Activity Leader: Ankit Bhardwaj Team Members: Nitin Arora

Slides:



Advertisements
Similar presentations
Temporary Abutment.
Advertisements

Mainttobe Breakdown Maintenance Process Production Operator/supervisor Investigate fault Breakdown event Quick Fix Yes No Fix it Maintenance Team Repair.
Rework Procedure for Wash Motor Pulley Change Model : Rosa & Rosa Plus Part Details & Tools required Sr NoPart DescriptionQtyTool used to replace old artworks.
Rev. A Control Number XXXXXXXXXXX Effective Date 10/2/2008 Field Work Instructions for Placard replacement Functional Trainer Page 1/4 Revised Date 10/2/2008.
May 2013 Mass Report Generation Managing High Volume Reporting.
Getting Started with Layout Compiled by Ryan Johnson May 1, 2002  Open Orcad Capture under Engineering Software  Under FILE, choose NEW, PROJECT  The.
1 CSE 417: Algorithms and Computational Complexity Winter 2001 Lecture 15 Instructor: Paul Beame.
Stereo microscope – 5.4% air manual mm spacing manual.
Case Study _ Smart Art Team Type: Cross FunctionalTeam Size: 6 members Project Meetings: 12 Primary Metric: Specific customer complaint on average every.
2006 Executive Council Input Director of Member Benefits Insurance Submitted by Russ Mitchell July 30-31, 2006 Marriott Hotel Albuquerque, New Mexico,
 …can the Business Centers redistribute?  Payroll charges that are within the current Fiscal Year.  Including:  Payroll charges that have been previously.
Step 4 Presenter: Updated 6/21/2013. Training Overview Introduction Walk Through Step 4 Scheduled FET Trainings & Completion Dates for FET Step(s) Question(s)
1Convergence_Internal © 2001, Cisco Systems, Inc. IP Telephony ROI Case Studies.
To insert your company logo on this slide From the Insert Menu Select “Picture” Locate your logo file Click OK To resize the logo Click anywhere inside.
Standard Work Standard Work Combination Tables
Team Work. Why we need team work Steps in Team Work 10 steps.
(Project) (Team Leader) (Other Contributing Members)
GROUND ZERO. The condition of the old factory was bad and worse, chaos and unorganization a daily agenda. Old factory.
BY Sajan Moharana Ashwani Rao. Problems……………… Checks is that the repeating size is not constant but variable. If the repeat is not constant, we cannot.
HeliumSoft Pvt. Lmt. 1. Click on Servicing. Click on Office Supplied Data.
Illegal Immigration. Becoming Legal O Eligibility O If you are at least 18 years old and have been a Permanent Resident for the past 5 years without leaving.
EXERCISE 1.4 MICROMETER SCREW GAUGE. D mm C mm B mm A mm    Q1. The diagram shows a micrometer screw gauge. Which reading is.
LO: To Learn an example of a TNC in the TERTIARY SECTOR to show how it operates in different parts of the world. HSBC – Outsourcing winners and losers.
Potentially Lethal Church Planting Short-cuts. #1 Lack of Incubation Period.
网上报账系统包括以下业务: 日常报销 差旅费报销 借款业务 1. 填写报销内容 2. 选择支付方式 (或冲销借款) 3. 提交预约单 4. 打印预约单并同分类粘 贴好的发票一起送至财务 处 预约报销步骤: 网上报账系统 薪酬发放管理系统 财务查询系统 1.
Group Co-ordinations: 1.Mrs. Manvi Sharma Kampasi -- Co-ordinator 2.Mr. Dushyant Kohli 3.Mr. Opinder Krishan 4.Mr. Nitin Sharma 5.Mr. Rohit Kumar 6. Mr.
The reading is 7.38 mm. The reading is 7.72 mm.
Presented by Dhananjay Metal Craft Pvt Ltd-1 Shendra Aurangabad.
4 Starting Tips to Keep Your Car in Top Condition
LDR 531 Week 3 DQ 1 To purchase this material click on below link 531/LDR-531-Week-3-DQ-1 LDR 531 Week 3 DQ 1 How would.
FABRICATION AND TESTING OF ARRAY DRILLING MACHINE
Figure 2. Case 1 clinical photographs
COLLABCAD CONSORTIUM MEETING
Progress Project Tracking for EGEE Kasia Pokorska, CERN IT-AIS-PM
Shashank Pawnarkar, TCS
Annex 4 - Moving Frame and Whiffletree assembly
Home page.
How You Earn 2 Ways To Earn Money With Our Company Product Sales
Standard Operating Procedure
Software project mgt. session # 3– lab manual.
MECHANICAL DRAWING WORKING DRAWINGS
ZIMBRA WEB ACCESS USER MANUAL
Today’s students are taught modern theory and the alumni may have dated theory but up to date experience What could be done to bridge this gap? To create.
Rear Cover Assembly.
Turing Machine
Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses
Online Gifts Buy for wishes happy mother's day to yours choice and with happy gifts find here:
Replacement of outside mirror
Proposed Modification to the Draft ad Selection Procedure
Team Members: Sagar Sheth Team Leader Leonardo Silva Industrial Eng.
W201 3R hardboard Replacement Procedure.
Describing job requirements and experience
كار همراه با آسودگي و امنيت
Documentation Standards
1ClickSMT – The First Choice for Automatic Screwing Machine
SCHOOL, DEPARTMENT, PROGRAM, OR OTHER TEXT IF NEEDED
The Penny What would you rather have for your allowance in a month? 100 dollars, or 1 penny, that every day of the month became twice what it was the day.
Gas cell apertures with dimensions (original)
Computer Desk Shaquan West.
School – wide Positive Behavior Interventions and Supports
Emergency Supply Organizer
Simple Step for FFC Fitment NFA to YFA
House Keeping (HKS).
Modified at -
DISTANCE COVERAGE WATER IRRIGATION
Team-building Workshop: Heads or Tails
For More Details:

Discard “Old” Gasket Remove original gasket
Geographical Context To familiarise.
Presentation transcript:

Activity Leader: Ankit Bhardwaj Team Members: Nitin Arora Best Practice: 2 Manpower saving in Lava Model ARC12+ by screw Modification done Activity Leader: Ankit Bhardwaj Team Members: Nitin Arora Mentor: Ankur Sharma Before After Earlier in Model ARC12+,there was a issue in the screws of A-shell & B-shell fitment. Screw head design was not OK as per the screw bits and Auto screwing machine was not able to do the tightening of screws properly due to mismatch of screw bit and screw head. 3 persons were doing screw tightening manually Screw head design was modified at ODM and now screw bits are matching with screw head. After this modification, we have done 2 manpower saving. Benefits: Screw modification done at ODM end in which screw head design was modified 2 Manpower Saving Per shift ie INR 56000/-

A A B B Before After Old Dimensions Modified Dimensions A Cross recess is 0.75mm deep B Cross recess is 0.27mm wide. Modified Dimensions A Cross recess is 0.8mm deep B Cross recess is 0.3mm wide. A A B B

Cost Saving Cost Saving Details Cost of 1 manpower/ month 15000 No. of shifts/day 3 No. of days/month 25 Cost of 1 manpower/ shift 600 EOL Qty 140000 Production/day 9000 No. of Days to complete EOL qty. 15.56 No. of Months to complete EOL qty. 1.87 No. of manpower saved 2 Cost saving/manpower 28000 Total Cost saving 56000