2015 Project Preview NUCA of Colorado

Slides:



Advertisements
Similar presentations
SPRINGETTSBURY TOWNSHIP.
Advertisements

Innovative Strategies for Removing Emerging Contaminants for Indirect Potable Water Reuse - Oak Bluffs, MA Case Study Marc Drainville, PE BCEE LEED AP.
Water & Wastewater Construction Back Forward Wastewater Treatment Plant and Pump Station Improvements, Haverhill, MA.
Capital Improvement Program City of Snoqualmie Public Works Department.
Capital Improvement Program (CIP) Overview Dean Fisher, P.E., PMP, CCM July 25, 2013.
Capital Improvement Program (CIP) Overview Jim Herberg, P.E., BCEE June 14, 2012.
Presented by: Ronald O. Nichols LADWP General Manager
Wakulla County Sewer Project Eutaw Utilities Presentation April 7, 2011.
Innovative Tools for Energy Savings T. Allbaugh, P.E., S. J. Kang, Ph.D., P.E., K. Williams, P.E., W. Kramer, P.E., G. Jones, P.E., K. P. Olmstead, Ph.D.,
Water Services Department Arizona Mexico Commission Bi-National Meeting March 9-11, 2008 David Cavazos Deputy City Manager Water Services Department Arizona.
FISCAL YEAR BUDGET MONROE METROPOLITAN POLLUTION CONTROL SYSTEM BUDGET 1 Presented by Barry S. LaRoy, P.E. Director of Water & Wastewater Utilities.
FY Budget Presentation to Board of Finance March 31, 2014 SWPCA William P. Brink, Executive Director Rhudean Bull, Administration Manager.
Regional Partnerships for a Sustainable Water Future Britta Strother Water Resource Specialist July 22, 2010.
Capital Improvement Program (CIP) Overview Nick Kanetis, P.E. June 14, 2013.
The Future of Infrastructure Investments Carter H. Strickland, Jr. Commissioner, New York City Department of Environmental Protection March 7, 2013.
Projects Preview 2015 NUCA March 19, 2015 Colorado Springs Utilities.
Presentation Overview
GALENA WASTEWATER TREATMENT UPGRADES Informational Presentation for the Sassafras River Association Presented by Ryan J. Rangel, PE April 23, 2015.
City of Dayton Water Supply and Treatment Division.
Bruce Moore, Manager Colorado River Division Southern Nevada Water Authority July 28, 2010.
Analysis Of Spring 09 Enrollment. Percent Enrolled / All Students Spring CSU Channel Islands.
Surface Reservoir Storage Operations 2011 Public Utilities Department Public Utilities Department ( (Water Operations Branch)
WATER AND WASTEWATER Ltd. Rijeka REPUBLIC OF CROATIA Andrej Marochini, B.Sc.C.E.
Moving Bed Biofilm Reactor Retrofit for Ammonia and Nitrate Removal
MONROE METROPOLITAN POLLUTION CONTROL SYSTEM BUDGET 1 FISCAL YEAR BUDGET Presented by Barry S. LaRoy, P.E. Director of Water & Wastewater Utilities.
United Water & Sanitation District Stonegate Village Metro District Water Supply Opportunities 1.
WEKIVA BASIN ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEM STUDY Bureau of Onsite Sewage Programs Division of Environmental Health Florida Department of.
Kasi Ross’ Colorado Report Kasi Ross’ Colorado Report Highways Capital Cities Parks History.
March 31st and April 1st, 2009Mile High Industrial and Automation Conference The Challenges in Upgrading Plant Automation for an Existing Wastewater Treatment.
Increasing Energy Efficiency at the Allegan WWTP MWEA/AWWA Joint Annual Conference August 19, 2010.
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
Water System Planning Study
GROSSMONT UNION HIGH SCHOOL DISTRICT CAPITAL PROGRAM OVERVIEW March 5, 2014.
A Proud Heritage of Military Engineering Kennedy/Jenks Consultants SAME San Diego Post - Featured Firm 11 February 2009.
