Status of VPT Delivery and Testing

Slides:



Advertisements
Similar presentations
Vacuum Phototriodes for the CMS Electromagnetic Calorimeter Endcap
Advertisements

CMS ECAL Annual Review - CERN Sept 2001 R M Brown - RAL 1 Test results from 500 preproduction VPTs R M Brown RAL - UK CERN 19 September 2001.
January 6. January 7 January 8 January 9 January 10.
A giant flare from the magnetar SGR a tsunami of gamma-rays Søren Brandt Danish National Space Center.
Introduction to Chi-Square Procedures March 11, 2010.
The Evolution of the Web and Implications for an Incremental Crawler Junghoo Cho Stanford University.
Lesson1-6. The Four-Step Problem Solving Plan 1. Explore Read the problem carefully.
Whole School Attendance Whole School Attendance 94.64% Overall School Absence 5.36%
B W Kennedy, CCLRC Rutherford Appleton Laboratory VPTs for the CMS experiment B W Kennedy CCLRC Rutherford Appleton Laboratory St Petersburg, 26 April.
CMS Week, CERN, 2002 R M Brown - RAL 1 Performance Characteristics of Production VPTs R M Brown, B W Kennedy, P R Hobson (with crucial input from D J A.
John Coughlan CMS Week Mar FED Update FED Production Status Transition Card.
CSSM Meeting Summary CCSDS CSSM Technical Meetings San Antonio, Texas, USA 28 – 31 October 2013.
Peter Hobson - Brunel University, UK3 July 2003 VPT 4 Tesla testing  An automated characterisation facility based at Brunel has been commissioned to handle.
Guido_Tonelli / CMS_TSC / 5 February Time stability of ST sensors The problem The sensors re-measuring campaign Failure analysis Conclusions.
Campaign Plan Assignment Eight: Campaign Communication Plan GOVT Spring 2015.
1 Project Update and Summary of Project Priority List (PPL) Activity July 16, 2015.
B W Kennedy, CCLRC Rutherford Appleton Laboratory Vacuum Phototriodes for the CMS Electromagnetic Calorimeter Endcaps K.W.Bell, R.M.Brown, D.J.A.Cockerill,
Non Leap YearLeap Year DateDay NumberMod 7Day NumberMod 7 13-Jan Feb Mar Apr May Jun Jul
WEEK 1 You have 10 seconds to name…
Slide 1 of 5 COS Monthly Status Review David Soderblom STScI
1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.
SunSatFriThursWedTuesMon January
Peter Hobson - Brunel University, UK3 July 2003 VPT faceplate testing  Samples of faceplate glass are irradiated to approximately 20 kGy gamma ray dose.
That’s Nice! But it is not Maintenance Excellence. Life Cycle Engineering The Nation’s Premier Provider of Maintenance Solutions.
EE 460 Advanced Control and Sys Integration Feedback Summary Mon, Oct 26 EE 460 Advanced Control and System Integration Slide 1 of 4.
EE EDR Workshop CERN March 2002 R M Brown - RAL 1 The VPT HV System lOverview of the architecture lThe HV filter card lRadiation tolerance lPower supply.
AUG SEPChange % Cong. Travel18.0%14.5%3.5% Travel Time Index Buffer Index PORTLAND CONGESTION REPORT September 2005 Month vs.
HEP2001, Budapest, July 2001 R M Brown - RAL 1 The Vacuum Phototriodes for the CMS Electromagnetic Calorimeter P R Hobson, D C Imrie, O Sharif Brunel University,
B W Kennedy, RAL PPD VPT testing status Visual inspection of VPTs The RAL 1.8T test rig VPT testing at RAL High-field testing at Brunel Bruce Kennedy,
LDR 531 Week 3 Summary R-531/LDR-531-Week-3-Summary For more details
Status of the RICH project
【New Draft】 France -Japan International Co-funding Joint call Schedule (revised version) APR. 11, 2017 Bpifrance / NEDO final meeting (week of 18/9) Announcement.
CLAS12 Forward Tracking: Status and Challenges
Performance Management Strategic Initiative January 2017 Update
SPF MAG Quarterly Report – Feb 2015
BSS Prep work at CERN and Acceptance of Parts
20th CAA/DAA Cross Calibration Meeting
News about the WA104 Programme
RICH Status from last RICH meeting
Software Session Introduction
Oversight Board Meeting October 3, 2017 Rob Michnoff
HEP2001, Budapest, July R M Brown - RAL
Spectrometer Solenoid Fabrication Status and Schedule
February 12 – 19, 2018.
Workshop on Census Data Processing Bangkok 15th – 19th September 2008
Social Media Boot Camp Twitter: Wrap-up Webinar.
GC-MS RESULTS SEP 18TH – MYTHREYI
Program Status (Chart 1)
CMS Pixel Data Quality Monitoring
FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
Information Management & Financial Analysis for HR Managers
* *.
GANTT CHART can be used for scheduling generic resources as well as project management. They can also be used for scheduling production processes and.
AIDA Asic Heatsinks Prototype received, and approved.
PROGRESS on EE VPTs, Dees D Cockerill
Maria Pia Younger CDS 301 – Prof. Weigel
Details supporting the increase
XRN Feb 19 Minor Release - Status Update
LCLS-II Cryoplant Controls Workshop.
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
Fractions Year 6+
Full Day Kindergarten Timeline
Minor Release Drop 3 Timeline
XRN 4954 – MiR Drop 5 - Status Update
Status of Hamamatsu Silicon Sensors
XRN 4927 – MiR Drop 4 - Status Update
UNITS OF TIME QUESTIONS.
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
KPI and KVI Review Approach & Plan
Presentation transcript:

Status of VPT Delivery and Testing R M Brown, P R Hobson, B W Kennedy CMS Week March2005 B W Kennedy, R M Brown - RAL 1

VPT Delivery and Test –1 Mar 05 CMS Week March2005 B W Kennedy, R M Brown - RAL 2

Examples of Typical and Noisy VPTs  ~ 4 counts VPT 790 Initial spike CMS Week March2005 B W Kennedy, R M Brown - RAL 3

Noisy VPTs vs Barcode(Dec03) CMS Week March2005 B W Kennedy, R M Brown - RAL 4

Noisy VPTs vs Production No. (6.5+/-0.8)% (3.2+/-0.5)% (6.9+/-0.8)% CMS Week March2005 B W Kennedy, R M Brown - RAL 5

Noisy VPTs vs Prod_No(Nov04) CMS Week March2005 B W Kennedy, R M Brown - RAL 6

Noisy VPTs vs Prod_No(Mar05) CMS Week March2005 B W Kennedy, R M Brown - RAL 7

Off-axis electrodes vs Production No (Mar05) CMS Week March2005 B W Kennedy, R M Brown - RAL 8

Summary VPT Delivery is proceeding according to a revised schedule (400/month from Oct 04 - completion February 06). Full testing at 1.8T and batch testing (10%) at 4T are keeping pace with delivery. RIE claim to have identified a correlation between anomalous behaviour and process control measurements. Fraction of anomalous tubes has dropped significantly in recent deliveries (~6.0 ± 0.3%  ~3.0 ± 0.5%). Fraction of tubes with visibly mis-aligned electrodes has also improved significantly for recent deliveries. CMS Week March2005 B W Kennedy, R M Brown - RAL 9