can actually be useful to APA testing! Commission Timing – SSP - Readout - Event Building – Storage When will the SSPs be installed on the cold box side? Introduce basic data monitoring algorithms Input on what is useful must come mostly from detector experts Target for having all this done by July ProtoDUNE SP Installation Workshop G. Lehmann Miotto, 21.04.17

Cold Box: Which tests? It would be very useful for DAQ to get information on which types of Cold Box tests will need the DAQ Check that we have correct resources Check that we have correct functionality (monitoring!) Setup minimal tools and training for operators ProtoDUNE SP Installation Workshop G. Lehmann Miotto, 21.04.17

Towards Cold Box – Manpower Manpower for DAQ development is OK Manpower for EHN1 installation to be identified among CERN based people (short term, variable planning) CERN EP/DT-DI (E. Gamberini, R. Sipos, G. Lehmann Miotto + expert technicians/engineers where needed) FNAL (G. Savage, R. Acciarri) Liverpool (K. Hennessy) SLAC (P. K.V. Tsang) Manpower for system & network setup/administration FNAL (G. Savage) CERN/IT-CS (M. Collignon, F. Lerda) -> needs planning Manpower for DAQ integration, commissioning, debugging Needs experts on site -> needs planning + funding Peak in data monitoring development expected in August/September Needs sufficient developers on site -> needs planning + funding ProtoDUNE SP Installation Workshop G. Lehmann Miotto, 21.04.17

From the Cold Box to the Final DAQ Installation of additional DAQ components at EHN1 will continue throughout the second half of 2017 Independent data acquisition slice w.r.t. Cold Box will allow to continue development and integration E.g. Trigger system Ability to readout 3 APAs in final position as of beginning of November Requires installation of fibers patch panel in sub-rack at flange PD DS-BL Requires final purchasing of fibers (July 2017) Requires sufficient DAQ (readout) equipment on site DAQ aims at being ready for full readout at the end of 2017 ProtoDUNE SP Installation Workshop G. Lehmann Miotto, 21.04.17