STF Wire Position Monitor

Slides:



Advertisements
Similar presentations
Hardware Integration of the Prototype Wes Grammer NRAO September 24-26, 2012EOVSA Prototype Review1.
Advertisements

FAR-IR OPTICS DESIGN AND VERIFICATION EXPERIMENTAL SYSTEM AND RESULTS Final Meeting “Far-IR Optics Design and Verification”, Phase 2 27 November 2002,
Jixie Zhang Javier Gomez Oleksandr Glamazdin Roman Pomatsalyuk Vadym Vereshchaka Hall A Collabortion Meeting, Dec 2012 Hall A Moller Polarimeter 12 GeV.
Liquid H 2 Absorber Production Contents (1)MICE Absorber Status (2)MICE Absorber Modification (3)Plan/Schedule (4)Summary MICE CM-23 in HARBIN Shigeru.
RD S. Aune CEA/IRFU Micromegas Bulk for CLAS12 vertex tracker.
Internal sensors Josep Amat and Alícia Casals Automatic Control and Computer Engineering Department.
1 Heinz-Dieter Nuhn 1 BFW Results June 2009 FAC BFW Results Heinz-Dieter Nuhn – LCLS Undulator Group Leader June 9, 2009.
Beam Loss Analysis Tool for the CTF3 PETS Tank M. Velasco, T. Lefevre, R. Scheidegger, M. Wood, J. Hebden, G. Simpson Northwestern University, Evanston,
Comet observing program: Water in comets: water ice ~50% of bulk composition of cometary nuclei water vapor: sublimation drives cometary activity close.
Prototype Mechanical / optical considerations 1.Current LED system performance 2.New APD / Fiber /Strong Back integration scheme.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
IP-BPM NOV. BEAM TEST RESULTS Siwon Jang (KNU). 11cm Low-Q IP-BPM design  11cm Low-Q IP-BPM drawings of HFSS 100mm Sensor cavity Wave guide Antenna Designed.
High Resolution Cavity BPM for ILC final focal system (IP-BPM) ILC2007/LCWS 2007 BDS, 2007/6/1 The University of Tokyo, KEK, Tohoku Gakuin University,
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
Apex Target Marco Oriunno, April 23, Design and fabrication by: Marco Oriunno, Dieter Walz, Jim McDonald, Clive Field, Douglas Higginbotham, and.
Franz Peters, Georg Gassner WPM/HLS Status and June 17 th, WPM & HLS Status and Schedule Franz Peters, Georg Gassner.
HPS Collaboration Meeting JLAB, May Tracker Design Status M.Oriunno, SLAC.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
D. Missiaen Summaries of the discussion. 2 H. Mainaud Durand The iris diaphragm laser alignment system for Spring 8 storage ring magnets Align multipoes.
The Development of the Bunch Length Detector (BLD) KIM Joon Yeon, KIM Do Gyun, BHANG Hyoung Chan, KIM Jong Won 1, YUN Chong Cheoul 2 Seoul National University,
Malte Hildebrandt, PSIMEG - Review Meeting / 1   e  Drift Chambers Charge Division Test Chamber Testsetup for Cosmics Chamber Construction.
G5 Beam Instrumentation D. Gassner, E. Pozdeyev 4-09.
Requirements concerning the interface linking the BPM to the quadrupole M. Wendt, S. Zorzetti.
At the HERA collider in Hamburg an experiment (ZEUS) has been built to study electron-proton collisions. For the near future an upgrade of this experiment.
Renovation of the 200 MHz RF system LLRF issues. Cavities redistribution 26 October th LIU-SPS Coordination Meeting 2  2011 : 4 cavities 2 x 4.
Collimator BPM electronics – Results from the lab, SPS and LHC
5. 4 Resolution The impulse can be separated is given by the resolution. The number of impulse can be distinguished in one quadrant of a 50c/s sine wave.
19 April 2007J.Pater - FP420 Alignment1 FP420 Detect off-momentum protons at 420m from the interaction point, due to e.g. diffractive events in ATLAS/CMS.
Multi-OTR Status A.Faus-Golfe, J.Alabau, C.Blanch, J.V.Civera, J.J.García Garrigós IFIC (CSIC-UV) D.McCormick, G.White, J. Cruz SLAC aand KEK team.
Beam Test status and Plans of the ILC Main LINAC BPM
SuperNova / Acceleration Probe Thermal System Wes Ousley November 16, 2001.
An electron/positron energy monitor based on synchrotron radiation. I.Meshkov, T. Mamedov, E. Syresin, An electron/positron energy monitor based on synchrotron.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
D. Attié, P. Colas, E. Delagnes, M. Riallot M. Dixit, J.-P. Martin, S. Bhattacharya, S. Mukhopadhyay Linear Collider Power Distribution & Pulsing Workshop.
SSR1 Cryomodule Development for PXIE - Alignment T. Nicol Decenber 6, 2011.
Detail plan of S1-Global H. Hayano (KEK),
5 K Shield Study of STF Cryomodule (up-dated) Norihito Ohuchi KEK 2008/4/21-251FNAL-SCRF-Meeting.
Technical Design for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
Status of TRIUMF Prototype Studies Christopher Hearty University of British Columbia/IPP May 31, 2010.
LCLS Digital BPM Processor for ATF2 Extraction Line BPMs Steve Smith 26 August 2009.
FGT Magnet C Assembly metric tons (59 US tons) -100mm thick steel plates -6.6m high x 3.1m wide x 1m deep (outer dimensions) -5m high x 2.25m wide.
Location of SVD Temperature and Humidity Monitors L.Vitale & L.Lanceri INFN & Univ. Trieste 6 th VXD Workshop, 02/10/2014 SVD parallel for discussion Sep.
1CEA/ Saclay/ SACM CARE/SRF/WP11 Development of a new Beam Position Monitor for FLASH, XFEL and ILC Cryomodules Claire Simon, Michel Luong, Stéphane Chel,
Tracking Session, Groningen, August 30th, News from Krakow on the Forward Tracker J. Smyrski Institute of Physics UJ Model of the tracking stations.
LEReC BPM Status P. Cernigla, R. Hulsart, R. Michnoff, Z. Sorrell June 2, 2016.
5K shield removal experiment in STF cryomodule Norihito Ohuchi 2008/11/181ILC08-GDE-Meeting (CHICAGO)
Tutorial On Fiducialization Of Accelerator Magnets And Undulators
Cosmic Microwave Technology, Inc.
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
S1G Experiment Schedule Plan
Re-entrant BPM R&D for ILC Main Linac
KNU IP-BPM and Reference cavity
Performance of an Automated Water Based Cooling System for CBM MuCh
S1-G cryomodule assembly status
LumiCal mechanical design, integration with LDC and laser alignment
Services Layout – Update
Power pulsing of AFTER in magnetic field
Need for Alignment Position of off-momentum proton w.r.t. beam
RF cables calibration Matteo Volpi Thomas Geoffry Lucas
CERN – GSI – TUD WEBMEETING
Summary of the checking items of the Module-C design
Observational Astronomy
Department of Physics and Astronomy,
CEPC Input Coupler Discuss 6th IHEP-KEK SCRF Collaboration Meeting
Status of muon monitor R&D and construction
CH-6 CABLE TV.
Scanning Electron Microscopy (SEM)
Possible types of Si-sensor: SILICON CALORIMETRY FOR A LINEAR COLLIDER G.Bashindzhagyan, Il Park August Silicon sensor.
Breakout Session SC3 – Undulator
Presentation transcript:

STF Wire Position Monitor 12.09.2008 H. Hayano

WPM system overall names on the reading software GRP1 GRP2 GRP3 GRP4 CAV1 CAV2 CAV3 CAV4 CAV5 CAV6 CAV7 CAV8 names on the reading software Module A Module B ch1 GRP1 ch9 CAV1 ch17 GRP6 ch25 CAV9 ch2 GRP2 ch10 CAV2 ch18 GRP7 ch26 CAV10 ch3 GRP3 ch11 CAV3 ch19 GRP8 ch27 CAV11 ch4 GRP4 ch12 CAV4 ch20 GRP9 ch28 CAV12 ch5 GRP5 ch13 CAV5 ch21 GRP10 ch29 CAV13 ch6 no connection ch14 CAV6 ch22 ch30 CAV14 ch7 ch15 CAV7 ch23 ch31 CAV15 ch8 ch16 CAV8 ch24 ch32 CAV16

WPM attachment on the holder plate

WPM detector body Cat’s Eye Holder Cat’s Eye

WPM mount and coordinate system example of TESLA shape cavity WPM + Y WPM V1 + look from beam upstream V4 V2 X WPM V3 look from beam upstream

connection between WPM, and both end of wire outer φ32 1.5t aluminum pipe connection to avoid signal loss.  (140MHz CW wave transmission) These are aluminum foil on the Mylar cylinder 500g weight

7μm diameter Tungsten Wire stretch for 10m ティルトメーター sag was 1.4mm (estimation was 1.475mm) *36m module 19.1mm sag wire length (m)

Detector circuit Vout= 9.544e-5*exp(1.307*Vdet) 140MHz-CW Oscillator module A the same set is prepared for module B signal multiplexer CAVITY GRP LOG detector characteristics LAN multiplex control controller AD8307 4ch 16bit ADC Vout= 9.544e-5*exp(1.307*Vdet) 140MHz LOG detector

+/- 2mm mapping example formula: X = kx * (V2-V4)/(V2+V4) Y = ky * (V1-V3)/(V1+V3) linear approximation Kx=Ky=7.262 mm difference from wire position set value full width140μm error

Resolution in case 5μm step wire movement estimated resolution will be less than 5micron

Detected wire movement for GRP-WPM [X direction] 300K -> 4K: δX1 = +0.8mm δX2 = +0.8mm δX3 = +1.3mm δX4 = +0.6mm δX5 = +0.4mm green data jump come from electrode-connector connection unstable.

Detected wire movement for GRP-WPM [Y direction] 300K -> 4K: δY1 = ??? δY2 = -0.2mm δY3 = -0.3mm δY4 = -1.8mm δY5 = +2.4mm scattered data come from electrode-connector connection unstable.

GRP temperature variation during cool down

Upgrade of WPM (1) Electrode – connector connection change from solder to spot welding (next month). (2) signal cable change to more strong one (next month). (3) SMA feed-through will be checked for the connection (next month). (4) WPM will be calibrated by optical telescope method in April 2008 cool down test. (5) study to use more narrow-band detection to resolve noisy (scattered) detected position. (in future, maybe in S1G)

Proposed S1G module WPM position only for GRP