The Howe Bridge truss is subjected to the loading shown
Mechanical Analysis of Dipole with Partial Keystone Cable for the SIS300 A finite element analysis has been performed to optimize the stresses in the dipole.
Mechanical Design & Analysis Igor Novitski. Outlines Electromagnetic Forces in the Magnet Goals of Finite Element Analysis Mechanical Concept Description.
LHQ Coil 02 Winding and Curing Plan Miao Yu 03/21/13.
LHQ Coil 1 OL Curing LHQ Coil 1 Shipping Miao Yu 02/28/2013.
Mechanics of Materials – MAE 243 (Section 002) Spring 2008 Dr. Konstantinos A. Sierros.
QXFSM1 Mirror Shim System R. Bossert Dec. 1, 2014 LARP Teleconference.
Racetrack Coil Technology – G. Ambrosio 1 LARP DOE review – FNAL, June. 5-6, 2007 BNL - FNAL - LBNL - SLAC Racetrack Coil Technology (LR, SQ) & other Supporting.
Cable inventory, relative measurements and 1 st mechanical computations STUDY OF THE QUADRUPOLE COLLAR STRUCTURE P. Fessia, F. Regis Magnets, Cryostats.
S. Caspi, LBNL HQS Progress Report High Field Nb 3 Sn Quadrupole Magnet Shlomo Caspi LBNL Collaboration Meeting – CM11 FNAL October 27-28, 2008.
Plastic Deformations of Members With a Single Plane of Symmetry
 2005 Pearson Education South Asia Pte Ltd TUTORIAL-1 : UNIAXIAL LOAD 1 PROBLEM-1 1 m P A composite A-36 steel bar shown in the figure has 2 segments,
PROBLEM mm x y 800 mm P = 1500 N z y 50 mm 100 mm
LARP QXF 150mm Structure Mike Anerella / John Cozzolino / Jesse Schmalzle November 15, nd Joint HiLumi LHC-LARP Annual Meeting.
Coil parts & Instrumentation issues for LQ/HQ coils tested at Fermilab HQ/LHQ coil parts task force.
2 nd Joint HiLumi LHC – LARP Annual Meeting INFN Frascati – November 14 th to 16 th 2012 Helene Felice Paolo Ferracin LQ Mechanical Behavior Overview and.
REMINDERS HW#5 due Friday Feb 28 Read 4.5 for Friday 1.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
FNAL QXF Curing Mold Miao Yu, FNAL 05/07/2013. FNAL Short Curing Press 2 2 meter long Capacity (pump psi) Max. force/cylinder kN (ton) Spacing cm(inch)
 2005 Pearson Education South Asia Pte Ltd TUTORIAL-1 : UNIAXIAL LOAD 1 PROBLEM-1 1 m P A composite A-36 steel bar shown in the figure has 2 segments,
Christian Löffler TE-MSC. Current design ( ) Goals for analysis Pushing unit – structural strength - pushing unit – uniformity of stress in the.
MQXF support structure An extension of LARP experience Helene Felice MQXF Design Review December 10 th to 12 th, 2014 CERN.
Results of Linear Stress Analyses for Modular Coils and Coil structure For 2T High Beta Currents at 0 Seconds and Initial Coil Shrinkage of in/in.
Subscale quadrupole (SQ) series Paolo Ferracin LARP DoE Review FNAL June 12-14, 2006.
Hybrid Structure with Cooling John Cozzolino LARP Collaboration Meeting Port Jefferson, NY November 4-6, 2009.
Magnet design, final parameters Paolo Ferracin and Attilio Milanese EuCARD ESAC review for the FRESCA2 dipole CERN March, 2012.
A cast-iron machine part is acted upon by a 3 kN-m couple
HQM01 Test Summary Outline -Magnet Instrumentation and Shim System -SG Data -Short Sample Limits -Quench Training at 4.6 K and 2.2 K -Ramp rate and Temperature.
S. Caspi, LBNL TQS – Progress and plans Shlomo Caspi LBNL Collaboration meeting FNAL April
1 BNL -FNAL - LBNL - SLAC P. Wanderer IR’07 - Frascati 7 November 2007 U.S. LARP Magnet Programme.
Structural Drafting Shear stress in Bolts. Fastener Loads and Stresses Load:External force applied to a member. Stress: Internal force acting on a member.
Cold Mass and Assembly Tooling Design, Procurement Status and Assembly Plan Igor Novitski Fermilab 15 T Dipole Design Review April 2016 April 28-29,
TQC03e Test Status  Magnetic measurements at 300 K  Z-scan at ±10 A  Magnetic measurements at 4.6 K (I max up to 6.5 kA)  Quench training and ramp.
CONCEPTUAL DESIGN OF D2 MECHANICAL STRUCTURE (DOUBLE COLLARING OPTION) S. Farinon, P. Fabbricatore (INFN-Sezione di Genova) Sept. 24 th 2015.
LQM01 Test Summary Guram Chlachidze LARP CM16 Montauk, NY May 16-18, 2011.
3 rd ESAC Review, 27 th February to 1 st March 2013, CEA Saclay Fresca2 Dipole Structure Assembly J.C Perez on behalf of Fresca2 collaboration team.
CONCEPTUAL DESIGN OF D2 MECHANICAL STRUCTURE S. Farinon, P. Fabbricatore (INFN-Sezione di Genova) Sept. 17 th 2014.
1 Long QXF Mirror Fabrication (MQXFPM1) Rodger Bossert HiLumi-LARP Collaboration Meeting May 18-20, 2016 SLAC R. Bossert - HiLumi Collaboration Meeting.
1 MQXFS Mirror Fabrication R. Bossert, G. Chlachidze, S. Stoynev HiLumi-LARP Collaboration Meeting May 11-13, 2015 FNAL.
Helene Felice Team: Dan Cheng, Daryl Horler, Paul Bish, Hugh Highley and Nate Liggins Thank you to Paolo Ferracin, Gianluca Sabbi and Franck Borgnolutti.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Page 1 TQC Mechanical Model Igor Novitski / Rodger Bossert May 24, 2006 Results of MM#4 and MM#5.
1. Two rods, one of nylon and one of steel, are rigidly connected as shown in Fig. P.1.2. Determine the stresses and axial deformations when an axial load.
MQXFPM1 and MQXFS1b Test Results
TQS Overview and recent progress
TQ Program and Review Charge
HQ02b Preload Increase - Summary
HQ Mirror Assembly R. Bossert
TQS Structure Design and Modeling
Mechanical tolerance analysis for the MQXF prototype structures
Support structure and target pre-stress
SQXF Mirror QXFSM1 Strain Gauges
LARP Technology Quadrupole Review
FRESCA2 Update on the dipole design and new calculations
Helene Felice 02/15/2013 HiLumi Meeting HQ Program
Bore quench field vs. critical current density
MBHSP02 test STATUS and first results
the MDP High Field Dipole Demonstrator
MKQXF FEA Model Haris Kokkinos
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
MQXFAP2 SG Readings ---Update (up to quench #22)
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
FRESCA2 - Coils 1+2 scenario
Helene Felice 02/15/2013 HiLumi Meeting HQ Program
Long term behavior and high-QI test in the MQXFS program
HQ test at CERN: strain and stress measurements
Pole Position Student Points Time
A B C D.
Visit for more Learning Resources
Presentation transcript:

