Baseline CPT Test Baseline CPT Testing June 2017 Mission Simulation 2

Slides:



Advertisements
Similar presentations
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
Advertisements

Mission Operations –Launch February 15, 2000 at 22:02:15 UTC = 14:02:15 PST –41 Days IOC and antenna deployment period –2 year science mission operations.
Solar Probe Plus Fluxgate Magnetometer QSR – Oct SPF MAG Quarterly Report – Oct 2014 The MAG EM1 (EQM) (board and frame at right) was successfully.
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
June 16, 2015SPP/FIELDS SOC CDR: Integration & Test SPP/FIELDS Integration and Test SOC Critical Design Review Keith Goetz University of Minnesota
Austin Texas. 7 Day Forecast Sunday – 62 /51 Sunday – 62 /51 Monday – 65 / 45 Monday – 65 / 45 Tuesday – 56 / 36 Tuesday – 56 / 36 Wednesday – 56 / 43.
School Year Calendar You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own.
Sunday Monday Tuesday Wednesday Thursday Friday Saturday
MAIN PITCH AM PM 6 – 7PM 7 – 8.30PM 8.30 – 10PM
The Monster Song.
Calendar 2017.
Days of the week NEXT.
The Outsiders Reading and Exam Calendar
The Outsiders Reading and Exam Calendar
Days of the Week Les docs d’Estelle –
Before and After.
DAYS OF THE WEEK.
Time management School of Rock.
Calendar of 2012 ESL Lesson on Months.
A Class Calendar in PowerPoint
JANUARY 2018 SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
Sunday Monday Tuesday Wednesday Sunday Monday Tuesday Wednesday
Calendar 2012 Example text here.
1Y Resume Review Process – Fall 2014 – Key Dates
School Year Calendar You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own presentation.
JANUARY 2008 Monday Tuesday Wednesday Thursday Friday Saturday Sunday
Number of visitors to the library.
Overview of Alignment Engineering Group Downtime Activities
Schedules My Schedule Monday: 9:00-2:00 Work 3:00-6:00 Clean
open eir SB-WLR Fault Repair Performance in clock hours for QTR
MY FUNDAY.
FIZZ FREE FEBRUARY 2019 Your name: Your school:
SEPTEMBER ½ Day Start Unit 1
American Every Day Music by Teresa Jennings Music K-8, Vol.19, Num. 3 © 2009 Plank Road Publishing, Inc. All Rights Reserved- used by permission PowerPoint.
Several Ad-Supported TV Shows & Sports “Own” Specific
SEPTEMBER 2014 Unit 1 Unit 1 Continued Unit 1 Continued
Fawkner S.C Coaching curriculum implementation : 2016
School Year Calendar You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own.
Days of the Week Monday Tuesday Wednesday Friday Thursday Saturday
Unit 1: Quick Quizzes After 5,13
Reading Calendar: Hatchet by Gary Paulson
School Year Calendar You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own presentation.
What’s the date today?.
SEPTEMBER 2014 Unit 1 Unit 1 Unit 1 Unit 1 Quick Quiz 9,16, 21 Unit 1
Overall Total % of TV-topics in Top 10 During Primetime
SEPTEMBER ½ Day Unit PLC
Created by: Ramona Lewis-Dailey
JANUARY 2018 SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
Extended Christmas Hours Thursday December 8th 9am -6:30pm Friday December 9th 9am -6:30pm Saturday December 10th 9am-6pm Thursday December.
January 2015 Sunday Monday Tuesday Wednesday Thursday Friday Saturday
WHEN IS YOUR BIRTHDAY? IT’S ON THE 5TH (FIFTH) OF MAY.
| January Sunday Monday Tuesday Wednesday Thursday Friday
March 2015 Chapter 8 Flight Manuals
Swimming Pool Schedule
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
Time 1.
Contact
#teacher5aday Stress Awareness Month
Created by: Ramona Lewis-Dailey
NOVEMBER READING LOG Student: When you have read, record your minutes and have your parent initial the proper box (each day). At the end of the month,
2011年 5月 2011年 6月 2011年 7月 2011年 8月 Sunday Monday Tuesday Wednesday
WHEN IS YOUR BIRTHDAY? IT’S ON THE 5TH (FIFTH) OF MAY.
June Sunday Monday Tuesday Wednesday Thursday Friday Saturday
March 2008 Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1

