Inventory for the non-radioactive waste

Slides:



Advertisements
Similar presentations
ISO EMS OVERVIEW FOR CONTRACTORS
Advertisements

Objectives Terminal Objective
Ghislain Roy Safety Unit Accelerators and Beams Department CERN.
Construction (Design & Management) Regulations 2007 Jim Armstrong MCIAT, RMaPS LINDUM CONSTRUCTION FOOD CONSTRUCTION SEMINAR.
Safety Management of the LIU Project A. Funken Anne Funken, LIU PT 21/05/15.
1 CS38010 Professional Issues Health and Safety at Work.
Safety & Safety Documentation 2 3 Safety in three Questions Why ? Providing a safe workplace is a legal and moral obligation on every undertaking, and.
RJC Certification - (COP 9) Bribery and Facilitation Payments Training Module – March 2014.
Mitigating the Social Impact of Oil Operations 18th World Energy Conference Eleodoro Mayorga Alba World Bank October 22, 2001.
Technical Specification April 23rd-24th 2013Handling Engineering Group1  Technical documents during tender  Contract execution  Documents during contract.
Water Scarce Ecosystems A proposal for a UNCCD Policy Framework May
Ministère de l'Écologie, du Développement durable, des Transports et du Logement Implementation of a national legislation.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT – 3972/EN PROVISION OF MAINTENANCE SERVICES ON INDUSTRIAL TRUCKS ON THE CERN SITE Insert.
In France, many authorisations are required to operate an offshore wind farm. The international conventions such as the Convention of Montego Bay do not.
Invitation To Tender Procedure IT – 4005/en Provision of engineering studies and drawings, the supply and installation of piping and its accessories.
Adverse Event Management from the HSE perspective E. Cennini / DGS-SEE EDMS Id Adverse events Workshop Creating a common understanding.
Real Estate Principles Tenth Edition Chapter 25 Real Estate: An Introduction to the Profession Tenth Edition Chapter 24.
EN-GMS Group Meeting S. Prodon – CERN News (scientific matters) 1 st collisions at 13 TeV on 20 May Stable beam as from 3 June = start of.
1 29 June 2011EDMS CERN Greenhouse Gas Inventory – Detector Cooling 1.Background; 2.Status on regulatory requirements; 3.Inventory carried out.
Management of Change ► The health, safety, security, environmental, technical and other impacts of temporary and permanent changes are formally assessed,
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
Occupational Health and Safety. “The Safe Workplace” THE SAFE WORKPLACE Safe Systems of Work Consultation, research, feedback Training and experience.
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
The organization and on-site follow up of the electrical installation work for the LHC The organization and on-site follow up of the electrical installation.
FACSA Performance Management for Florida Authorizers St. Petersburg, Florida June 16, 17 and 18, 2009.
HSE-LSA HSE procedure foresees a Launch Safety Agreement for all new project –this is since several year made systematically for all new projects. The.
Draft Guidelines on Assaults for Schools INTO Special Education Conference Croke Park, 8 th December 2012.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
© 2010 by Cengage Learning Chapter 25 / Chapter 24 ________________ Zoning/ Land-Use Control.
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
Purpose NEW BEAM DUMP TUNNEL Launch Safety Agreement - conventional aspects LIU-SPS external beam dump meeting - C. Colloca DGS/SEE LSA conventional.
CERN Pension Fund Preparing for retirement Emilie Clerc Benefits Service 24 November 2015.
Interior Design Chapter One The Process of Design DESIGN IS THE PROCESS OF PROBLEM SOLVING Letter of Agreement Outlines the responsibilities of the designer.
Being TSO at CERN Safety at CERN2 Being TSO at CERN – Safety at CERN Safety – what is it ? Safety Policy Safety responsibilities Organisational structure.
Safety Management Standards. Introduction Health and Safety Procedures (which identify the risks, hazards and ways of mitigating these) are weak in that.
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
Logo area MQXF Review: Safety Thomas Otto HL-LHC Project Safety Officer With contributions by -Paolo Ferrcin and Ezio Todesco, TE-MSC -Francesca Viggiano,
Environmental Requirements for North West Grid Floodlight Project Compiled by: Silindile Mbhele.
T Mr.Willy Musinguzi, EAC. .Overview of EAC SQMT Infrastructure How EAC standards are Harmonized and Implemented How EAC Quality Infrastructure relates.
Logo area Compliance with CERN Safety Rules – Role of CERN Health, Safety & Environment protection (HSE) Unit C. Arregui, S. Marsh (HSE-SEE) International.
How to succeed in International Tenders Ing. Miloš TKÁČ MTC – Engineering / Consulting / Sales Južná trieda 93 – P.c. Strojár, Košice tel.: 055 / 6808.
Forecasts for waste and radioactive material storage A. Funken, L. Kobzeva LIU-Ions Coordination Meeting, 27/04/2016.
Logo area MQXF Review: Safety Thomas Otto HL-LHC Project Safety Officer International Review of the Inner Triplet Quadrupoles (MQXF) for HL-LHC.
Development, Validation, Implementation and Enhancement for a Voluntary Protection Programs Center of Excellence (VPP CX) Capability for the Department.
Cryogenic safety organisation at CERN
LIU / HL-LHC Cost and Schedule Review
Mirjana Boshnjak Skopje, 20 to 22 September 2017
Being TSO at CERN Safety at CERN Being TSO at CERN Safety at CERN.
East Area Renovation Project Team meeting # 2 – EDMS News
Strategy for conformity of non-standard cryogenic equipment
REPORTING & FOLLOW-UP OF ACCIDENTS & NEAR-MISSES
MODELOS DE GESTIÓN DE CALIDAD
Preparing for retirement
Forecasts for waste and radioactive material storage
Risk Assessment and Accident Prevention
East Area Renovation Project team #7 News
East Area Renovation Project team #6 Launch safety agreement
The EAC Quality Infrastructure and WTO TBT Agreement.
EP Experiments safety validation process Safety Permits
History Dec 2015, FC Discussion about contract splitting
Pre-Execution Process Review Presentation
Consideration of Action Re: Commercial Cannabis Businesses
Communication and Consultation with Interested Parties by the RB
EESC – Brussels – 7 September 2015
Circular Economy -Public Consultation – Results
OSH COMMITTEES IN SPAIN AND EUROPE
CR-GR-HSE-412 Stakeholder and Local Impact Assessment
Work and Service Supervisor
Contingency Planning for Accidental Surface Water Pollution​ GROUP HSE RULE (CR-GR-HSE-705) EXECUTIVE SUMMARY This rule sets specific requirements to be.
Presentation transcript:

