TTC Topical Workshop on SRF Cryomodule Clean Room Assembly

Slides:



Advertisements
Similar presentations
Interface of Plug-Compatible Cryomodule Components KEK Norihito Ohuchi 2008/3/41GDE-Sendai Meeting.
Advertisements

Status of 1.3-GHz Cavity Vacuum Furnace at IB-4 SRF Dev. Group Meeting 27 Sept 2010.
E. Kako (KEK) Webex Meeting in May 24th, Status and Disassembly Plan of S1-G Cryomodule.
Progress and Plan for Superconducting RF Cavity RF Group.
LCLS-II Cryomodules Production Plans at Fermilab
CRYO PIPING & INTER-MODULE CONNECTIONS Yun He, Daniel Sabol, Joe Conway External Review of MLC Daniel Sabol, MLC External Review 10/3/2012.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
1.3 GHz SRF Cavity R&D Plan Jiyuan Zhai ILC Group, IHEP 3 rd IHEP-KEK 1.3 GHz SRF Meeting, 7 Dec 2010, Beijing.
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
1 Eiji Kako (KEK) in cooperation with Japanese Industries IPAC-2010 Satellite Workshop, Kyoto, May 23, A Satellite Workshop at IPAC Superconducting.
S1 Global Module Cavity String Assembly Workflow Tug Arkan January 15, 2010.
Mechanical Issues SPL cavities/cryomodules Workshop CERN 30 Sep. 2009
Summary of Main Linac SCRF-part H. Hayano, ILC08 at UIC.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
ERL: G-5/e-Gun Cryogenic & Pressure Safety Committee Review ERL G-5/e-gun Beam Line Vacuum Failure Analysis April 24, 2009.
CERN status - Nb cavity – Manufacturing 1 15/Nevember/2010, Ofelia Capatina EN/MME 1 SPL Cavity Working Group Meeting TaskExternal Company CERN Provide.
SRF Processing at ANL: Progress and Plans ANL: Mike Kelly, Scott Gerbick FNAL: Dan Olis, Allan Rowe Speaker: Mike Kelly November 17, 2008.
Assembly Procedures of the cavities Ancillaries (RF power coupler, Tuning system, RF cables) 19/03/2014Mathieu Therasse BE/RF/SRF1 Special Linac WG meeting:
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
1 K.Jensch, D.Kostin, DESY - Cryomodule components List S1 – DESY parts DESY parts for the S1 Cavity-String.
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
Update on S0 Work in the Americas Region Mark Champion 17 June 2008.
 =1 cavity: parameters Dimensions for cavity fabrication before any chemical polishing and at room Temp. outer ½ cell pick-up side inner ½ cells outer.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
Check the component list with FNAL solid model Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
JLab Update Rongli Geng April 30, th LCC ILC Cavity Group Meeting.
MHI#16 号機の2回目の EP2  Process log  Status of working  Monitor data during EP & Rinsing process  Comparison of EP2 Period : 2011/5/10 ~ 5/16 Process :
LCLS-II Cryomodules Production at Fermilab Tug Arkan, 7/17/2014.
CMS Double Chooz HESS Edelweiss Herschel ALICE Detecting radiations from the Universe. EXPERIENCE WITH HARDWARE PREPARATION FOR XFEL TTC topical workshop.
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
Guillaume Olry, Sébastien Bousson CNRS/IN2P3/ IPN Orsay – Paris-Sud University Experience on Spiral2 cavity cleanliness degradation during clean room assembly.
MHI#19 号機の1回目の EP2  Process log  Condition of EP2 & Rinsing process  Status of working  Monitor data during EP & Rinsing process Period : 2012/2/17~
Hao Guo LINAC Department Institute of Modern Physics.
Cryomodule Assembly Facility Fermilab Cleanroom: Assembly/Disassembly Tools Tug Arkan 1.
Vacuum experiences on XFEL Beam Position Quadrupole Units (BQU) preparation Marco Schalwat TTC Topical Workshop on SRF Cryomodule Clean Room Assembly CEA.
FNAL Cryomodule Assembly and Installation Plans Tug Arkan May 22, 2015.
Vacuum Related Procedures and Tools of IHEP ILC Test Cryomodule Assembly Jiyuan Zhai (IHEP) TTC Topical Workshop on SRF Cryomodule Clean Room Assembly.
1 IPN Orsay / Division Accélérateurs The Spoke cryomodule Vacuum aspects P. DUTHIL on behalf of the IPNO team ESS Lund February 19 th 2013.
JLAB Cryomodule Assembly Facilities Visit Report Tug Arkan, Yuriy Orlov March 26, 2012.
Field emission in SRF Cavities
JLab UHV omponent leaning and nitrogen blow off procedures and development Ari D. Palczewski JLab Ari D Palczewski, TTC topical 13Nov2014 Sacley France.
Survey the cavity degradation mechanism under Dis assembly/assembly procedure for cERL cryomodule at KEK 1 Hiroshi Sakai, Takaaki Furuya, Masato Sato,
Guillaume Olry on behalf the IPN Orsay SPIRAL2 team TTC Meeting – Milan, 28 Feb-3 March 2011.
Field Emission Minimization for LCLS-II
DESY Experiences on Use of Gas overlay during Assemblies
Peng Sha Institute of High Energy Physics, CAS
Input coupler assembly, high power and thermal performance in S1-Global at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
S0 Status report from KEK
Definition of work flow for string DESY Example on critical operation
S1-G Webex meeting Global Design Effort
HWR Cavities for China ADS
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
Recent SCRF Activities in IHEP
WP 3 coordination meeting Saclay May 2008
IMP Cryomodule Assembly and Alignment
IHEP Cryomodule Status
CEPC Input Coupler Discuss 6th IHEP-KEK SCRF Collaboration Meeting
TTC Hot Topic Common Questions
INSTITUTE OF HIGH ENERGY PHYSICS
IHEP ILC Cavity Status Jiyuan Zhai (IHEP)
SNS PPU Cryomodule Instrumentation
CEPC-650MHz Cavity Cryomodule
CRYOMODULE FINAL ASSEMBLY
SNS PPU Cryomodule Instrumentation
SNS PPU Cryomodule Design Overview
CRYOMODULE FINAL ASSEMBLY
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
HWR and Test Cryomodule for China ADS
Presentation transcript:

TTC Topical Workshop on SRF Cryomodule Clean Room Assembly Clean Room Component Preparation and QC of IHEP ILC Test Cryomodule Assembly Jiyuan Zhai (IHEP)  TTC Topical Workshop on SRF Cryomodule Clean Room Assembly CEA Saclay, 12-14 November 2014

Components Cleaning Wipe with acetone (ultrasonic with ethanol) Ultrasonic with 2% Liquinox at 50 C for 20 min Rinse with UPW at RT Ultrasonic with UPW at RT for 10 min Rinse with UPW (or ethanol) at RT Dry in Class 10 Blow-off to Class 10 (except long bellows for vacuum pumping and purging)

Coupler Cold Part Assembly

All-Metal Gate Valve and Angle Valve Wipe, blow to clean, half-open, blow to clean, keep open during assembly

Gate Valve Assembly Wrong assembly of the gate valve seat side. This side should face the cavity Leak rate will be higher. Cleanness OK. Allowable differential pressure 2 bar in either direction.

HOM Feed through and Field Pickup Thermal shock and leak check BCP the Nb tip (1:1:1, 1 min), rinse Ultrasonic with ethanol 20 min Blow in liquid N2 (10 min) vacuum bake (110 C, 6 hrs)

Gaskets WEPEK AlMg gasket NW78, NW8: beam pipe, HOM&FP wipe with acetone (black stain) and blow U-tight Sn-plated helico-flex gasket 15037: FPC wipe with ethanol and blow CF35,16 OFC Any scratch, discard Al gaskets provided by a Chinese vendor used for ADS spoke cavity. Leak-tight in RT, leak in LHe. Add torque, then leak tight (loose after cooling down/thermal shock).

Fasteners Stud 316L SS Rolled, Electro Polished; Hex Nut - Silicon Bronze (Kuprodur) Ultrasonic with warm Liquinox, dry, blow clean to ~100 (> 0.5 um) During (warm) ultrasonic cleaning, Al complements never touch to each other and other material; avoid Al. No Micro-90 for Cu, Al, Mg and Zn.

Particle Free Flange Assembly

Cavity and beam tube Assembly

3 m long beamline (large grain low-loss 1.3 GHz 9-cell cavity)

Special thanks to JLAB, FNAL and KEK colleagues. Thank you!