Eagleview Compost Dairy Barn Construction Costs

Slides:



Advertisements
Similar presentations
The process whereby human beings convert raw materials into finished products or useful goods designed to make ____ product ______ one on-site.
Advertisements

SEN In, Out and Beyond The Journey Of A Yoghurt!
KCDC Knox County Development Corporation Virtual Building 50,000 SF Manufacturing- 4,300 SF office building.
Chapter 6: Animal Housing Features © 2005 Thomson Delmar Learning. All rights reserved.
“Have U Heard” Round Table for Kids in Need RT Austria AGM Vienna Colombo Round Table 1.
FATALITY REPORT 10/01/03 – 09/30/04. FY - 04 Fatalities By Area Office 267 Total Atlanta East = 20 Atlanta West = 29 Birmingham = 27 Columbia = 2 Ft.
The Foundations of Farmstead Planning Brian J. Holmes Extension Agricultural Engineer Biological Systems Engineering Dept. College of Agricultural & Life.
3,000Ft 4,000Ft 5,000Ft O2O2 O2O2 O2O2 O2O2 O2O2 O2O2 O2O2 O2O2 O2O2 O2O2 O2O2 O2O2 O2O2 O2O2 O2O2 O2O2 O2O2 O2O2.
KITCHEN planning guide merillat - woodharbor - ultracraft - executive CLIENT INFORMATION Date___________________________ Name________________________________Phone.
TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]
Modernizing Wisconsin’s Dairy Farms Train the Trainer Workshop June 20 – 21, 2002 Dairy Expansion Financial Case Studies by Scott Gunderson, Manitowoc.
Employment Level: 375+ Contract Relationships: 300+ Midwest Operations: 4 States (IA, IL, OK, CO) Sow Inventory: 60,000+ Finish Inventory: 750,000+
The Story of Milk By: Audrey Harmon.
Click, Clack, Moo: Cows That Type
Heat Stress Lessons Learned and Reducing the Impact 134 Call Hall Manhattan, KS Dr. Micheal Brouk OABP Spring Meeting.
© OnCourse Learning. All Rights Reserved. Basic House Construction Learning Objectives  List the primary styles of residential architecture  Describe.
How to Build Your Playhouse. September 08, 2006 By Kay Adams, Tamecha Buck, Janet Herron & Lisa Weston “Click on pictures”
Building Plans.
Construction Drawings
A Small-Scale Washing and Cooling Unit
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Sam Womble County Extension Agent Victoria County.
Agricultural enterprise Malynivske Zhytomyr region Malyn district Village Malynivka Tel
Pool Project SWIMMING POOL 3500sq ft. DECK AREA 7000sq ft. SHELTER400sq ft. EQUIPMENT ROOM/STORAGE SHELTER 1400sq ft.
Shivam Patel CM Option Technical Assignment 1 Dr Ed Gannon September 16 th 2013 Image courtesy of Hines.
WALLS.
IET 120 CONSTRUCTION PROJECT Name: Elizabeth McClain.
Orthographic Drawings
F ACILITIES, P LANNING, AND C ONSTRUCTION December 14, 2015 – Monthly Construction Report.
Don Lanzon Chi Kim Le Eric Nilsson Rachel Wong cows that get milked twice a day + 4 barns containing 10 cows each + Each employee manages a barn.
POOL CONSTRUCTION THE 5 MAJOR STEPS 1. Plan2. Dig3. Build4. Finish 5. Swim!
City of n Tigard Respect and Care | Do the Right Thing | Get it Done Presented to Tigard City Council April 26, 2011 Small Capital Construction Projects.
Lactation Curve Topic 3091 Basic Concepts Melinda Klockziem.
Click, Clack, Moo By: Brittany Collins Maegan Hart Kennedy McCain.
Milking Center Wastewater Treatment Created by Josh Appleby, MAEAP Verifier, MDA.
A REPORT ON PRACTICAL TRAINING CONDUCTED AT PUBLIC WORK DEPARTMENT(PWD),KOTA FROM 15/6/2011 TO 14/7/2011 Submitted to: Mr. Rajneesh Sharma HOD {Civil Dep.}
IET 120 Project #4 Matthew Porter Construction Project.
POSITION SENSOR. PHOTO ELECTRIC SENSOR THROUGH BEAM METHOD. RETRO-REFLECTIVE METHOD.
The Invisible Dome Home Luxury Underground Dome Home on 40 Acre Estate
Rotating Compost Barrel Construction
MICROSOFT PROJECT MODULE 2 - BUILD A HOUSE.
Bond Oversight Committee
Construction prodecure of Building
Locomotion and Body Condition Scores
Multistory Office Building
Southeast Financial Center
HOUSING FOR DAIRY CATTLE a)Selection of site for Dairy Farm 1
The Story of Milk.
JOURNEY OF MILK.
Burt Motors – 1020 East Omaha Ave., Norfolk, NE
A Contractor and Supplier Workshop Schools Capital Improvement Program
Charts from: “Grazing Dairies: What happens to milk production and income?”
Minuteman Vocational Technical Regional High School Progress
شیر خشک Formula.
Data review MILK VALIDATION
10 The Cost Approach—Part I: Reproduction/Replacement Cost
E D F C G A H B Building Dimensions Square Footage Access Structure
Floor Plan A horizontal section view of a structure taken about 4’ from floor level, It shows all exterior and interior walls, doors, windows, patios,
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Compost Turning Protocols
Dairy Leaders of Tomorrow Lesson 1.3
In-Class Scheduling Exercise

Minuteman Vocational Technical Regional High School Progress
Key Words Unit 3 ● Week 4 impatient.
Eagleview Compost Dairy Barn
Long term planning.
This is my personal job for an Erasmus + project.
“Intro to Blueprint Reading”
Milk is a valuable commodity
Presentation transcript:

Eagleview Compost Dairy Barn Construction Costs 2 pack barns without the milking center Cost per cow Total 294 cows 327 cows 368 cows Cost 100Ft²/cow 90 Ft²/cow 80 Ft²/cow General Construction $460,000 $1565 $1407 $1250 w/ Curtain Sidewalls Excavation & Drainage $65,000 $221 $199 $177 Clay Lining $15,000 $51 $46 $41 Concrete $138,500 $471 $424 $376 Electrical & Plumbing $35,000 $119 $107 $95 Overhead Doors $18,200 $62 $56 $49 Total $731,000 $2,489 $2,238 $1,988