News from R2E – Safe Room Proposal of local fire-resistant racks agreed upon Performed visit (HSE, EN-EL, R2E) to clarify details Solution already integrated.

Slides:



Advertisements
Similar presentations
Flow Charts and the Continuous Improvement Process 12/17/08.
Advertisements

HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
RADWG 6 TH TH OCTOBER 2012 G. Spiezia (EN/STI/ECE)
(1/15) 08/05/13 – RadWG meeting J. Mekki M. Brugger PS East Area Update Outline Layout updates of the facility Conveyer options Mock-up preparation and.
Safe-Room Status Intermediate ‘Conclusions’ M. Brugger (based on HSE discussion)
Follow-Ups and Notes. Project News LMC R2E (SEE Events) Update (see link)link RadWG SEE list (link) and Post-Mortem Database (link) synchronizedlink MCWG.
R2E Report M. Brugger for the R2E Study Group RadWG Meeting, August 20 th 2009.
R2E Status Report 18 th LSC Meeting, August 18 th 2013 CERN Radiation 2 Electronics (R2E) Project 18 th LSC Meeting August 16 th 2013 R2E Status Report.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
Francois BUTIN CERN EN/MEF.  Future of AD is clearer and deserves investment  New AEGIS experiment being prepared, requires new control room  Existing.
R2E Mitigation Project P5 Relocation Options - Discussion R2E Mitigation Project CMS Relocation Options Towards An R2E Baseline 1 M. Brugger for the R2E.
K. Foraz & Perrot A. L., EN/MEF - R2E Project LMC 25th May 2011 Thanks to EN/EL, EN/HE, EN/MEF, equipment owners the LHC integration team & the R2E team.
R2E relocation & shielding activities Anne Laure Perrot EN/MEF- LE R2E project meeting, 23 rd October 2012.
Build Customer Loyalty & Incremental Revenue
LS1preparation & planning status A L Perrot on the behalf of EN/MEF R2E project meeting 11 th May 2012 EN.
Design, integration and installation milestones Legend: 2015/Q1= 1 st quarter of 2015 (January-March) Phase 1 = proton & laser beams operation Phase 2.
Resources, Schedule and Risk Management Pierre Bonnal CERN DG-DI Projects Support Office 1 st HiLumi LHC Collaboration Meeting 16 th to 18 th November.
R2E Availability October 15 th 2014 Experience from Past LHC and Injector Operation and scaling to the future G. Spiezia.
R2E Point 5 mini safe room cooling / ventilation A. L. Perrot, 30 th April 2013.
R2E Mitigation Project Status Report 2 nd R2E Committee Meeting R2E Project Report.
PS-EA Update RadWG August 23 rd 2012 Radiation 2 Electronics (R2E) LHC Activities RadWG August 23 rd 2012 PS East Area Update M. Brugger on behalf of the.
Septum 16 shielding increase: result of phase 2 of “Avant projet” S. Gilardoni (BE/ABP) In collaboration with S. Roesler, D. Forkel-Wirth, S. Damjanovic,
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
Linac4 Project Meeting 1/2011 3/3/2011 M. Vretenar Update on schedule and structure 1.
R2E relocation & shielding LS1 preparation Anne Laure Perrot EN/MEF- LE Discussion with OP colleagues, 5 th July 2012.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
R2E Mitigation Project Review November 21 st – 24 th 2011 Intense program (link)link A few facts/highlights per session/task Calculations & Monitoring.
Use of PLAN in EN Department 1 st of April 2016 Michele Battistin.
(1/17) 14/11/13 – RadWG meeting PS East Area Update Outline Layout updates of the facility Conveyer Rail system Mock-up Other news.
Follow-Ups and Project Structure R2E Meeting September 8th Project / Study Group / RadWG R2E Mitigation Project:  Responsible of development and implementation.
R2E/Availability Workshop Report - RadWG October 22 nd 2014 R2E/Availability Workshop 2014 October th 2014 R2E/Availability Workshop RadWG - Brief.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
R2E Report – P5 Safe-Room Update 20 th LSC Meeting, September 13 th 2013 CERN Radiation 2 Electronics (R2E) Project 20 th LSC Meeting September 13 th 2013.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/02/04.
Integration of Demand Side Management, Distributed Generation, Renewable Energy Sources and Energy Storages Task status report, Task XVII EXCO meeting.
ECR (SPS Flange Impedance Reduction) Follow up for IWG C. Vollinger 16/08/2016.
LIU and TE/VSC activities LIU-SPS aC coating & flange impedance reduction Paul Cruikshank LIU & TE/VSC activities, 23/6/2016 Paul Cruikshank.
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
East Area Renovation Project Team meeting # 2 – EDMS News
ELENA installation and commissioning status
Feedback on two irradiation testing projects Emergency lights and TETRA system Elisa Guillermain
LIU Wire Scanner Milestones June 2017
Injector De-cabling Project
LIU – EVM status and next steps
EC Activities Status for the LIU
Unifying for all accelerators and projects
Lead bricks painting General procedure and its practical application
East Area Renovation Project team #6 Launch safety agreement
CMS November Upgrade Week
R2E – Experience and Outlook for LS1
RWTCS Steering Commitee
TI8/WIC Incident & UJ87/UA87 Radiation Levels & Analysis
East Hall under construction
K. Foraz on behalf of OSS members
Collimator Control (SEUs & R2E Outlook)
Verizon LSOG Meeting Objective
Preliminary Analysis and foreseen actions EN-ICE&EN-STI
RADIATION induced failures in LHC 28th June 2011
Installation of Photon Beam Transport to FEH
R2E LMC Update (Weeks 32/33) Post-Mortem database: SEE analysis and link to existing RadWG list in preparation Shielding block delivery crisis solved:
The HIE-ISOLDE Design Study and the CATHI Fellow Participation
R2E Follow-Ups and Project
East Hall under construction
Radiation Working Group RADWG
Open Points and More… Giulia / Michael / Sebastien / Maria.
EA Renovation Project – Project Team 29 – 28 June 2019 NEWS
SPS Planning meeting for LS2 #26 Vacuum sectors status
DS20k Integration Workshop
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

News from R2E – Safe Room Proposal of local fire-resistant racks agreed upon Performed visit (HSE, EN-EL, R2E) to clarify details Solution already integrated (thanks to EN/MEF, ICL) Follow-up required, but no further show-stopper ahead © ICL

Few Questions & Follow-Ups Integration/Implementation: All points towards final version (ECRs done for all shielding, P5 in circulation, P1/7 next); planning tight – margins? Radiation Tests & Facilities: Besides regular test campaigns (CNRAD & PSI), first trial(s) with external company (TRAD) -> not a ‘blackbox’ PS-EA facility: implementation starting R2E related Radiation Levels and Failures: Shielding for P1, need to wait for good statistics First R2E related failures currently analysed (PC, QPS,…)

Few Questions & Follow-Ups Towards implementation phase (LS1): EVM (proposal from Sylvain) to be checked (would be for implementation part only) Mini-Reviews to be scheduled QPS -> shall we go for beginning of September LS1 relocation & shielding -> October? RadMon-V2 -> November? Power-Converter -> early 2013 R2E Budget Expenditure for 2012 (see next slide) Review of years to come (in view of long-term solution(s))

Few Questions & Follow-Ups Radiation Levels No (or limited) Scrubbing what do we do for P4/P6, status of analysis Shielding wall in P1 -> height optimization (now also an impact from the earth-quake point-of-view Some more Purchase procedures/requirements (& delays) Destructive failure of aux-Alim (600A) Test candidate for SEL tests as a function of energy

Status of 2012 Budget