Nikolaos TRIKOUPIS on behalf of TE-CRG-CI CRG-TM for LS2 preparation Preliminary activities of the CI section 25/09/2017 https://indico.cern.ch/event/658322/

Slides:



Advertisements
Similar presentations
Daikin Altherma™ Troubling Shooting
Advertisements

Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Oxygen Concentrators.
A. Perin, CERN, TE-CRG, 26 May Review of the cryogenic by-pass for the LHC DS collimators 26 May 2011 Modifications to the DFBs, DSLC and cryogenic.
1. Commissioning of cryogenic crates using Mobile Test Bench 1. The Mobile Test Bench 2. Cryogenics crates and equipment – types of transducers and actuators.
QRL Leak Tests the story so far………. Paul Cruikshank on behalf of TE-VSC colleagues & AL4030 Consortium (S133) 1 Paul Cruikshank TE/VSC - QRL Leak Tests.
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
ECAL status Outline: Signal cable connectors quality check results: –ADC side –PM side ECAL PM/C-W channels commissioning status Access activities Further.
LHC Beam Screen Heaters: System overview, consolidation needs and project planning 4 February TE-CRG/JCC (Beam Screen Heater Review) 1.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
Upgrades and Activities of 13kA EE systems during LS1 Bozhidar Panev TE-MPE-EE
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
The LST High Voltage System LST Readiness Review May 5, 2004 Klaus Honscheid Ohio State University.
Pixel Heaters Refurbishment A.Bitadze.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
June 1 rst, Consolidation for E-cloud and High Voltage cards N.Vauthier TE-CRG LS1 projects review:
TE/MPE-TM GRZEGORZ SEWERYN THE UPGRADE OF TT SENSORS C-50 TO THE REDEL CONNECTOR 1.
TE/MPE/EE Short ‘Halfway’ Update ELQA – LS1 Activities MPE/The Electrical Engineering section Knud, on behalf of TE/MPE/EE – 20 September LSC Reminder:
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
LHCb-VELO Microchannel fracture safety system and evaporator concept 26 June 2015 Bart Verlaat 1.
MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE Upgrade, IST and Powering tests of the Upgrade, IST and Powering tests of the 600A Energy Extraction Systems.
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
Fabio Formenti - Feb. 25th, LHC enhanced Quench Protection System project Review committee meeting February 24 th –26 th 2009.
Electronic Report Pigi. HV-LV-ADC status Sometimes “repaired boards” are not working properly and so I would like to propose you to: – Test and qualify.
Nikolaos TRIKOUPIS, TE-CRG-CI LS1 projects review: feedback on projects and lessons learnt 01/JUN/2015, Indico
TE/MPE activities currently planed for YETS Reiner Denz, Knud Dalherup-Petersen, Markus Zerlauth & Bruno Puccio YETS coordination meeting.
NQPS commissioning …a long way to go. Topics nQPS component overview Enhancements in Firmware Commissioning diagram Detailed task list Summary.
1 ESS Cryogenic regulation loops proposal  Thermal shield  Power Couplers double-wall  CM cool down  Stand by and nominal operation  CM warm up Bertrand.
CHAMONIX XV QRL installation and first experiences of operation G. Riddone on behalf of the QRL team AT/ACR-cd Acknowledgements to AT/ACR-op and AT/ACR-in.
D. Delikaris, TE-CRG, LSC 25th Meeting Page 2 October 18 th, 2013 LS1 Committee (LSC)- 25 th Meeting D. Delikaris, TE-CRG Cryogenics activities.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
TE-CRG Activities D. Delikaris, TE-CRG.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
Main MPE Activities during YETS/EYETS/LS2 and the Provision of Resources Andrzej Siemko Andrzej Siemko TE-MPE1.
Mikhail Ovsienko TE-MPE-EE
A technical proposal for the consolidation of the LHCA cryogenic elec/control system for the HL-LHC era. 07/10/2017 Simon MARTIN Marco PEZZETTI Simon MARTIN.
TE-CRG Activities A. Perin, on behalf on the Cryogenics Group.
YETS & LS2 Works EN-EL / Power distribution
Considerations from machine protection and the ELQA teams
Beam Interlock System SPS CIBU Connection Review
YETS & LS2 Works EN-El on LHC / Power distribution
TE-MSC-SCD EYETS th September, 2017.
Cryo equipment strategy in the R2E context
TE-MSC activities in SPS during LS2
PS-CT: ERD-2 switch tank harmonization
ELQA Electrical Quality Assurance
Dielectric Oil Installations
CRG-TM: LS1 projects review
TE-MPE LS1 review Vision from EN-EL(CF)
Update of cryogenic activities
12 October 2009 RRB Plenary R.-D. Heuer
Preparation of the activities for the LHC Long Shutdown 2
Coordination of Hardware Commissioning
Consequences of warming-up a sector above 80 K
Beam Loss Monitors and Ion Chambers for protecting Hall Equipment Tommy Michaelides (SSG) Stay Treat 2016.
MPE main activities planned for LS2
Activities of the ME section during LS2 ( )
YETS & LS2 Works EN-EL / Power distribution
TE-MSC activities in SPS during YETS
POPS Strategy for Restarting & Repairing
K. Foraz on behalf of OSS members
Subsea 100 Global Services Products Presentation
Safety, reliability and maintainability
Hardware Commissioning
SNS PPU Cryomodule Instrumentation
Other arguments to train two sectors to 7 TeV
Presentation transcript:

Nikolaos TRIKOUPIS on behalf of TE-CRG-CI CRG-TM for LS2 preparation Preliminary activities of the CI section 25/09/2017 https://indico.cern.ch/event/658322/ 22 Sep 2015 TE/CRG-CI

Contents List of activities requiring coordination with other groups. List of activities requiring coordination within the CRG. List of activities to be handled by CI with limited external coordination.

Activities requiring external support/coordination HV channels: Upgrade of cables and connectors There are cabling and connectors which are non-conforming to the HV requirements but pass the ELQA tests. CI proposal to upgrade the long cables (signal cables) and DFB Sub-D connectors of the 600A B/Y which do not satisfy the requirements. TE/MPE cannot perform such an upgrade on the D-sub connectors for LS2; (they internally validate close to 1.5 - 2 kV). TE/MPE could consider upgrading only the cabling for LS2 and updating the connectors in the future (is it beneficial?) Strategy to be discussed and be finalized between TE-CRG, TE-MPE, EN-EL for LS2 or later…

Activities requiring external support/coordination Tasks that require opening the interconnects: Repair of 11 faulty BS inlet thermometers (TT843/TT847), no redundant. Repair of 3 faulty BS outlet thermometers (TT843/TT847), currently operating on redundant. Repair of heater LQATH_20L2_EH847 with fault to ground. Study: Widespread differences on thermocouple protections on BS heaters Suspected bad heater/heatsink contacts. Apply thermal grease? Possible repair on some very sensitive heaters ~10 units or list from OA. List of BS TT channels LBRSB_05R4_TT847 <= might be difficult LQOAG_22L2_TT847 LBALB_18R8_TT843 LQOBA_26L4_TT847 LBALB_27L4_TT843 LBARB_16R1_TT843 LBARB_17L8_TT843 LBALB_27L5_TT843 LBARB_30R5_TT843 LBARB_27L6_TT843 LBALB_29L3_TT843 QRLAB_19L2_TT943 QRLAA_29R1_TT947 QRLAB_15L1_TT947 Test performed at the LBALB_32L4_EH843 (was not possible to provide more than 36W: When at cold, directly maximum power 150W-200W was given and the heater could maintain this power. When ramping down observation of region with increasing ThC reading.

Activities to be handled by CRG Tasks requiring coordination within the CRG group: Repair of 7 non-functional pressure sensors of QRL Line D PT991. Checking leak tightness of PT sensor manifolds. Opportunistic repair of >10 faulty TTs in QRL and DFBs. Repair of T.B.D. by OA list of 10 out of 42 broken QRL heaters 500W. Repair of 3 faulty LTs (LQASD_27R8_LT811, DFBAL_05R6_LT830, DFBAN_07R7_LT861). List of damaged QRL & DFB TT channels DFBMM_04R6_TT830 DFBAD_07R2_TT846 QRLAA_13L5_TT971 QRLBA_09R3_TT971 QRLBA_09L1_TT971 LQTFB_06R7_TT830A LQYCH_04R1_TT830A LBRCA_04L5_TT831 QRLAA_13L2_TT961 QRLDG_07L3_TT961 List of damaged 500W RM EH channels QRLID_03L1_EH990 QRLGC_03R1_EH971A QRLGC_03R1_EH971B QRLIB_03R1_EH970B QRLGE_03R2_EH971B QRLGD_03L5_EH971B QRLIA_03R5_EH970B QRLCD_05L6_EH971A QRLCC_07L7_EH971B QRLIA_06R7_EH990

Activities to be handled internally by CI Accuracy measurements on all HV TT channel for detection of partial faulty cards (due to past HV tests). Accuracy measurements on selected PT sensors. Possible replacement of aging components on electronic cards. Preventive maintenance: Identification of faulty cabling/cold solder joints and repair. Lifetime tests on On/Off mechanical switches Lifetime tests on power card capacitors (repeat of similar tests performed in 2015). Install missing backpanel protection cover of crates (multiple cases in RR13, RR53, UA47, USC55, RR77, UA83, …). Automatic crate recovery after a power-on? example after AUG tests. This requires many changes and currently small benefit; Better to not perform only if OA requires for selected families/locations? Details on Install missing backpanel protection covers: RR77.QYC01 RR13.QYC02 RR53.QYC01 USC55.QYC01 Short-circuit while pulling a spare EH cable damaged all 5 TTs on top level.