Street Improvement Plan

Slides:



Advertisements
Similar presentations
Street Conditions Part 1 – State of the Streets Part 2 – Repairs and Maintenance Costs Part 3 – Options for Funding.
Advertisements

City of Bloomfield Hills Asset Management Plan. Outline Overview plan Challenges and community input Recommendations for others.
The Dyer Partnership Engineers and Planners City of North Bend Pavement Management Plan & Street Utility Fee Analysis February 11, 2014.
Department of Public Works Bureau of Street Services Valerie Lynne Shaw President Department of Public Works.
ALLEGAN COUNTY PRIMARY ROAD MILLAGE AREA 2 JANUARY 21, 2014.
City of Auburn Hills Road Asset Management Program February 21, 2014 SEMCOG University.
Street Maintenance Funding Issues City Council Workshop April 1, 2013.
2014 STREET & UTILITY IMPROVEMENT PROJECT CITY COUNCIL MEETING November 18, 2013.
County of Orange Pavement Management System and Sustainable Treatment Program Clark Shen, Manager OC Construction Materials Lab Krishna Nadaraja, Senior.
Pavement Quality Survey Study Session 2012 Pavement Quality Survey Results Rehabilitation Costs Recent Public Input/Activity Comparison of County R&B.
CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG.
Department of Public Works Bureau of Street Services Valerie Lynne Shaw President Department of Public Works.
Pavement Preservation in South Carolina J. C. “Clem” Watson, P.E. Chief Engineer for Operations South Carolina Department of Transportation.
Pavement Preservation Protecting the Investment and the Environment R. Gary Hicks CP2 Center, Chico, CA Prepared for CEAC 2014 Conference March 26-28,
Street Maintenance. The Town of Bayfield maintains centerline miles of road.
Identifying Priority Projects for Funding Joan LeBlanc GOMC Council Coordinator.
Street Maintenance Program Update City Council Work Session February 5, 2013 Department of Public Works & Transportation.
STA Safety Project PID #76439 December 12, 2006.
Capital Improvements Program (CIP) Council Workshop January 29, 2008 Council Chambers 6:00 p.m.
We maintain streets with half the materials budget that we in had Due to inflation, today's dollar buys only half the materials it did in Therefore,
1% Sales Tax Commission Board Meeting June 3, 2015.
ORDINANCE # Authorizing $372,760 for traffic signal interconnect at 47 th Street and Emanuel Cleaver II Boulevard Start of project End of project.
FALL 2014 City of Artesia: Fiscal Challenges and Measure Y Information.
PUBLIC WORKS FY 2012 Proposed Budget May 24, 2012.
Region’s Core Services 202/17/2014 Integrity ∙ Excellence ∙ Respect Provide leadership, administrative support, procurement and budgetary and financial.
2013 Roads and Sidewalk Capital Programs Roads and Parks Maintenance Department Development & Infrastructure Division December 2, 2013.
Evergreen Highway Corridor Update Planning Commission Workshop March 22, 2016 Jennifer Campos, Senior Planner.
March  Finish Joint Sealing on Highlands Ranch Parkway  Finish Grinding on Lucent and Plaza and then Complete Joint Sealing  Start in Late.
STRONG NEIGHBORHOOD INITIATIVE Public Works Department January 30, 2007 Agenda item 8.01.
Public Works Infrastructure Update Public Works Department April 5, 2016.
FY 2017 BudgetHearing September 8, 2016 Mike Loftin, Assistant City Manager - Finance 1.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
Quality Pavement Preservation Projects
A Data-Driven Strategy to Improve the Quality
City of Charlottesville
2016 Mill and Overlay Project
City of Orinda 2017 Annual and Measure J &L Pavement Rehabilitation Projects City Projects No & 4115.
Transportation Development District Presentation
Thin Lift Asphalt Overlays
Roadway Pavement Management Plan
Village of Woodridge 2011 Pavement Analysis
The Gainesville Area Chamber Infrastructure Investment Initiative
City of Abilene Pavement Condition Survey 2017 Results and Discussion
Boulder Junction Town Road Improvement Project
Town of Clayton 2016 Pavement Condition Survey
Boulder Junction Town Road Improvement Project
FY 2012 Status Report on the North Mainland (Ormond Crossings CRA)
Surface Preparation before laying Hot Mix
Pavement condition index calculation
Barry Paye, PE Chief Materials & Pavement Engineer Wisconsin DOT
City-wide LED Street Light Conversion Program
2018 Pavement Workshop May 23-24, 2018
Pavement Preservation
Development of An Advance Overlay Design System Incorporating Both Rutting and Reflection Cracking Requirements Rick Collins TxDOT.
Issaquah-Fall City Road
Participatory Road Program neighborhood meeting Donahoo 174th Street
Pavement Performance Measures In Georgia
Village of Sherwood Stumpf Subdivision Paving and Drainage Improvements November 7, 2018.
Board of Education Budget Workshop March 23, 2017
Adoption of the FY Capital Improvement Program Budget
Pavement Improvement Plan 2009
Walker Street Reconstruction Project 25% Design Public Hearing
Pavement Preservation Philosophy utilizing Pavement Management Systems
NRRA Pavement Workshop 2019
NRRA Pavement Workshop 2019
Monterey County Project Report for Measure X Expenditures
Hoops, haddock, cascade, oriole, Ervin and valley view heights paving
ACEC Designer Training
Larimer County: engineering
Presentation transcript:

Street Improvement Plan Fiscal Year 2017 City Council Workshop December 12, 2016

Street Improvement Funding $1.8 million in FY 2017 General Fund Budget - for Yearly Street Maintenance projects covering 347 centerline miles. To maintain and improve neighborhood streets utilizing the prioritization factors To address potholes, utility cut repairs and other maintenance and repairs $10 million over 5 yrs from the 2013 Bond Program for City-wide street projects For work on larger arterial and collector streets $39 million in major bond projects approved by voters Morningside Drive, Rueckle Road, Solms Road and Klein Road

Public Input Public Meeting held on November 21st Online Survey from November 22nd - Dec 4th

Online Survey Questions Please provide the name of the street we should evaluate for potential inclusion in the program, along with the particular segment. Please provide a brief description of the problems you have observed on this street (such as potholes, water ponding, large cracks, buckling, etc.) Are there additional streets you would like for us to evaluate? Do you have other comments or concerns you would like to share with us concerning non-TxDOT streets inside the City limits of New Braunfels?

Public Input Total Comments – Public Meeting and Online Surv Roadway Conditions: 90 Drainage: 9 Traffic Control: 11 General: 11

Public Input Total Comments – For Each Council District District 1: 26

Public Input Map

Public Input Heat Map

Changes From Public Input Added Streets Highlighted in Yellow on “FY 2017 Street Improvement Plan” Spreadsheet Revised Klingemann Street Highlighted in Green, Streets for Underrun in project funds

Maintenance & Repair Strategies Potholes & Utility Cut Blade Level Up - Application of hot mix asphalt (HMA) to smooth roadway and remove rutting Preventative Maintenance Crack Seal – application of a sealant to prevent intrusion of water Limited overlay – a 1” HMA overlay on a seal coat Rehabilitation Mill and overlay - spot base repair, mill existing asphalt to level surface and asphalt overlay Reconstruction Requires curb work, subgrade improvements, grade modification, new base, and asphalt surface

General Fund Street Projects Proposed 2017

Fiscal Year 2018 Plan The Street Improvement Plan for FY 2018, Public Works will conduct public input meeting, online survey and Council consideration Spring 2017 to prepare for budget discussions.