Welcome to the Colorado boulders and this University is located at Boulder, Colorado xxx.
 Absolute location-The exact location of a place measured by it’s longitude and latitude  Relative location-describes a place with respect to its environment.
2012 – 2016 Financial Plan January 13,  Provide sewer collection and treatment to the City of Nelson  Treatment plant built in the ‘60’s  Nearly.
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
South Fork improvements program – a mid-program report
Persevering to Get What You Need Mark Estes HCSA Executive Director Scott Ehrhardt P.E, George Anipsitakis PhD P.E, HCSA Maple Ave Regional WWTP Expansion.
Ledyard Wastewater Facilities Management Plan A Presentation to the Ledyard Town Council/ Water Pollution Control Authority By Maguire Group Inc. January.
The effects of climate change on the grasshoppers of the southern Rocky Mountains of Colorado.
Santa Rita Wastewater Treatment Plant Alternative Site Investigation Addendum Sawmill Road Site.
City of McCall Sanitary Sewer I&I Study Community Stewardship for Economic Benefits Nathan Stewart, PE, City Engineer Matt Neukom, PE, Project Manager.
Wastewater Treatment Plant No. 2 Construction Contract City Council Workshop February 9, 2016.
1.  Accurate and timely intelligence shared by all  Effective tactics and strategies  Rapid deployment of resources  Relentless follow-up and assessment.
Town of Enfield : Upgrading the Water Pollution Control Facility & Collection System Jay Sheehan, PE Michael Burns, PE.
Rob Thompson, Director of Engineering April 7, 2016 Orange County Sanitation District.
WATER – WASTEWATER TREATMENT EXPERIENCE
Colorado Springs Utilities CH2M HILL Alumni Retreat
WATER – WASTEWATER TREATMENT EXPERIENCE
JEA’s Initiatives and Capital Improvements Program
County of Hawaii, Department of Environmental Management
Wastewater Treatment Plant Biological Nutrient Removal & Digester Project - Package 2 Construction Contract City Council Meeting – August 1, 2017 Package.
South Carolina Town of Kiawah Island June 7, 2016.
Elizabeth City Council
Sewage collection system of the Dan Region
Modifications at Existing WTP: $450,000 Construct New WTP: $39,100,000
Southern Delivery System
Vocational Training Institutes DBA Pima Medical Institute
Chief Executive Officer Chief Operating Officer
Students Seattle Chula Vista Tucson Phoenix El Paso East Valley
Wastewater Facilities Upgrade Project
2014 Vocational Training Institutes DBA Pima Medical Institute
Experiment #601 Long-term Top-Dress N Trial Stillwater, OK
A Tale of Two Plants: How Combining WWTP and WTP Improvements in Reidsville is Setting the Stage for the Future Kevin Irby, P.E. Kevin Eason, P.E
City Council Business Meeting
Sample Problems Calculus Bowl 2015
Sample Problems Calculus Bowl 2019
Capital Improvement Plan April 9, 2018 Status Update
Presentation transcript:

2015 Project Preview NUCA of Colorado TREATMENT PLANT PUMP STATION John Rehring, P.E. Wings Over the Rockies March 19, 2015

A Quick Look at What’s Already Underway

Colorado Springs Utilities Mesa WTP Improvements Est. bidding 2Q2016

Boulder WWTF Nitrogen Upgrades Est. Bidding 2Q2015

CSU Las Vegas WWTP Improvements Est. Bidding 3Q2015

MWRD South Headworks Improvements Est. Bidding 1Q2016

Centennial WSD Zone 4C Pump Station Est. Bidding 1Q2016

Aurora SCWRF UV Replacement Est. Bidding 1Q2016

ACWWA Connecting Main Est. Bidding TBD

2015 Project Preview NUCA of Colorado PUMP STATION TREATMENT PLANT John Rehring, P.E. jrehring@carollo.com 303.635.1220