Inventory for the non-radioactive waste HSE/SEE-EN Overview of the CERN-wide inventory and legal background Waste issues in the Launch Safety Agreement (LSA) & HSE proposal LIU-PT meeting 30/06/2016 EDMS # 1703146

Overview of the CERN-wide inventory LIU-PT meeting 30/06/2016 EDMS # 1703146

Overview of the CERN-wide inventory LIU-PT meeting 30/06/2016 EDMS # 1703146

Overview of the CERN-wide inventory LIU-PT meeting 30/06/2016 EDMS # 1703146

Overview of the CERN-wide inventory LIU-PT meeting 30/06/2016 EDMS # 1703146

Legal background European Waste Directive French Code de l’Environnement Swiss Environmental law LIU-PT meeting 30/06/2016 EDMS # 1703146

Legal background Specifically for worksites with formal “demande de permis de construire”: French “Schéma d’organisation des déchets de chantier” (SOSED) Swiss “Déclaration de gestion des déchets de chantier” (following SIA 430) LIU-PT meeting 30/06/2016 EDMS # 1703146

Waste issues in the Launch Safety Agreement (LSA) → Overall requirements For waste produced by contractors activities defined within EDMS 1155899 – Working on the CERN Site (no traceability – to be confirmed) “ Il est de la responsabilité du contractant d’évacuer et d’éliminer les déchets ou produits chimiques résiduels qu’il aura introduits ou produits sur le site du CERN ” Other case : CERN waste eliminated otherwise than through CERN centralized waste collection services - SMB+ITP (e.g oil collected by ABB – no traceability – no accounting – to be confirmed) LIU-PT meeting 30/06/2016 EDMS # 1703146

Waste issues in the Launch Safety Agreement (LSA) → Worksite LIU-PT meeting 30/06/2016 EDMS # 1703146

Waste issues in the Launch Safety Agreement (LSA) → Safety File – Project phase LIU-PT meeting 30/06/2016 EDMS # 1703146

Waste issues in the Launch Safety Agreement (LSA) → Safety File – Worksite – if formal building permit required LIU-PT meeting 30/06/2016 EDMS # 1703146

HSE proposal for the non-radioactive waste inventory By mid September – introduction of a template for the non-radioactive waste inventory, considering the waste categories that are already declared through the annual waste inventory – shall be documented in the Safety File of the project; Shall be defined at the project phase, focussing on operation, shall inform about the annual waste production; For worksites that would required a formal construction permit, CH/F documents established in this framework shall be included in the Safety File of the project. LIU-PT meeting 30/06/2016 EDMS # 1703146

Conclusion Good knowledge of the annual amounts of non-radioactive waste collected. However, associated producers not traced/registered; HSE is still on the way to understand how waste traceability is performed within the Organization – identified already room for improvements; Assessing the amounts of waste produced by an activity is part of a environmentally responsible behaviour, enables to identify specific sorting needs, to anticipate elimination/valorisation pathways and at the end, contributes to limit the impact on the environment. The new Direction is committed to act: CERN Bulletin – 29 February 2016 – Fabiola Gianotti – “One of the main objectives of the HSE (Occupational Health and Safety and Environmental Protection) unit in the coming months is to enhance the measures to minimise CERN’s impact on the environment. I believe CERN should become a role model for an environmentally-aware scientific research laboratory.”   LIU-PT meeting 30/06/2016 EDMS # 1703146