BOOKINGS – Monday, 2nd July BAYWAVE
JANUARY M T W T F S S Monday 1st semester Unit 2.
Mr. Butler 6th Grade Earth Science
January Monday Tuesday Wednesday Thursday Friday Saturday Sunday 30 31
Open Bowling Times 9:30 pm – 12 Midnight Moonrock
Presentation transcript:

Baseline CPT Test Baseline CPT Testing June 2017 Mission Simulation 2 Horizontal Sunday Monday Tuesday Wednesday Thursday Friday Saturday Harness Blankets Louvers Fault manage Mission Simulation 2 1 2 3 Mission Sim 2 4 5 6 7 8 9 Autonomy FM Testing 10 Fault Management Fault Management EPS Autonomy S/C Clean then cable up and power up G&C Avionics 11 Pump Electronics 12 13 14 15 V3 subspacer install 16 17 Cooling system Harn, inc SA Boom#1 Integrate SA Boom2 FSW 4.1 Integrate S/A Boom 2 Accumulator Integration Accumulator Integration Fault Management Fault Management Move S/A #1 boom to 45 degrees Fault Management S/A Boom/sub spacer/imu Align. Autonomy RF Troubleshooting Fault Management/G&C CPT Dry Run Autonomy G&C 18 19 HGA Integration 20 21 Harness PDU, REM HGA Integration EPS,RPM Baseline CPT Test 22 RF 23 G&C HW, SACS, Prop 24 Autonomy G&C Fault Management V1,V3 Integration and deploy V1,V3 Stow and Stimulate Tent. HGA Alignment V1,V3 Installation Autonomy WISPR, FIELDS, ISOIS Contingency 25 26 27 28 29 30 SWEAP, Multi-Instr. CPT SIM #1,2 CPT SIM #3,4 Contingency Baseline CPT Testing

EMI / EMC part 1 July 2017 MAG SWING TEST thru 7/5 EMI/EMC part 2 Horizontal Sunday Monday Tuesday Wednesday Thursday Friday Saturday Fault Manage MAG SWING TEST 1 2 3 4 5 Mag Boom Install Deploy and Alignment 6 7 8 MAG SWING TEST thru 7/5 Install Mags and V5 onto Mag Boom G&C Testing Fault Management Fault Management EMI / EMC part 1 9 Mag Boom continued 10 11 Blankets 12 Blankets 13 Blankets 14 15 Autonomy Fault Management Tilt over and bond LGA3 bracket 16 17 Blankets 18 19 Move to Low Dolly and config CS Then roll back in. 20 EMI/EMC part 2 Cooling System 21 22 Blankets Roll out for IMU phasing and WISPR 1G sag Meas. EMI/EMC part 1 23 24 25 26 27 28 29 S/C Clean Autonomy FM Testing Separation Sequence Test HI/LO Voltage Test Autonomy Autonomy Fault Management Fault Management Fault Management Timekeeping G&C G&C 30 31 Fault Management Autonomy Timekeeping

RESERVE RESERVE RESERVE August 2017 Horizontal Sunday Monday Tuesday Wednesday Thursday Friday Saturday SPP Summer Celebration Details coming Soon 1 2 Autonomy testing FM Testing 3 Autonomy FM Testing 4 5 Fault Management Fault Management Autonomy Autonomy G&C 6 7 RESERVE 8 9 RESERVE 10 11 12 G&C ECU Phasing for score HGA Fault Management Timekeeping 13 RESERVE 14 15 16 17 18 19 Move to Bldg 30/ Pack and move GSE Move to Bldg 30/ Pack and move GSE 20 21 22 23 24 25 26 Install Flight TPS GSE Checkout Install Flight TPS GSE Checkout Alignments GSE Checkout Alignments GSE checkout Remove TPS GSE Checkout 27 Remove TPS and reconfigure Cable up and run Aliveness 28 Move to MIS for drain and dry of cooling system 29 Blankets 30 Blankets 31 Prop leak and functional Water Load of Prop Tank