TQC-01 SG data I. Novitski

COOL DOWN FROM 300K TO 4K T, K Time

QUENCH HISTORY 17 10 I, A Quench 11 Coil 12 12 10 13 14 13 15 13 16 13 Time

SKIN AND CONTROL SPACERS

Skin Skin stress at the straight section after CD increased by 167MPa Delta F=11172 lbs/in Skin stress at 4K ~290MPa Skin stress at 4K at the end section increased by ~30MPa Delta F~2000 lbs/in Skin stress at 4K ~190MPa

R, ohm R, ohm R, ohm R, ohm

R, ohm Time

R, ohm R, ohm R, ohm R, ohm

Control Spacers Left-right asymmetry in load Spacer 13 has smallest load increase after CD Avr. Strain increased ~500-800ustr Avr. Force increased ~12000-17000lbs/in

R, ohm Time

R, ohm R, ohm R, ohm R, ohm

COILS 12 13 10 9

2 mil shim 17 mil SS shim 17 mil SS shim 17 mil SS shim 17 mil SS shim

Coils for TQC-01

Azimuthally COIL MC COIL LJ

Coils Azimuthally Coil stress loss due to CD at MC ~15-40 MPa Coil stress loss due to CD at LJ ~30-60 MPa Coil stress after CD at MC ~75-100 MPa Coil stress after CD at LJ ~ 30-50 MPa

R, ohm Time

R, ohm Time

R, ohm R, ohm R, ohm R, ohm

R, ohm Time

R, ohm Time

R, ohm R, ohm R, ohm R, ohm

Z-direction POLE LJ END POLE

Coils in Z-direction Stress loss due to CD at Pole LJ ~20-60 MPa Stress loss due to CD at Pole End ~110-150 MPa Inner pole after CD under compression ~10(LN comp.)MPa End pole after CD under compression ~80-120 MPa

R, ohm Time

R, ohm R, ohm R, ohm

R, ohm Time

R, ohm R, ohm R, ohm

BULLETS LOAD AT 300K 14000 N

Bullets The total axial Lorentz force is 330.6kN at 13 kA. Applied forces at 300K ~750lbs Remains in contact after CD to 4K Force increase at 9kA ~1000-1500lb per bullet

R, ohm Time

R, ohm R, ohm R, ohm R, ohm